Operations Report 26/09/2011

From GridPP Wiki
Revision as of 13:08, 26 September 2011 by Carmine cioffi (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Summary of Previous Week

  • CASTOR: Waiting on Martin to re-config the hardware
  • CASTOR: Eddy will be looking after pre-prod and certification databases

Operational Issues and Incidents

Plans for Week(s) Ahead

  • CASTOR: Reconfiguring new hardware to replicate problems (asnd test potential firmware fix)
  • CASTOR: Testing tape backups for new hardware

Downtimes and At Risk

Description Start End Affected VO(s) Type

Development Priorities

  • Test and migrate to new HW

Requirements and Blocking Issues


OnCall

  • Carmine

Absences