Works left -> right. Vidyo meeting = 1: F2F meeting = 5 (last time minutes taken in brackets)
 
Works left -> right. Vidyo meeting = 1: F2F meeting = 5 (last time minutes taken in brackets)
  
IN:  Dan=12, Duncan=14 (28.06.16), Raul=13, Alessandra=14 (03.05.16), Brian=14 (10.05.16), AndrewM=14 (17.05.16), Kashif=14 (22.03.16),  
+
IN:  Dan=14(28.6.16), Duncan=15 (28.06.2016), Raul=14 (05.07.2016), Alessandra=14 (03.05.16), Brian=14 (10.05.16), AndrewM=14 (17.05.16), Kashif=15 (19.07.16),  
Daniela=14 (15.03.16), Pete=14 (24.05.16), Matt=14 (26.01.16), Gareth=14,  Jeremy=15 (12.01.16), Sam=15 (31.05.16), David=15 (14.06.16), Stephen=16 (07.06.16)
+
Daniela=14 (15.03.16), Pete=14 (24.05.16), Gareth=14,  Jeremy=15 (12.01.16), Matt=15 (12.07.16), Sam=15 (31.05.16), David=15 (14.06.16), Stephen=16 (07.06.16)
  
 
OUT: Mark=6 Chris=9 Wahid=11 Ewan=13  
 
OUT: Mark=6 Chris=9 Wahid=11 Ewan=13  
Line 26: Line 26:
 
!Notes
 
!Notes
  
|-
 
|O-160524-01
 
|Follow up with Lydia about current DiRAC status
 
|Brian
 
|2016-05-31
 
|Closed
 
|2016-06-28
 
|
 
  
 
|-
 
|-
Line 49: Line 41:
 
|Jeremy
 
|Jeremy
 
|2016-05-31
 
|2016-05-31
|Open
+
|Closed
|
+
 
|
 
|
 +
|Rota extended w/c 1st August. Need to reconfirm Tier-1 effort.
  
  
Line 72: Line 64:
 
| <s>Discuss whether all the regional VOs should be in this project.</s> All four regional VOs should be supported in VO Nagios in principle, but implementation is not urgent. There is now less emphasis on the regional VOs and it is technically difficult to add them due to the lack of current support of the SAM nagios project and the wish to not beak the existing setup. On hold as of 19/1/2016
 
| <s>Discuss whether all the regional VOs should be in this project.</s> All four regional VOs should be supported in VO Nagios in principle, but implementation is not urgent. There is now less emphasis on the regional VOs and it is technically difficult to add them due to the lack of current support of the SAM nagios project and the wish to not beak the existing setup. On hold as of 19/1/2016
  
 +
|-
 +
|O-160712-01
 +
|Jeremy to investigate Indico options for uploading minutes.
 +
|Jeremy
 +
|
 +
|In progress
 +
|
 +
|
  
 +
|-
 +
|O-160712-00
 +
|Assign ticket to Argo devs regarding failures at Glasgow
 +
| Kashif
 +
| 27-06-2016
 +
| On going
 +
|
 +
| As discussed in today's meeting, argo needs to add some tweaks to the setting that Kashif had applied to the old gridppnagios services.
 
|
 
|
 
|}
 
|}

Revision as of 12:12, 22 July 2016

Count list for minute taking

Works left -> right. Vidyo meeting = 1: F2F meeting = 5 (last time minutes taken in brackets)

IN: Dan=14(28.6.16), Duncan=15 (28.06.2016), Raul=14 (05.07.2016), Alessandra=14 (03.05.16), Brian=14 (10.05.16), AndrewM=14 (17.05.16), Kashif=15 (19.07.16), Daniela=14 (15.03.16), Pete=14 (24.05.16), Gareth=14, Jeremy=15 (12.01.16), Matt=15 (12.07.16), Sam=15 (31.05.16), David=15 (14.06.16), Stephen=16 (07.06.16)

OUT: Mark=6 Chris=9 Wahid=11 Ewan=13

Minutes can be found at: Operations

Action list

Please put the new issues at the top.

Action ID Action description Owner Target date Status Date closed Notes


O-160524-02 Look at the storage page on the GridPP wiki to see if it is up to date Sam 2016-06-30 Open
O-160524-03 Create new ROD rota Jeremy 2016-05-31 Closed Rota extended w/c 1st August. Need to reconfirm Tier-1 effort.


O-160116-01 Jeremy to follow up about making glue alarm not critical Jeremy In progress Pass on feedback to ask for glue alarm to be made non-critical [referencing https://ggus.eu/?mode=ticket_info&ticket_id=118930]
O-150327-02 Put Northgrid VO and other regionals in VO Nagios project Kashif, Alessandra 27-06-2015 on going Discuss whether all the regional VOs should be in this project. All four regional VOs should be supported in VO Nagios in principle, but implementation is not urgent. There is now less emphasis on the regional VOs and it is technically difficult to add them due to the lack of current support of the SAM nagios project and the wish to not beak the existing setup. On hold as of 19/1/2016
O-160712-01 Jeremy to investigate Indico options for uploading minutes. Jeremy In progress
O-160712-00 Assign ticket to Argo devs regarding failures at Glasgow Kashif 27-06-2016 On going As discussed in today's meeting, argo needs to add some tweaks to the setting that Kashif had applied to the old gridppnagios services.

See also: Operations Team Completed Actions and Operations Issues . (The Operations Issues page has never been used. Can be abandoned ?)