Operations Report 29/03/2010

From GridPP Wiki
Revision as of 12:57, 29 March 2010 by Richard sinclair (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Summary of Previous Week

  • Clean Up of Non-Atlas LFC
  • Meeting with CERN Regarding Potential CASTOR Hardware
  • Improved SLS Database Monitoring
  • Backup and Recovery Documentation
  • Talk for Open Day

Operational Issues and Incidents

None

Plans for Week(s) Ahead

  • Finalising Add/Delete Node Procedures (for CASTOR server replacement)
  • Continuing New CASTOR Hardware Investigation
  • Test CASTOR 2.1.8/2.1.9 Upgrade Against Production ATLAS Snapshot

Downtimes and At Risk

None


Development Priorities

  • Migrate ATLAS TAGs to 64bit systems
  • Investigate ORACLE replication technique for LFC/FTS resilience
  • Investigate hardware architecture, backup and recovery strategy, resilience and validation of restored backup.


Requirements and Blocking Issues

None

OnCall

  • Keir

Absences

Eter - All Week Carmine - Monday