|Follow up with Lydia about current DiRAC status
 
|Follow up with Lydia about current DiRAC status
 
|Brian
 
|Brian
|
+
|2016-05-31
 
|Open
 
|Open
 
|
 
|
Line 38: Line 38:
 
|Look at the storage page on the GridPP wiki to see if it is up to date
 
|Look at the storage page on the GridPP wiki to see if it is up to date
 
|Sam
 
|Sam
|
+
|2016-06-30
 
|Open
 
|Open
 
|
 
|

Revision as of 13:19, 27 May 2016

Count list for minute taking

Works left -> right. Vidyo meeting = 1: F2F meeting = 5 (last time minutes taken in brackets)

IN: Raul=13, Dan=12, Kashif=14 (22.03.16), Sam=14, (23.02.16), Daniela=14 (15.03.16), Duncan=13 (10.11.15), Pete=13 (16.02.16), Matt=14 (26.01.16) Gareth=14, Stephen=15 (05.04.16) , David=14 (19.01.16) Jeremy=15 (12.01.16), Alessandra=14 (03.05.16), Brian=14 (10.05.16), AndrewM=14 (17.05.16)

OUT: Mark=6 Chris=9 Wahid=11 Ewan=13

Minutes can be found at: Operations

Action list

Please put the new issues at the top.

Action ID Action description Owner Target date Status Date closed Notes
O-160524-01 Follow up with Lydia about current DiRAC status Brian 2016-05-31 Open
O-160524-01 Look at the storage page on the GridPP wiki to see if it is up to date Sam 2016-06-30 Open
O-160315-01 Follow up UKQCD status Sam 2016-03-22 Open
O-160116-01 Jeremy to follow up about making glue alarm not critical Jeremy In progress Pass on feedback to ask for glue alarm to be made non-critical [referencing https://ggus.eu/?mode=ticket_info&ticket_id=118930]
O-150327-02 Put Northgrid VO and other regionals in VO Nagios project Kashif, Alessandra 27-06-2015 on going Discuss whether all the regional VOs should be in this project. All four regional VOs should be supported in VO Nagios in principle, but implementation is not urgent. There is now less emphasis on the regional VOs and it is technically difficult to add them due to the lack of current support of the SAM nagios project and the wish to not beak the existing setup. On hold as of 19/1/2016
O-160126-01 State UK Position on CPU publishing in the NGI's ticket on the matter, or the parent Jeremy, Matt 01-02-2016 In progress NGI Ticket https://ggus.eu/?mode=ticket_info&ticket_id=118930, Parent Ticket https://ggus.eu/index.php?mode=ticket_info&ticket_id=118932

See also: Operations Team Completed Actions and Operations Issues . (The Operations Issues page has never been used. Can be abandoned ?)