Difference between revisions of "Operations Report 26/10/2009"
From GridPP Wiki
(No difference)
|
Latest revision as of 14:27, 26 October 2009
Contents
Summary of Previous Week
Developments
- Castor: SRM upgrated (ATLAS,LHCb)
- 3D/Castor: workshop in November to review and test our backup strategy
Operational Issues and Incidents
- CASTOR: Lost backup area on RACs head nodes(Pluto1,Neptune1).
Plans for Week(s) Ahead
- Preparing document about our new backup and oracle resilience configuration.
Downtimes and At Risk
Description | Start | End | Affected VO(s) |
---|---|---|---|
SRM upgrade | 27/10/2009 10:00am | 27/10/2009 12:00pm | CMS and GEN |
Development Priorities
- CASTOR Database Monitoring
- Migrate ATLAS TAGs to 64bit systems
- Investigate ORACLE replication technique for LFC/FTS resilience
Requirements and Blocking Issues
Description | Required By | Priority | Status |
---|---|---|---|
Hardware for Tag databases | Medium | Waiting | |
Hardware to test LFC database replication | Medium/high | Waiting |
OnCall
- Carmine Cioffi