Operations Report 07/11/2011

From GridPP Wiki
Revision as of 15:54, 7 November 2011 by Carmine cioffi (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Summary of Previous Week

  • CASTOR: SLS for Castor Gen istance has been sorted out
  • CASTOR: Dataguard testing has finished. Now passed to Martin to final configuration

Operational Issues and Incidents

  • Castor: Pluto 2 crashed (cdbe02)

Plans for Week(s) Ahead

  • CASTOR: test the new hardware hard ware as soon as Martin finish to set the new configuration
  • CASTOR: Testing/installing the new CPU on pre-prod and certification


Downtimes and At Risk

Description Start End Affected VO(s) Type

Development Priorities

  • Test and migrate to new HW
  • GC resilience

Requirements and Blocking Issues

  • None


OnCall

  • Keir tonight
  • Rich the rest of the week

Absences

Keir: Mon, Fri