Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
Line 363: Line 363:
 
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105989 (4/6)<br />
 
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105989 (4/6)<br />
 
Technically I think this is a Glasgow ticket - I was going to give this a home but there but noticed that the ticket looked solved (it concerned enabling the cern@school cvmfs at Glasgow - which the Glasgow lads had done alongside the other gridpp repos). In progress (can be solved) (6/6)
 
Technically I think this is a Glasgow ticket - I was going to give this a home but there but noticed that the ticket looked solved (it concerned enabling the cern@school cvmfs at Glasgow - which the Glasgow lads had done alongside the other gridpp repos). In progress (can be solved) (6/6)
 +
 +
''STOP PRESS''<br />
 +
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106057 (9/6)<br />
 +
A ticket from Adam concerning the creation of a new UK Cloud site (UKI-LT2-IC-HEP-Cloud). I'm not sure who this needs to be bounced to (NGI-OPS, Imperial?), it could be that it's all in hand. Assigned (9/6)
  
 
'''SUSSEX'''<br />
 
'''SUSSEX'''<br />

Revision as of 09:59, 10 June 2014

Bulletin archive


Week commencing 9th June 2014
Task Areas
General updates

Monday 9th June

  • Note that the EMI-2 deadline set by EGI has now passed (31st May) and all remaining EMI-2 services/endpoints must be put into downtime.
  • The UK CA moved to issuing SHA-2 certificates on 28th May.
  • Reminder that the WLCG workshop registration should have been completed by now (and the accompanying GridPP travel request).
  • There is a GDB at CERN this week with pre-GDB on IPv6. The first few overview talks (setting up and comparing IPv4 and IPv6) are good background and it is recommended to review them. You can test your connectivity via ipv6-test.com.
  • The agenda from the HEPSYSMAN meeting at RAL last week is available here.
  • The GridPP DIRAC service can be accessed via this link.
  • ATLAS datasets on LocalGroupDisk more than 2 years old are being deleted starting from June 1st 2014.
  • EGI is now informing sites on a biweekly basis of VOs seeking additional resources. A process has been created for sites to register their resources into a ‘pool’ via the eGrant system. More information is available.
  • The May WLCG availability/reliability figures have been released. A reminder, if you want to request a re-computation you need to submit a GGUS ticket. Specific follow-ups have been requested in an email to TB-SUPPORT on 2nd June.

Monday 27th May

  • There is a DIRAC workshop at CERN this week. If you, or VOs you work with, have any thoughts on specific requirements for future DIRAC development please let Janusz/Dan or Jeremy know.
  • An EGI Operations Management Board takes place on Tuesday morning. The topics: CSIRT update; resource allocations; gfal2 replacing lcg_utils; central SAM update; EMI-2 decommissioning and update on GPGPUs.
  • The latest ops portal update integrated the possibility to register and update VO ID cards according to a new discipline classification. VO managers are being encouraged to check/update their VO ID card via this link.
  • There was a GridPP technical meeting last Friday.
  • The final WLCG Tier-2 reliability & availability reports for Arpil are now uploaded.
  • There has been some TB-Support discussion on GitHub vs BitBucket. Any conclusions?
  • A reminder that David C has put together a blog on monitoring.


WLCG Operations Coordination - Agendas

Tuesday 10th June

  • There was a WLCG ops coordination meeting on Thursday 5th June.
  • Middleware: CVMFS updated; FTS3 added; fix for DPM 1.8.8
  • CERN: Grid submissions to the remaining SLC5 resources stop on the 19th of June. LFC decommissioning for Atlas: the daemons have been stopped, and the data is frozen.
  • DM: Update to DPM's gridftp server released, to fix issues encountered with FTS2 transfers.
  • All sites need to upgrade their CVMFS client to version 2.1.19 by August 5th ahead of CERN repository migration to 2.1.X.
  • ALICE: KIT seeing high network load due to continued use of old ROOT versions by users
  • ATLAS: MonteCarlo production and analysis: stable load in the past week
  • CMS: will now ramp up scale of Tier-0 tests on AI and HLT clouds. ARGUS problem - affects glexec. DPM fix for FTS2 issue.
  • LHCb: CVMFS switching over to new stratum infrastructure.
  • Tracking: Next GGUS release 19th July - The automatic creation of tickets through mail will be stopped.
  • FTS3: Discussion on new feature request: multi-destination transfer with automated rerouting.
  • glexec: Down to 10 open tickets. See the tracking page.
  • Machine/job features: SGE implementation now at Imperial.
  • M/w readiness: See the task overview.
  • Multicore: Nothing to report (NTR).
  • SHA-2: CERN VOMS - EMI fix now available. Quick check with RFC proxies failed for ATLAS.
  • WMS: NTR
  • IPv6: NTR
  • HTTP proxy discovery: NTR
  • Network and transfer metrics: Planning to organize a kick-off meeting in July - membership being agreed (so get involved now).

Monday 27th May

    • A reminder of the need to register for the WLCG workshop.
  • Andrea Manzi takes over the maintenance of the baseline versions as WLCG Middleware Officer.
  • T0: Quattor phase-out - CERN is currently migrating all centrally managed services from Quattor to a new Puppet based Configuration Management system.
  • DPM 1.8.8 was released last week including a new gridftp component, which has issues with the gridftp implementation in FTS2 (currently still used only by CMS); FTS3 transfers are OK. Since CMS is anyway pushing to switch to FTS3, the affected sites which have already upgraded are asked to change their PhEDEx configuration to use FTS3. Sites which have not yet upgraded are encouraged to wait for the DPM fix which is in testing and is probably going to be released next week.
  • ALICE: Returns to high production activities.
  • ATLAS: Rucio full chain testing starting now. All but US sites moved. LFC at CERN no longer used.
  • CMS: SAM test for glexec critical on May 19th. Test for xrootd fallback goes critical soon.
  • LHCb: Mostly MonteCarlo production and user analysis during the last 2 weeks.
  • Tracking Tools: GGUS release on the 26th. The alarms for UK and USA will be done on the 27th. The rest, on the 26th
  • FTS3: CMS opening GGUS tickets to sites to complete migration to FTS3 in PhEDEx Debug.
  • glexec: 12 tickets still open (-3 on last meeting). Related - there have been many tickets for ARGUS instabilities recently, but the experts are actively following up, hopefully a solution will be found soon.
  • Middleware readiness: an internally developed solution is going to be used to track middleware versions instead of pakiti, since this would need to be extended anyway.
  • SHA2: ATLAS discovered that Condor still uses an old CREAM client that does not support RFC proxies which blocks the introduction of the new CERN VOMS servers.
  • WMS decom: hard deadline is 31st of October since the SAM WMS machines are Quattor-managed
  • IPv6: Please complete the site survey.
  • N&T (network and transport) metrics: New group with kick-off soon. Propose two sub-groups:
    • Deployment, commissioning and maintenance of the tools providing network and transfer metrics (FAX, AAA, FTS, perfSONAR, etc.) - versions and configuration tracking (parameter tuning), operational issues, etc.
    • Higher-level services that will make use of the provided metrics (PhEDEx, Panda, Rucio) - technical aspects of existing metrics (latency, measurement methodology, API access, etc.), identification of missing metrics, data analytics on archived data.


Tier-1 - Status Page

Tuesday 10th June

  • Castor and batch services currently down for Castor Namserver Upgrade (to version 2.1.14). If all goes well plan to upgrade stagers on: CMS- Tue 17th June; LHCb - Thu 19th June; GEN - Tue 24th June; Atlas - Thu 26th June.
  • There was a short break in network connectivity (around 10 minutes) this morning while core site switches were upgraded.
  • We are looking at how to end the FTS2 service, now FTS3 is becoming widely used.
  • The software server used by the small VOs will be withdrawn from service.
Storage & Data Management - Agendas/Minutes

Tuesday 10th June

  • The DPM Collaboration agreement has been updated.

Wed 28 May 2014

  • FTS capabilities - with and without Web interface - interest in more tests
  • Impact of deprecation of lcg-utils - particularly for non-LHC VOs that use LFC. Conversely, started playing with GFAL2 (Sam).
  • Interest in DIRAC tutorial either at hepsysman or next GridPP.


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 10th June

  • APEL not up-to-date for: Brunel, Sheffield, QMUL, Durham and Sussex? EMI-2 service downtime related in some cases?

Tuesday 20th May

  • Sites with APEL 'delays': IC, Liverpool, Sheffield, Durham, ECDF and Glasgow.

Tuesday 13th May

  • Will review GridPP metrics soon. Trying to get table up-to-date first.
  • No HEPSPEC06 wiki updates showing SL6 results for UCL or RALPP.
  • ATLAS HS06 coefficient for Lancaster 13.9?
  • APEL publishing 'stopped' for Liverpool, ECDF and Glasgow.


Documentation - KeyDocs

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Tuesday 6th April

  • KeyDocs are going to be reviewed (in next 4 weeks) as the system is not working (or not adding anything) in some areas.

Tuesday 15th April

Tuesday 1st April

  • Keydocs action needed by Jens J; Rob H/Security T; Alessandra F; Wahid B; David C and Matt D.
  • We need to reassign Mark M's documents on Core Grid Services


Tuesday 18th March

  • Keydocs action needed by: Mark M; Jens J; Rob H/Security T; Alessandra F; Wahid B; David C and Matt D.
Interoperation - EGI ops agendas

Tuesday 10th June

  • Next meeting June 16th.


Monitoring - Links MyWLCG

Tuesday 10th June

On-duty - Dashboard ROD rota

Monday 9th June

  • No issues to report.

Tuesday 20th May

  • Quiet week. Created tickets to cover two low availability alarms just now. No

UK-wide problems.

  • EMI-3 upgrades still ongoing. EGI following up on status.


Rollout Status WLCG Baseline

Tuesday 18th March

Tuesday 11th February

  • 31st May has been set as the deadline for EMI-2 decommissioning. There may be an issue for dCache (related to 3rd party/enstore component).

References


Security - Incident Procedure Policies Rota

Tuesday 10th June

  • Comments from the workshop last week

Monday 26th May

  • NGI security communications were tested today.



Services - PerfSonar dashboard | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

  • There will be an outage of the GridPP VOMS server on 11/06/2014 between 10am and 12am BST. The issuing of VOMS proxies will not be affected, but changes to VOs with the VOMS admin web interface "might get lost" during that time.


Tickets

Monday 9th June 2014, 15.00 BST
26 Open Tickets this week.

NGI
https://ggus.eu/index.php?mode=ticket_info&ticket_id=101502 (24/2)
The ILC ticket. Things got a bit muddled but ILC would like to know the state of Durham's CE. My impression is that they're submitting to a now defunct one - could you please let us know what's up? In progress (9/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=105989 (4/6)
Technically I think this is a Glasgow ticket - I was going to give this a home but there but noticed that the ticket looked solved (it concerned enabling the cern@school cvmfs at Glasgow - which the Glasgow lads had done alongside the other gridpp repos). In progress (can be solved) (6/6)

STOP PRESS
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106057 (9/6)
A ticket from Adam concerning the creation of a new UK Cloud site (UKI-LT2-IC-HEP-Cloud). I'm not sure who this needs to be bounced to (NGI-OPS, Imperial?), it could be that it's all in hand. Assigned (9/6)

SUSSEX
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105937 (2/6)
Sussex got a low availability nagios ticket - Matt RB replied that the trouble is with the EMI3 upgrade and hopes to have dug his way out of that pit shortly. In progress (9/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=102810 (28/3)
Sussex's EMI3 upgrade ticket. The deadline is pass, and anything not upgraded is in downtime. How goes things? In progress (2/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=105618 (21/5)
Sno+ were/are having cvmfs problems at Sussex. Related to 105989 above, has /cvmfs/snoplus.snolab.ca been replaced by /cvmfs/snoplus.gridpp.ac.uk? (The latter of which I can see at my site). In progress (29/5).

BIRMINGHAM
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106020 (6/6)
Some little lost cern@school jobs at Birmingham, sitting in an odd state. Matt W is having a look, suspecting argus. In progress (6/6)

GLASGOW
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106011 (5/6)
Atlas deletion errors at Glasgow. Sam and the lads suspect a dodgey disk pool, and are working on it. In progress (6/6)

EDINBURGH
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105996 (5/6)
Duncan spotted that the ECDF perfsonar box had fallen over. Andy and Wahid are prodding it with their remote stick. In progress (9/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=105839 (28/5)
Glue Validator failures at ECDF. Andy's reckoning that the CE's are misconfigured, and is digging into the guts of the matter. In progress (3/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=95303 (1/7/2013)
My shame, the tarball glexec tickets. Sorry to say nothing to see here again. On hold (27/1)

SHEFFIELD
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105617 (21/5)
A Sno+ cvmfs ticket, similar to the Sussex one (105618). Not much news on it. In progress (21/5)

MANCHESTER
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105922 (2/6)
Manchester are still publishing using the EMI2 apel. The work is scheduled to be done next (this) week. In the mean time has publishing been turned off? On hold (2/6)

LANCASTER
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105939 (2/6)
Biomed ticketed Lancaster over gridftp not being open on our dpm headnode. After advice from Sam we decided that opening up the firewall ports would be okay, but also told biomed that restricting gfal to just one protocol was a bit silly. Waiting to hear if all's well for them. Waiting for reply (9/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=100566 (27/1/2013)
Poor perfsonar bandwidth performance at Lancaster. Following Duncan's advice a downtime has been declared to try a reinstall of the node on Wednesday. In progress (9/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=95299 (1/7/2013)
glexec tarball ticket. On hold (4/4)

UCL
https://ggus.eu/index.php?mode=ticket_info&ticket_id=101285 (16/2)
UCL's perfsonar hit a spot of hardware trouble. Disks and RAID controller have been replaced, last word was that the OS was hoped to be reinstalled at the end of April. I suspect then the EMI3 upgrade storm hit. Any news since? On hold (28/4)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=95298 (1/7/2013)
UCL's glexec ticket. At last word waiting on a new staff member to take the reins. On hold (16/4)

EFDA-JET
https://ggus.eu/index.php?mode=ticket_info&ticket_id=97485 (21/9/13)
LHCB problems at JET. The last updated was from me in May, saying that'd I'd ask for help on JET's behalf (which I did...but failed to push on it. Sorry Jet). On Hold (12/5)

TIER 1
https://ggus.eu/index.php?mode=ticket_info&ticket_id=98249 (21/10/2013)
Sno+ CVMFS ticket. After looking like it was almost done this ticket has become a bit more murky in recent weeks, with talk of desire for an OSG "mirror" which Catalin points out breaks the cvmfs model. I think some more planning in Sno+ and discussion with the experts is needed. Waiting for reply (2/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=105405 (14/5)
A Vidyo router firewall ticket. Not really sure it's that interesting to any outside the Tier 1 - although there are a lot of Vidyo documentation links that might be useful. Not much news on the ticket for a while. In progress (27/5)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=105571 (20/5)
Mismatch between bdii and srm storage numbers - which has happened before (101310). In progress but no news. In progress (3/6)

https://ggus.eu/index.php?mode=ticket_info&ticket_id=105100 (2/5)
CMS are doing a round of their Storage Consistency Checks. There's been some back and forth between CMS and RAL with clean up being done. Not entirely sure what's the next step for this ticket - it doesn't seem to be a problem yet though. In progress (6/6)


Tools - MyEGI Nagios

Tuesday 20th May

Between May 1st and May 12th, SAM-CENTRAL and the Message Broker Network have experienced a set of chained failures that resulted in the loss of a large portion of the metric results that were published by the SAM NGI Instances. The loss of these messages will result in an unusually high number of UNKNOWNS in the May A/R reports, but the actual A/R numbers will not be affected as UNKNOWNS are not take into account. No other services have been affected.

Tuesday 13th May

  • From last week's discussion DiRAC now supports: NA62, vo.landslides.mossaic.org, t2k.org, snoplus, gridpp, CERN@school and northgrid. NA62 are moving from LFC to DFC and plan to use DiRAC in place of the WMS.


VOs - GridPP VOMS VO IDs Approved VO table

Tuesday 15th April

  • Is there interest in an FTS3 web front end? (more details)

Monday 17 February 2014

  • Proxy renewal
    • All RAL WMSs now renew proxies with 1024 bits. This looks like the end of this (at last).


Tuesday 11 February 2014

  • Proxy renewal
    • lcgwms06 at RAL has been upgraded and works
    • Both Imperial's WMSs work
    • Glasgow's will still need to be upgraded (unless they have been since Friday).
Site Updates

Tuesday 20th May

  • Various sites but notably Oxford have ARGUS problems. 100s of requests seen per minute. Performance issues have been noted after initial installation at RAL, QMUL and others.


Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Wednesday 28th May 2014

  • Operations report
  • Castor Nameserver 2.1.14 update on 10th June announced in GOC DB. Stager dates to follow ( CMS- Tue 17th June; LHCb - Thu 19th June; GEN - Tue 24th June; Atlas - Thu 26th June.)
  • The rollout of CVMFS Client version 2.1.19 has been completed.
  • The UK EScience CA has switched to issuing SHA2 signed certificates this morning.
WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Empty

UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A