Operations Bulletin Latest

From GridPP Wiki
Jump to: navigation, search

Bulletin archive


Week commencing 15th June 2015
Task Areas
General updates

Tuesday 16th June

  • The minutes of the [GDB] last week are available.
  • ATLAS has re-classified the following sites as “ATLAS Tier 3” in AGIS (this classification being based upon minimum resource requirements): UKI-LT2-UCL-HEP UKI-LT2-IC-HEP; UKILT2-Brunel; UKI-SOUTHGRID-SUSX and UKI-SCOTGRID-DURHAM.
  • JANET is working with Imperial College to establish a VRF to perform tests of a connection to LHCONE.
  • Please could everyone who supports gridpp ensure that the site accepts jobs with the pilot role? In addition please also consider the other VOs mentioned in Daniela's email (17:30 on 15th June).
  • Glasgow: VO Shares and ARC CE config question.
  • WLCG workshop 2016: last call for volunteers.


Tuesday 9th June

  • ARC issue: Arc wrapper is changing the permissions of certain job files. Actually it changes the permissions of file with suffix ".comment" and only for jobs that are coming from certain WMSes.
  • A/R for May:
    • ALICE:
      • ok.
    • ATLAS:
      • UCL: 37%:77%
      • Birmingham: 75%:75%.
    • CMS:
      • ok.
    • LHCb:
      • QMUL: 78%:78%.
      • Liverpool: 88%:88%
      • Sheffield: 88%:88%.

Tuesday 25th May

  • VO updates:
    • LIGO issue looked like DNS resolution issue. Sam following up this week. Noted DIRAC errors truncated. Suggested trying non-IC disk. Tom reported: CERN@school-enabled disks - QMUL-disk, GLASGOW-disk and LIVERPOOL-disk worked on every network tried with various instances of the GridPP CernVM with the DIRAC UI installed... so issue elsewhere.
    • LZ: Andy W: Met Paolo (Edinburgh) from LZ to walk through the basics (in parallel with LZ computing on the Grid being established). AW joined the GridPP VO to assist.
    • gridpp-support at jiscmail ac uk created.
  • Friday WMS issue?: svr024.gla.scotgrid.ac.uk has been removed from the Nagios configuration. Most CEs quickly returned from 'unknown' state, and others came back to normal in the next round of tests.
  • Tier-1problems with secondary database system for Castor - resolved quickly.
WLCG Operations Coordination - Agendas

Tuesday 16th June

  • The next WLCG ops coordination meeting is this Thursday 18th June: Agenda. There will be presentations and discussions on the Information System.
  • The next middleware readiness meeting is on Wednesday 17th June @ 3pm BST: Agenda.


Tuesday 9th June

  • There was a WLCG ops coordination meeting on Thursday 4th June: [1]: Minutes.
  • News: Next WLCG workshop Jan or Fed 2016 (24/01-06/02). Hosting call open.
  • Baselines: New gfal2 (2.9.2) includes FTS 3.2.33 related bug fix.
  • MW issues: new version of a Globus library (globus-gssapi-gsi-11.16-1) released in EPEL testing breaks at least MyProxy and FTS. (GGUS:114076)
  • T0/T1 services: CERN LFCs to go 22nd June. Various dCache updates.
  • T0 news: NTR
  • T1 feedback: NTR
  • T2 feedback: NTR
  • ALICE: Smooth Run-2 start.
  • ATLAS: Smooth start. Rucio good. mc15 (mcore) running well. High-level trigger repro 1st week done. T0 WNs slow perhaps due to OpenStack update. FTS bring online daemons issue.
  • CMS: Digi-Reco going well. T0 cores quota increased. Bad transfers from T0 being investigated.
  • LHCb: T1 request for RAW data to go to same tape set where possible.
  • gLExec: NTR
  • RFC proxies: Tried on sam-alice-preprod and led to unstable proxies. Fix needed.
  • M/J features: NTR
  • MW readiness: MW readiness app moved to production node. Next meeting 17th June @ 3pm BST.
  • Multicore: ATLAS goal is 80% production resources to be MC.
  • IPv6: NTR
  • Squid mon/HTTP proxy discovery: Slow progress but picking up.
  • Network & transfer metrics WG: PS update at LHCOPN-LHCONE meeting. Meshes now stable. RAL issues with latency and bandwidth. Parsing trace path results bug found. Network incidents process defined. Next meeting 10th June (to cover WLCG meshes, proximity service and FTS performance).
  • HTTP Deployment TF: Second meeting was on 3rd June.


Tier-1 - Status Page
  • A reminder that there is a weekly Tier-1 experiment liaison meeting.
  • The agenda follows this format:
    • 1. Summary of Operational Status and Issues
    • 2. Highlights/summary of the Tier1 Monday operations meeting (Grid Services; Fabric; CASTOR and Other)
    • 3. Experiment plans and operational issues (CMS; ATLAS; LHCb; ALICE and Others)
    • 4. Special presentations
    • 5. Actions
    • 6. Highlights for Operations Bulletin Latest
    • 7. AoB

Tuesday 16th June

  • We have announced an outage tomorrow, Wednesday 17th June. There will be a 15-minute break in connectivity to the Tier1 between 2 and 2.30 (BST) when all services will be unavialable. Castor will be shutdown just before this and restarted afterwards. This is to enable a test of a change to our network configuration that was made a couple of weeks ago.
Storage & Data Management - Agendas/Minutes

Wednesday 17 June

  • EU projects - SAGE: HSM for HPC
  • Progress on new VOs. Can test as members of 'gridpp' or similar until they get their own allocations.
    • We've talked about it before; should VOs have individual T2 allocations to avoid stepping on each other's toes?
    • Case for expanding back-up-into-T1 to other VOs?

Wednesday 27 May

  • Working on troubleshooting DIRAC data for/with LIGO (not to be confused with DiRAC or with any of the other things called DiRAC)
  • Working on setting up DiRAC at Tier 1 (not to be confused with DIRAC or Dirac or with any other thing called Dirac)
  • New secret user support list!

Tuesday 18th May

Tuesday 21st April

  • Has there been any Tier-1 contact with DiRAC?
  • Proposal to setup an 'other VOs' users list. GridPP-Users is too tied with WLCG projects.

Wednesday 15 April

  • Backing up data from DiRAC to GridPP (tape)
  • More case studies on supporting non-LHC VOs on GridPP: we have a lot of great stuff that can do great stuff - non-LHC VOs tend to have less regimented data models so maybe we need more case studies.


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 16th June

  • Region not publishing accounting by number of cores.
    • "0" core submission hosts:
    • ce3.dur.scotgrid.ac.uk
    • ce4.dur.scotgrid.ac.uk
    • cetest02.grid.hep.ph.ic.ac.uk
    • hepgrid5.ph.liv.ac.uk
    • hepgrid6.ph.liv.ac.uk
    • hepgrid97.ph.liv.ac.uk
    • svr009.gla.scotgrid.ac.uk
    • t2ce06.physics.ox.ac.uk

Tuesday 9th June

  • Delay noted for Sheffield

Tuesday 26th May

  • Delay noted for Sheffield.

Tuesday 12th May

  • Issues noted with sync for Brunel, Liv, ECDF (see EGI ticket 113473). Message broker issues (memory related) are likely the underlying EGI problem.
  • Need to check on VAC sync publishing.


Documentation - KeyDocs

Tuesday 9th June

LSST voms2 records are not present in VOID cards yet. As a workaround, a temporary note of the actual values has been added to the LSST section of Approved VOs.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Tuesday 21st April

  • The Approved VOs document has been updated to take account of changes to the Ops Portal VOID cards.For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk and voms03.gridpp.ac.uk have both been updated from 15003 to 15503. Sites that support SNOPLUS.SNOLAB.CA should ensure that their configuration conforms to these settings: Approved VOs
  • KeyDocs still need updating since agreements reached at last core ops meeting.
  • New section in Wiki called "Project Management Pages".
The idea is to cluster all Self-Edited Site Tracking Tables
in here. Sites should keep entries in Current Activities
up to date. Once a Self-Edited Site Tracking Tables has
served its purpose, PM to move it to  Historical Archive 
or otherwise dispose of the table.
Interoperation - EGI ops agendas

Monday 15th June

  • There was an EGI operations meeting today: agenda.
  • New Action: for the NGIs: please start tracking which sites are still using SL5 services: how many services, and for each service if still needed on SL5, if upgrades on SL5 services are expected). A wiki has been provided to record updates. Also interesting to understand who is using Debian.

Tuesday 21st April

  • There was an EGI ops meeting on Monday 20th.
  • David updated the UK SL5 response.
  • Please review the agenda/minutes.


Monitoring - Links MyWLCG

Tuesday 16th June

  • FN & DC decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


Tuesday 31st March

Monday 7th December

On-duty - Dashboard ROD rota

Monday 8th June

  • The eu.repository has now made a comeback, so the arc alarms, cleared, but I the site availabilities (probably) need to be corrected.
  • Still getting on/off bdii alarms for a variety of sites.

Monday 11th May

  • Rota responses awaited from Andrew and Daniela.
  • Handover summary should be uploaded to the bulletin please.


Rollout Status WLCG Baseline

Tuesday 12th May

  • MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.

Tuesday 17th March

  • Daniela has updated the [ https://www.gridpp.ac.uk/wiki/Staged_rollout_emi3 EMI-3 testing table]. Please check it is correct for your site. We want a clear view of where we are contributing.
  • There is a middleware readiness meeting this Wednesday. Would be good if a few site representatives joined.
  • Machine job features solution testing. Fed back that we will only commence tests if more documentation made available. This stops the HTC solution until after CHEP. Is there interest in testing other batch systems? Raul mentioned SLURM. There is also SGE and Torque.

References


Security - Incident Procedure Policies Rota

Tuesday 16th June

  • Security team meeting this Wednesday.
  • One topic for review concerns ES.

Tuesday 9th June



Services - PerfSonar dashboard | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Tuesday 12th May

  • LHCOPN & LHCONE joint meeting at LBL June 1st & 2nd. Agenda taking shape.

Tuesday 31st March

Tuesday 10th March

  • From the recent WLCG meeting, two slides (1 & 2) give the direction of the network monitoring and metrics progress: integration of perfSONAR event types into experiment monitoring and an architecture for data to get from RSV probes to client. Components described on slide 3.
  • The next LHCOPN and LHCONE joint meeting will take place on Monday 1st and Tuesday 2nd of June 2015 in Berkeley (US) (hosted by LBL and ESnet).
Tickets

Monday 15th June 2015, 14.15 BST

Other VO nagios:
ce05.esc.qmul.ac.uk and hepgrid11.ph.liv.ac.uk seem to be having a spot of bother for multiple VOs, and hepgrid2.ph.liv.ac.uk seems to be starting to have trouble too.

19 Open UK Tickets this week.

NGI
114233 (10/6)
John Gordon ticketed the NGI (as well as others) about some sites in the UK not publishing core counts with their APEL numbers (or more precisely have submission hosts at that site not publishing). Following the link it looks like Imperial, Liverpool, Durham, Glasgow and Oxford are on this list, I've listed the submission hosts reporting "0" core jobs below to help people clear up their rogues! If you've only fixed things in the last fortnight you'd still show up on this list. In progress (15/6)

"0" core job submission hosts:
ce3.dur.scotgrid.ac.uk
ce4.dur.scotgrid.ac.uk
cetest02.grid.hep.ph.ic.ac.uk
hepgrid5.ph.liv.ac.uk
hepgrid6.ph.liv.ac.uk
hepgrid97.ph.liv.ac.uk
svr009.gla.scotgrid.ac.uk
t2ce06.physics.ox.ac.uk

Tier 1
113914 (26/5)
Sno+ file copying ticket. Matt M is away on his hols, but Dave Auty has took over his duties and reports that this problem seems to have gone away - it can probably be closed. In progress (9/6)

Liverpool
114248 (10/6)
Another Sno+ ticket here from David concerning job failures. Nothing wrong with the ticket handling, but I thought that David's errors in submitting test jobs are worth documenting, as they were very understandable. David has since asked if the Sno+ job failures are linked to Sno+ nagios test failures at Liverpool. In progress (12/6)

Imperial
114157 (8/6)
After Simon and Daniela have cleared up the atlas dark data and expanded their Space Tokens using the space freed up there still seems to be some confusion in Rucio, disagreeing with the SRM numbers. In progress (10/6)

Oxford
114208 (9/6)
Oxford being ticketed for UKI-SOUTHGRID-OX-HEP_IPV6TEST failing connection tests, tests for which Oxford should not be getting ticketed afaacs. I remember this being mentioned in the Thursday cloud meeting, but I'm ashamed to say I wasn't paying attention. Were any conclusions drawn/decisions made? In progress (10/6)

Manchester
114153 (7/6)
Atlas transfer failures from Manchester. Errors are still occurring as of yesterday, any news? In progress (14/6)

Tools - MyEGI Nagios

Tuesday 09 June 2015

  • ARC CEs were failing nagios test becuase of non-availability of egi repository. Nagios test compare CA version from EGI repo. It started on 5th June and one of the IP addresses behind webserver was not responding. Problem went away in approximately 3 hours. The same problem started again on 6th June. Finally it was fixed on 8th June. No reason was given in any of the ticket opened regarding this outage.

Tuesday 17th February

  • Another period where message brokers were temporarily unavailable seen yesterday. Any news on the last follow-up?

Tuesday 27th January

  • Unscheduled outage of the EGI message broker (GRNET) caused a short-lived disruption to GridPP site monitoring (jobs failed) last Thursday 22nd January. Suspect BDII caching meant no immediate failover to stomp://mq.cro-ngi.hr:6163/ from stomp://mq.afroditi.hellasgrid.gr:6163/


VOs - GridPP VOMS VO IDs Approved VO table

Tuesday 19th May

  • There is a current priority for enabling/supporting our joining communities.

Tuesday 5th May

  • We have a number of VOs to be removed. Dedicated follow-up meeting proposed.

Tuesday 28th April

  • For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk and voms03.gridpp.ac.uk have both been updated from 15003 to 15503.

Tuesday 31st March

  • LIGO are in need of additional support for debugging some tests.
  • LSST now enabled on 3 sites. No 'own' CVMFS yet.
Site Updates

Tuesday 24th February

  • Next review of status today.

Tuesday 27th January

  • Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
  • Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.

Tuesday 2nd December

  • Multicore status. Queues available (63%)
    • YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
    • NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
  • According to our table for cloud/VMs (26%)
    • YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
    • NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
  • GridPP DIRAC jobs successful (58%)
    • YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
    • NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
  • IPv6 status
    • Allocation - 42%
    • YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
    • NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
  • Dual stack nodes - 21%
    • YES: Brunel; IC; QMUL; Oxford (4)
    • NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)


Tuesday 21st October

  • High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).

Tuesday 9th September

  • Intel announced the new generation of Xeon based on Haswell.



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Wednesday 10th June 2015 Operations report

  • Ongoing investigation into Castor performance issues for CMS.
  • The second tranche of 2014 Worker Node purchases has been put into production.
  • There is a short outage announced for next Wednesday (17th June) to test the recent change in the network routing and confirm the problem with the Tier1 network router can still be reproduced.
WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A