Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(2,391 intermediate revisions by 37 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 5th October 2015
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
'''Tuesday 6th October'''
 
* GOCDB has received a new service type request for ‘uk.ac.gridpp.vcycle’.
 
* John H noted a "CVMFS problem at RAL". Apparently this was due to a misconfiguration at CERN.
 
* With HPC DIRAC work RAL discovered a bug in how the re-use connection flag is used with the fts commands.
 
* Here is a summary for the [http://wlcg-sam.cern.ch/reports/2015/201509/wlcg/ September reports]:
 
** [http://wlcg-sam.cern.ch/reports/2015/201509/wlcg/WLCG_All_Sites_ALICE_Sep2015.pdf ALICE]: All okay.
 
** [http://wlcg-sam.cern.ch/reports/2015/201509/wlcg/WLCG_All_Sites_ATLAS_Sep2015.pdf ATLAS]: Lancaster: 38%:42% & Liverpool: 81%: 100%.
 
** [http://wlcg-sam.cern.ch/reports/2015/201509/wlcg/WLCG_All_Sites_CMS_Sep2015.pdf CMS]: All okay.
 
** [ http://wlcg-sam.cern.ch/reports/2015/201509/wlcg/WLCG_All_Sites_LHCB_Sep2015.pdf LHCb]: QMUL: 47%:47% ;  Lancaster: 75%: 80% & ECDF: 89%
 
* The UCL storage servers are no longer used by ATLAS.
 
* The November GDB has been moved to 4th November.
 
  
 +
'''Tuesday 11th June'''
 +
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Tuesday 29th September'''
 
* Nagios was (and therefore the regional dashboard has) affected by a weekend A/C outage at Oxford.
 
* Steve J reports on: Condor libglobus_common problems
 
* There was an EGI OMB on 24th September. [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2380 Agenda].
 
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGDailyMeetingsWeek150928#Monday Notes from the Monday biweekly WLCG ops meeting] are available for anyone who is interested in the latest ops news.
 
* On the topic 'Perfsonar Bandwidth checks not running' Duncan reported a move to a [https://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=Latency%20tests%20between%20all%20WLCG%20hosts full WLCG mesh].
 
* Tom would appreciate feedback on the [https://vm36.tier2.hep.manchester.ac.uk/  GridPP website v2].
 
* Steve Lloyd has setup a [http://pprc.qmul.ac.uk/~lloyd/gridpp/metrics2.html new metrics page] as a basis for allocating T2 hardware funding. This just uses total Disk and total Elapsed and/or CPU time. In the PMB yesterday it was agreed that Elapsed time would be used, but the results of various combinations will be watched and assessed over the coming months. One overriding reason for using Elapsed time is that CPU is not provided by all cloud implementations.
 
  
  
Line 59: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 66: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 6th October'''
+
'''Tuesday 11th June'''
* There was a WLCG ops coordination meeting last week. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes151001 Minutes]. [https://indico.cern.ch/event/393617/ Agenda] (which has John Gordon's accounting slides).
+
 
* The highlights:
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
** dCache sites should install the latest fix for SRM solving a vulnerability
+
 
** All sites hosting a regional or local site xrootd should updgrade it at least to version 4.1.1
+
'''Tuesday 14th May'''
** CMS DPM sites should consider upgrading dpm-xrootd to version 3.5.5 now (from epel-testing) or after mid October (from epel-stable) to fix a problem affecting AAA
+
* Next meeting this Thursday.
** Tier-1 sites should do their best to avoid scheduling OUTAGE downtimes at the same time as other Tier-1's supporting common LHC VOs. A calendar will be linked in the minutes of the 3 o'clock operations meeting to easily find out if there are already downtimes at a given date
+
 
** The multicore accounting for WLCG is now correct for the 99.5% of the CPU time, with the few remaining issues being addressed. Corrected historical accounting data is expected to be available from the production portal by the end of the month
+
'''Tuesday 9th April'''
** All LHCb sites will soon be asked to deploy the "machine features" functionality
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
  
'''Tuesday 22nd September'''
 
* There was an ops coordination meeting last Thursday: [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes150917 Minutes].
 
* Highlights:
 
**  All 4 experiments have now an agreed workflow with the T0 for tickets that should be handled by the experiment supporters and were accidentally assigned to the T0 service managers.
 
**  A new FTS3 bug fixing release 3.3.1 is now available.
 
**  A globus lib issue is causing problems with FTS3 for sites running IPv6.
 
** The rogue Glasgow configuration management tool replacing the current configuration for VOMS with the old one was picked up and unfortunately discussed as though sites had not got the message about using the new VOMS.
 
**  No network problems experienced with the transatlantic link despite 3 out of 4 cables being unavailable.
 
**  T0 experts are investigating the slow WN performance reported by LHCb and others.
 
**  A group of experts at CERN and CMS investigate ARGUS authentication problems affecting CMS VOBOXes.
 
**  T1 & T2 sites please observe the actions requested by ATLAS and CMS (also on the WLCG Operations portal).
 
* Actions for [https://wlcg-ops.web.cern.ch/sys-admins/tasks Sites]; [https://wlcg-ops.web.cern.ch/experiments/tasks Experiments].
 
  
'''Tuesday 15th September'''
 
* The [https://indico.cern.ch/event/393616/ next WLCG ops coordination meeting is this Thursday 17th September]. Are there any Tier-2 issues we wish to raise? Minutes will appear [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes150917 here].
 
  
  
Line 108: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 6th October'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-09-30 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* The problems with the production FTS service have been resolved. A workaround to the memory leak introduced with the new version has been supplied. This, along with a reduction in the numbers of transfers queued, has enabled the service to return to normal operation.
+
<!-- *********************************************************** ----->
* The next step in the upgrade of the Castor Oracle databases to version 11.2.0.4 is taking place '''today'''. At the time of the meeting Castor is down. This is the upgrade of the "Pluto" database which hosts the Nameserver as well as the CMS & LHCb stager databases. The previous step took place successfully last Tuesday.
+
* The upgrading of the Tier1's link into the RAL core network to 40Gb took place successfully on the morning of Wednesday 30th September.
+
* There is an 'At Risk' on the Tier1 tomorrow morning for a UPS/generator load test that will take place from 10:00 to 11:00.
+
* There was a problem with glexec for the worker nodes over the weekend caused by a configuration error. This affected our CMS availabilities badly. The problem was fixed yesterday (Monday).
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 130: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20150902-minutes.txt Wednesday 02 Sep]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Catch up with [http://www3.imperial.ac.uk/highenergyphysics/research/experiments/mice MICE]
+
* DOME upgrade problems at Edinburgh
* How to do transfers of '''lots''' of files with FTS3 without the proxy timing out (in particularly if you need it vomsified)
+
* Data management support/development for IRIS users
  
'''[http://storage.esc.rl.ac.uk/weekly/20150812-minutes.txt Wednesday 12 Aug]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* sort of housekeeping: data cleanups, catalogue synchronisation - in particular namespace dumps for VOs
+
* Rucio reporting
* GridPP storage/data at future events; GridPP35 and Hepix and Cloud data events
+
  
'''[http://storage.esc.rl.ac.uk/weekly/20150708-minutes.txt Wednesday 08 July]'''
+
'''Wed 16 Oct'''
* Huge backlog of ATLAS data from Glasgow waiting to go to RAL, and oddly varying performance numbers - investigating
+
* CEPH workshop at CERN report
* How physics data is like your Windows 95 games
+
  
'''[http://storage.esc.rl.ac.uk/weekly/20150701-minutes.txt Wednesday 01 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
* Feedback on CMS's proposal for listing contents of storage
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
* Simple storage on expensive raided disks vs complicated storage on el cheapo or archive drives?
+
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20150624-minutes.txt Wednesday 24 June]'''
 
* Heard about the Indigo datacloud project, a H2020 project in which STFC is participating
 
* Data transfers, theory and practice
 
** Somewhat clunky tools to set up but perform well when they run
 
** Will continue to work on recommendations/overview document
 
** Worth having recommendations/experiences for different audiences - (potential) users, decision makers, techies
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 167: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 
+
'''Tuesday 30 Apr 2019'''
'''Tuesday 6 Oct'''
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
* UCL Vac site now running two payloads per dual processor VM. Total VMs now 240.
+
 
+
'''Tuesday 29 Sep'''
+
* UCL Vac site updated with most recent version of Vac-in-a-Box. Now running ~216 jobs: LHCb MC and ATLAS certification jobs.
+
* Drawing up list of tasks needed to be able to run a site for GridPP-supported VOs purely using VMs (e.g. VM certification by experiments etc.)
+
* Discussion at GridPP Technical Meeting on storage options, including xrootd-based sites (i.e. xrootd not DPM/dCache)
+
 
+
'''Tuesday 22 Sep'''
+
* Fortnightly [https://indico.cern.ch/category/4454/ GridPP Technical Meetings] on Fridays will have Tier-2 Evolution discussions, starting on Fri 25 Sept.
+
 
+
'''Thursday 17 Sep'''
+
* Task force to start developing advice for sites to simplify their operation in line with "6.2.5 Evolution of Tier-2 sites" in the GridPP5 proposal.
+
* Mailing list for Tier-2 evolution activities: gridpp-t2evo@cern.ch - anyone welcome to join
+
* Also [https://its.cern.ch/jira/browse/GRIDPP/ GridPP project] on the CERN JIRA service for tracking actions. Can be used with a full or lightweight CERN account. You need to be added manually or on the gridpp-ops@cern.ch mailing list to browse issues.
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 199: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 22nd September'''
+
'''Tuesday 6th February'''
* Slight delay for Sheffield but overall okay - although there is a gap between today's date and the most recent update for all sites. Perhaps an APEL delay.
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Monday 20th July'''
 
* Oxford publishing 0 cores from Cream today. Maybe they forgot to switch one off. [http://goc-accounting.grid-support.ac.uk/apel/jobs2_withsubmithost.html Check here].
 
  
'''Tuesday 14th July'''
+
'''Tuesday 30th January'''
* QMUL and Sheffield appear to be lagging with publishing by a week.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
* Please check your multicore publishing status (especially those sites mentioned in June).
+
  
* A reminder to keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC06 tables].
+
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 220: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 228: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 29nd September'''
+
''' Tue 9th July 2019'''
Steve J: problems with voms server at fnal, voms.fnal.gov, have been detected; I will resolve them soon and may issue an update to Approved VOs, alerting sites with TB_SUPPORT should that occur. Approved VOs potentially affected are CDF, DZERO, LSST. Please do not act act yet.
+
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
  
'''Tuesday 22nd September'''
+
'''Tuesday 5th Feb 2019'''
* Steve J is going to undertake some GridPP/documentation usability testing.  
+
For enmr, certificate of voms-02.pd.infn.it
  
'''Tuesday 18th August'''
+
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
* Lydia's document - Setup a system to do data archiving using FTS3
+
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
  
'''Tuesday 28th July'''
+
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
* Ewan: /cvmfs/gridpp-vo help ... there's a lot of historical stuff on the GridPP wiki that makes it look a lot more complicated than it is now. We really should have a bit of a clear out at some point.
+
  
'''Tuesday 23rd June'''
 
* Reminder that documents need reviewing!
 
  
  
 
'''General note'''
 
'''General note'''
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
  
 
|}
 
|}
Line 254: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 261: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Monday 13th July'''
+
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
  
* There was an EGI Ops meeting today: [https://wiki.egi.eu/wiki/Agenda-13-07-2015 agenda]
+
''' Monday 11th March '''
* URT/UMD updates:
+
** UMD 3.13.0 released on 01.07.2015: http://repository.egi.eu/2015/07/01/release-umd-3-13-0/
+
*** APEL 1.4.1
+
*** Argus PAP v. 1.6.2
+
*** gLExec-wn - v. 1.2.3 (lcmaps and mkdir)
+
*** storm 1.11.8
+
*** fetch-crl 3.0.16
+
*** cream 1.16.5
+
*** dpm-xroot 3.5.2
+
*** Xroot 4.1.1.
+
*** Frontier Squid 2.7.24
+
*** CVMFS 2.1.20
+
*** GFAL2 2.8.4
+
*** GFAL2-PYTHON 1.7.1
+
** UMD 3.13.1 released on 13.07.2015: http://repository.egi.eu/2015/07/13/release-candidate-umd-3-13-1-rc1/ (link was not updated correctly during release)
+
*** ARC Nagios probes 1.8.3
+
  
* SR updates (small because it's summer):
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11
*** gfal2 2.9.1
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
*** storm 1.11.9
+
* DPM Legacy mode is going to end in June 2019
*** srm-ifce 1.23.1....
+
* EGI will open tickets after June
*** gfal2-python 1.8.1
+
* HTCondor CE accounting status?
** In Verification
+
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
*** gfal2-plugin-xrootd 0.3.4
+
  
* Accounting
 
** [John Gordon] "Of the WLCG sites we now have 97%+ of cpu reported with cores. I expect you all saw my recent email to GDB naming 16 sites. If one German and one Spanish site and the four Russians start publishing we will jump to 99%+"
 
** New list of sites needing to update multicore accounting being prepared this evening (Monday) by Vincenzo
 
  
* SL5 decommissioning date March 2016;
+
''' Tuesday 12th February '''
* Next meeting 10th August
+
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
'''Monday 15th June'''
 
* There was an EGI operations meeting today: [https://wiki.egi.eu/wiki/Agenda-15-06-2015 agenda].
 
* New Action: for the NGIs: please start tracking which sites are still using SL5 services: how many services, and for each service if still needed on SL5, if upgrades on SL5 services are expected). [https://wiki.egi.eu/wiki/SL5_retirement A wiki has been provided to record updates]. Also interesting to understand who is using Debian.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 314: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 +
 
'''Tuesday 16th June'''
 
'''Tuesday 16th June'''
 
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
Line 320: Line 386:
  
  
''' Tuesday 31st March
 
 
* Glasgow Graphite/Grafana documentation: http://www.scotgrid.ac.uk/graphite/
 
 
'''Monday 7th December
 
 
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 341: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 5th February'''
 +
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''Tuesday 6th October'''
+
'''Tuesday 14th August'''
* With the exception of the dashboard getting really confused early in the week as the Nagios instances at Oxford and Lancaster came and went, it's been a fairly quiet week.  There are four outstanding tickets:
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
** Three for availability / reliabaility (Sussex, Liverpool and Lancaster).
+
** One at Bristol for a GridFTP transfer problem.
+
  
'''Tuesday 15th September'''
 
* Generally quiet. QMUL have some grumblyness with the CEs. However, I understand much of this is caused by the batch farm being busy. There are low-availability tickets 'on hold' for Liverpool and UCL.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 361: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 15th September'''
+
'''Monday 20th November'''
* [http://repository.egi.eu/2015/09/10/release-umd-3-13-3/ UMD 3.13.3 is available].
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 12th May'''
 
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
 
  
'''Tuesday 17th March'''
 
* Daniela has updated the [ https://www.gridpp.ac.uk/wiki/Staged_rollout_emi3 EMI-3 testing table]. Please check it is correct for your site. We want a clear view of where we are contributing.
 
* There is a middleware readiness meeting this Wednesday. Would be good if a few site representatives joined.
 
* Machine job features solution testing. Fed back that we will only commence tests if more documentation made available. This stops the HTC solution until after CHEP. Is there interest in testing other batch systems? Raul mentioned SLURM. There is also SGE and Torque.
 
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 388: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Monday 5th October'''
+
'''Tuesday 11th June
* Updated IGTF distribution version 1.68 available - https://dist.igtf.net/distribution/igtf/current/
+
* Update on incident broadcast EGI-20150925-01 relating to compromised systems in China. - The EGI, WLCG and VO security teams are continuing their investigations. Affected sites and users have been contacted and there is no present indication of further action needed by any site in the UK. However, as more information comes to light, additional updates may be made in the near future and sites are asked as always to read any updates carefully, taking actions as recommended.
+
  
'''Tuesday 29th September'''
+
* NTR
* Incident broadcast EGI-20150925-01 relating to compromised systems in China.
+
* UK security team meeting scheduled for 30th Sept.
+
 
+
'''Monday 29th September'''
+
* IGTF has released a regular update to the trust anchor repository (1.68) - for distribution ON OR AFTER October 5th
+
 
+
 
+
The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 418: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 426: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 6th October'''
+
'''Monday 5th March'''
* A reminder, the next [https://indico.cern.ch/event/401680/ LHCOPN and LHCONE joint meeting]: Science Park Amsterdam (NL) 28-29 of October 2015
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
  
'''Tuesday 14th July'''
+
'''Monday 10th September'''
* GridPP35 in September will have a part focus on networking and IPv6. This will include a review of where sites are with their deployment. Please try to firm up dates for your IPv6 availability between now and September. Please update the [https://gridpp.ac.uk/wiki/IPv6_site_status GridPP IPv6 status table].  
+
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
  
Line 445: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 5th October 2015, 14.15 BST'''
 
 
22 Open UK Tickets this month, all of them, Site by Site:
 
 
'''SUSSEX'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116136 116136] (9/9)<br />
 
Sussex got a snoplus ticket for a high number of job failures, although simple test jobs ran okay. Matt asks if the problem persists, the reply was a resounding "not sure". In progress (think about closing) (21/9)
 
 
'''RALPP'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116652 116652](1/10)<br />
 
A ticket from CMS, about some important Phedex ritual that must occur on the 3rd of November, when the stars are right. The ticket needs some confirmation and feedback, plus the nomination of one site acolyte to receive the DBParam secrets from CMS - but the ticket only got assigned to sites this morning. Assigned (5/10)
 
 
'''BRISTOL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116651 116651](1/10)<br />
 
Same as the RALPP ticket, Winnie has volunteered Dr Kreczko for the task. In progress (5/10)
 
 
'''ECDF'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=95303 95303](Long, long ago)<br />
 
glexec ticket. On hold (18/5)
 
 
'''DURHAM'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116576 116576](1/10)<br />
 
Atlas ticket asking Durham to delete all files outside of the datadisk path. Oliver asks what this means for the other tokens (I think they can be sacrificed to feed datadisk, but Brian et al can confirm that). Waiting for reply (5/10)
 
 
'''SHEFFIELD'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116560 116560](30/9)<br />
 
Sno+ jobs having trouble at Sheffield. Looks like a proxy going stale problem as only 10 Sno+ jobs at a time can run at Sheffield. Matt M asks if/how the WMS can be notified to stop sending jobs in such a case. In progress (30/9)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=114460 114460](18/6)<br />
 
Gridpp Pilot roles. No news on this for a while, after the last attempt seemed to not quite work. In progress (30/7)
 
 
'''MANCHESTER'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116585 116585](1/10)<br />
 
Biomed ticketed Manchester with problems from their VO nagios box - which Alessandra points out being due to there being no spare cycles for biomed to run on. Assigned (can be put on hold or closed?) (1/10)
 
 
'''LIVERPOOL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116082 116082](7/9)<br />
 
A classic Rod Availability ticket. On Hold (7/9)
 
 
'''LANCASTER''' (a little embarrassing that my own site has the most tickets)<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116478 116478] (28/9)<br />
 
Another availability ticket, this time for Lancaster (which has been through the wars in September). Still trying to dig our way out, but even the Admin's broke. On hold (5/10)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=116676 116676] (5/10)<br />
 
Another ROD ticket, Lancaster's not quite out of the woods. We think WMS access is somewhat broken. We have no idea about the sha2 error. In progress (5/10)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116366 116366] (22/9)<br />
 
Sno+ spotted malloc errors at Lancaster. The problems seemed to survive one batch of fixes, but I asked again if they still see problems after running a good number of jobs over the weekend. Waiting for reply (5/10)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=95299 95299] (In a galaxy far, far way)<br />
 
glexec ticket. This was supposed to be done last week, after I had figured out [https://www.gridpp.ac.uk/wiki/RelocatableGlexec "the formula"] - but then last week happened. On hold (5/10)
 
 
'''QMUL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=115959 115959] (31/8)<br />
 
LHCB job errors at QM, with a 70% pilot failure rate on ce05. Dan couldn't see where things are breaking (only that the CE wasn't publishing to APEL- and asks if this is the cause of the problem?) Waiting for reply (5/10)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116662 116662] (5/10)<br />
 
LHCB job failures on ce05 - almost certainly a duplicate of [https://ggus.eu/?mode=ticket_info&ticket_id=115959 115959], but it might have some useful information in it. Assigned (probably can be closed as a duplicate) (5/10)
 
 
'''IMPERIAL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116650 116650] (1/10)<br />
 
Imperial's invitation to the CMS Phedex DBParam ritual. Daniela's on it, as well as the other CMS sites. On hold (5/10)
 
 
'''BRUNEL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116649 116649] (1/10)<br />
 
Brunel's ticket for the great DBParam alignment of 2015. On hold (5/10)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116455 116455] (28/9)<br />
 
A CMS request to change the xrootd monitoring configs. Did you get round to doing this last week Raul? In progress (29/9)
 
 
'''EFDA-JET'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=115448 115448] (3/8)<br />
 
Biomed having trouble tagging the jet CE. The Jet admins think this is the same underlying issues as their other ticket
 
[https://ggus.eu/?mode=ticket_info&ticket_id=115496 115496]. In progress (25/9)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=115496 115496] (5/8)<br />
 
Biomed unable to remove files from the jet SE. There are clues that suggest that some dns oddness is the cause, but it's not clear. In progress (18/9)
 
 
'''100IT'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116358 116358] (22/9)<br />
 
Ticket complaining about a missing image at the site. Some to and fro, the ball is back in the site's court. In progress (2/10)
 
 
'''TIER 1'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116618 116618] (1/10)<br />
 
The Tier 1's CMS DBParam ritual ticket. In progress (5/10)
 
 
Let me know if I missed ought.
 
 
[https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?host=all&servicestatustypes=16&hoststatustypes=15 '''T'OTHER VO NAGIOS''']<br />
 
At time of writing things looka a bit rough at QM, Liverpool (just getting over their downtime) and for Sno+ at Sheffield (likely related to their ticket).
 
  
 +
32 Open Tickets this week, which is an in depth a look as I've been able to take.
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 550: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 29 Sep 2015'''
+
'''Monday 20th November'''
 
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
Following an air-conditioning problem at machine room in Oxford Tier-2 site on 26 September, gridppnagios(OX) was shut down and gridppnagios(Lancs) became active instance. Oxford site is in downtime until 1st Oct and it may be extended depending on the situation.  
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
VO-Nagios was also unavailable for two days but we have started it yesterday as it is running on a VM. VO-nagios is using oxford SE for replication test so it is failing those tests. I am looking to change to some other SE.     
+
 
+
'''Tuesday 09 June 2015'''
+
*ARC CEs were failing nagios test becuase of non-availability of egi repository. Nagios test compare CA version from EGI repo. It started on 5th June and one of the IP addresses behind webserver was not responding. Problem went away in approximately  3 hours. The same problem started again on 6th June. Finally it was fixed on 8th June. No reason was given in any of the ticket opened regarding this outage.
+
  
'''Tuesday 17th February'''
+
'''Tuesday 18th July'''
* Another period where message brokers were temporarily unavailable seen yesterday. Any news on the last follow-up?
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
'''Tuesday 27th January'''
 
* Unscheduled outage of the EGI message broker (GRNET) caused a short-lived disruption to GridPP site monitoring (jobs failed) last Thursday 22nd January. Suspect BDII caching meant no immediate failover to stomp://mq.cro-ngi.hr:6163/ from stomp://mq.afroditi.hellasgrid.gr:6163/
 
 
* [http://southgrid.blogspot.co.uk/2014/10/nagios-monitoring-for-non-lhc-vos.html Blog about VO Nagios]
 
* [https://vo-nagios.physics.ox.ac.uk/nagios/ Oxford VO Nagios] currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk.
 
  
  
Line 575: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 581: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 19th May'''
 
* There is a current priority for enabling/supporting our joining communities.
 
  
'''Tuesday 5th May'''
+
'''Monday 20th November'''
* We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 28th April'''
 
* For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503.
 
 
'''Tuesday 31st March'''
 
* LIGO are in need of additional support for debugging some tests.
 
* LSST now enabled on 3 sites. No 'own' CVMFS yet.
 
  
 
* Impact
 
* Impact
Line 610: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 24th February'''
+
'''Date'''
* Next review of status today.
+
 
+
'''Tuesday 27th January'''
+
* Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
+
* Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.
+
 
+
'''Tuesday 2nd December'''
+
* [https://www.gridpp.ac.uk/wiki/Batch_system_status Multicore status]. Queues available (63%)
+
** YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
+
** NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
+
 
+
* According to our [https://www.gridpp.ac.uk/wiki/Batch_system_status table] for cloud/VMs (26%)
+
** YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
+
** NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
+
 
+
* [http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg GridPP DIRAC jobs] successful  (58%)
+
** YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
+
** NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
+
 
+
* [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 status]
+
** Allocation - 42%
+
** YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
+
** NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
+
 
+
* Dual stack nodes - 21%
+
** YES: Brunel; IC; QMUL; Oxford (4)
+
** NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)
+
 
+
 
+
 
+
'''Tuesday 21st October'''
+
* High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).
+
  
'''Tuesday 9th September'''
 
* Intel announced the new generation of Xeon based on Haswell.
 
  
  

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A