Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(2,972 intermediate revisions by 41 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 9th February 2015
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
'''Tuesday 10th February'''
 
* Is there support to start using the bulletin sections (bottom of this page) for experiment input. It helps review issues and progress if the information is in one place.
 
* Pete has reminded us of HEPIX in [ https://indico.cern.ch/event/346931/ Oxford 23th-27th March 2015].
 
* WLCG draft T2 reliability/availability figures have been circulated for January 2015 - please respond if your site was below the 90% targets! [http://sam-reports.web.cern.ch/sam-reports/2015/201501/wlcg/WLCG_All_Sites_ALICE_Jan2015.pdf ALICE]; [http://sam-reports.web.cern.ch/sam-reports/2015/201501/wlcg/WLCG_All_Sites_ATLAS_Jan2015.pdf ATLAS]; [http://sam-reports.web.cern.ch/sam-reports/2015/201501/wlcg/WLCG_All_Sites_CMS_Jan2015.pdf CMS]; [http://sam-reports.web.cern.ch/sam-reports/2015/201501/wlcg/WLCG_All_Sites_LHCb_Jan2015.pdf LHCb].
 
* There is an [https://indico.cern.ch/event/342059/ LHCONE/LHCOPN meeting in Cambridge 9th & 10th February] with good Geant participation. Some interesting links from yesterday's talks: The [https://netstat.cern.ch/monitoring/network-statistics/ext/?p=LHCOPN CERN netstat displays] - could we do something for GridPP to show traffic levels month to month? [https://indico.cern.ch/event/342059/contribution/16/material/slides/1.pdf Brocade have initiated a CERN tier partner program]. If you are in REBUS you can benefit. A lot of discussion in the afternoon was around the [https://twiki.cern.ch/twiki/bin/view/LHCONE/LhcOneAup LHCONE AUP]!
 
* A [http://indico.cern.ch/event/319818/ cloud traceability workshop/meeting is taking place today] - Vidyo is available. GridPP is well represented.
 
* Tomorrow the February GDB has the linked [https://indico.cern.ch/event/319744/ agenda]. David Crooks is the Tier-2 rep. Anything to raise?
 
* Lots of core-ops discussion about CERN accounts last week. This is being followed up. Note there is an [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGExternalAccounts eGroup for CERN external accounts] - were people aware?
 
  
 +
'''Tuesday 11th June'''
  
'''Tuesday 3rd February'''
+
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
* HEP S/W foundation workshop - [http://indico.cern.ch/event/357737/other-view?view=standard agenda link]. [https://docs.google.com/document/d/1R6CnNTx4aEQAKxAVYGt1FZYeru0wOpQtcynJKC4iiIw/edit?pli=1 Notes from meeting].
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
* There was an [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2372 EGI OMB on Thursday 29th January]. A snapshot of areas/updates discussed:
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
* Operations: RC/RP OLA: User SLA Biovel, DRIHM, CompChem.
 
** QoS: (response) GGUS report monitor: https://ggus.eu/?mode=report_view
 
** ROD: evolution. Some small. Propose stop monitoring ROD.
 
** MC accounting: At 33% sites not reporting.
 
** New global VOs: eli-np.eu (lasers); vo.compass.cern.ch (SPS); fermilab.fnal.gov (Fermi wide)
 
** Cloud Accounting campaign: FedCloud sites to upgrade probe (OpenStack & OpenNebula)
 
** Documentation: Upcoming new procedures/Manuals ([https://wiki.egi.eu/wiki/PROC19 PROC19 - adding resources]; [https://wiki.egi.eu/wiki/PROC20 PROC20 - CVMFS replication].
 
** [https://wiki.egi.eu/wiki/Instructions_for_Operations_Tools_teams Guide for ops tool developers].
 
** EGI 2015 conference: [http://conf2015.egi.eu/  Open for registration]. April is the early bird deadline. Co-located: OGF44 & Globus meeting.
 
** Next OMB meeting: 26th February
 
 
* [https://indico.egi.eu/indico/materialDisplay.py?contribId=2&materialId=slides&confId=2372 Security]
 
** Current: CVE-2014-9322 (linux kernel) ongoing.  Pakiti issues. Some sites suspended.
 
** CVE-2015-0235 (glibc) – under consideration.
 
* [https://indico.egi.eu/indico/materialDisplay.py?contribId=6&materialId=slides&confId=2372 GOCDB]:
 
** [https://gocdb-test.esc.rl.ac.uk/ v5.3.1 out for testing].
 
** Login via x509 or EGI SSO; get_user PI update.
 
* [https://indico.egi.eu/indico/materialDisplay.py?contribId=3&materialId=slides&confId=2372 Fedcloud F2F]:
 
** EGI-Engage (standards & capabilities) & INDIGO Datacloud (services) will be funded.
 
** Use cases: 26 communities with 50 use cases. 43 NatSci; 3 Medical; 3 Humanities.
 
** Many sites experimenting with Big Data services also for IaaS provisioning
 
** Cloud accounting working but improved.
 
** Cloud security: response; policies; assessment (to happen)
 
** VM Management: Using OCCI 1.1. Support OS; ON and Sinnefo.
 
** Data Management: CDMI uses Synnefo. Lack of support.
 
** Cloud Blueprint docs: Cover GOCDB, monitoring & accounting.
 
** AAI – AARC and EGI-Engage will push this forward.
 
** Monitoring: for FedCloud interfaces/services done or in dev.
 
 
* [https://indico.egi.eu/indico/materialDisplay.py?contribId=7&materialId=slides&confId=2372 Earth science e-infrastructures workshop]
 
** Outreach included ES communities (VERCE, CLIPC, EIDA, EPOS…) + EGI.eu+Geant+EUDAT+PRACE.
 
** Sessions: AAI; Data management; Cloud. Use cases.
 
** Virtual Earthquake & Seismology Research Community in Europe (VERCE) – iRODS
 
** Climate4Impact: Data from Earth System Grid Federation (ESGF) 6PB. Data transfer bottlenecks.
 
** ... + many others...
 
 
* EGI participation to PRACE data storage pilot call - brief discussion. Survey for responses.
 
 
* [https://indico.egi.eu/indico/materialDisplay.py?contribId=4&materialId=slides&confId=2372 Evolution of UMD repositories]
 
** Will form managed UMD-preview. Preserve EMI repos characteristics.
 
** Web pages http://repository.egi.eu/
 
 
* [https://indico.egi.eu/indico/materialDisplay.py?contribId=5&materialId=slides&confId=2372 UMD 3.11 update]
 
** FTS 3
 
** UMD u11: CREAM 1.16.4 (no VOMS client dependencies); BLAH 1.20.7; Torque 2.1.4; VOMS-admin 2.0.12; voms-clients 3.0.6; DPM 1.8.9; DMLite 0.7.2.; CERN DM clients (e.g. gfal2…).
 
 
* As of yesterday AFS UI at CERN closed. The top directory of the AFS UI installation is /afs/cern.ch/project/gd/LCG-share
 
  
  
Line 99: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 106: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
--
+
'''Tuesday 11th June'''
* News: An updated version of the agenda for the Okinawa workshop will be soon produced.
+
 
* MW Baselines: frontier/squid 2.7.STABLE9-22.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
* MW Issues: Ghost vulnerability. ARGUS failures with latest Java (disable SSLv3 by default) – workaround in place.
+
 
* MW Services: Various upgrades mentioned for T0 and T1s.
+
'''Tuesday 14th May'''
* T0 news: Latest VOMS-admin in test. If no issues VOMRS off from 16th Feb. AFS UI closed 2nd Feb.
+
* Next meeting this Thursday.
* T1: NTR
+
 
* T2: Asked about CERN accounts for T2 sysadmins. Should be possible!
+
'''Tuesday 9th April'''
* ALICE:
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
* ATLAS:
+
 
* CMS: Bigger run 2 MC started.  Doing staging/consistency checks. >50% T1 capacity MC –partional slot model so slots will be used either way.
+
 
* LHCb: Run-1 legacy stripping almost done. Problems due to SARA disk failure. Some issues CERN simulation jobs. APEL issues 2 sites. VOMS tests.
+
'''Tuesday 26th March'''
* Glexec: With panda - 55 sites covered. T1 and biggest T2s. Issue resolved at BNL. Further ramping ATLAS.
+
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
* SHA-2: old VOMS retirement – will keep special firewall/router configs until VOMRS gone. VOMS config reminder broadcast soon.
+
* Next meeting booked for 4th April
* MJF: Site testing – documentation question.
+
 
* MW readiness:  Some steady progress.  
+
'''Monday 11th February 2019'''
* IPv6: TBC
+
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
* Squid mon + HTTP proxy dis TF: Progress. Not all yet registered so will broadcast again. Generate ATLAS/CMS pages for monitoring. Contributors busy. Additional CVMFS repos now available. Some sites put restriction.
+
** End of CREAM support Dec 2020.
Net+Transfer metrics:
+
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
 +
 
  
  
'''Tuesday 3rd February'''
 
* Next meeting this Thursday 5th Febraury.
 
** Tier-2 feedback so far: Has there been any progress on CERN accounts or material access?
 
  
 
<!-- **********************End ops coord text************************** ----->
 
<!-- **********************End ops coord text************************** ----->
Line 146: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 10th February'''
+
 
* Patching of Oracle databases behind Castor scheduled for Feb 11th.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* Some racks in the datacentre have to be moved to make way for latest procurement. This will affect one generation of production diskservers. Details are still being finalised.
+
<!-- *********************************************************** ----->
* The problems with our primary network router are still being followed up.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 165: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 10th February'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* [https://surfdrive.surf.nl/files/public.php?service=files&t=7d3c60da1dc44291a5644019ced1c289 SURFsara have produced a Service Incident Report] (SIR) following their dCache problems. This might be of interest.
+
* DOME upgrade problems at Edinburgh
 +
* Data management support/development for IRIS users
  
[http://storage.esc.rl.ac.uk/weekly/20150128-minutes.txt Wedn 28 Jan]
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Ready for run 2!
+
* Rucio reporting
* Towards the exascale with GridPP?
+
* Should we spring clean our defunct VOs?
+
  
[http://storage.esc.rl.ac.uk/weekly/20150121-minutes.txt Wedn 21 Jan]
+
'''Wed 16 Oct'''
* Wahid's report on "protocol zoo" - can the set of protocols be simplified (and how long would it take)
+
* CEPH workshop at CERN report
* Update from RAL's CEPH team.
+
  
[http://storage.esc.rl.ac.uk/weekly/20150107-minutes.txt Wedn 07 Jan]
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
* HNY. Most sites ticked over with relatively few glitches.
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
* Next week's pre-GDB on preservation and protocols: harmonising for LHC VOs(?) but we also need to support non-LHC VOs
+
* Roadmap for xroot and http TPC for RAL FTS(es)
* Apparently no major outstanding issues to sort out prior to run 2.
+
  
[http://storage.esc.rl.ac.uk/weekly/20141217-minutes.txt Wedn 17 Dec]
+
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
* Update from T1 CEPH team.
+
* Storage support for IRIS VOs?
* Last meeting of year. No updating and configuring or touching! Merry and Happy!
+
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 192: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 202: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 3rd February'''
+
'''Tuesday 6th February'''
* A reminder to keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC06 tables].
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
*
+
  
'''Tuesday 20th January'''
 
* Some APEL delays seen for ECDF and Sheffield.
 
  
'''Tuesday 13th January'''
+
'''Tuesday 30th January'''
* Some glitches over holiday period when RAL network lost, but site publishing now looks fine across all sites.  
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
 +
 
 +
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 221: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 229: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
  
* Survey of KeyDocs
+
'''Tuesday 5th Feb 2019'''
* https://www.gridpp.ac.uk/wiki/Current_Activities
+
For enmr, certificate of voms-02.pd.infn.it
  
'''Tuesday 3 Feb '''
+
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
  
New VO, LSST, in Approved VOs: https://www.gridpp.ac.uk/w/index.php?title=GridPP_approved_VOs
+
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
  
'''Tuesday 27th January'''
 
* Reviewed briefly at the core ops meeting last week. Doc owners are to be requested to review the usefulness of their keydocs and report any they believe should be removed from keydoc status.
 
  
'''Monday 8th December'''
+
'''General note'''
* Chris Walker is handing over several 'other VO' documents. Some aspects of the role are being taken on by a combination of Duncan and Daniela... but the documents need reviewing in a core-ops meeting (next Thursday @ 11am being likely).
+
  
'''Tuesday 4th Nov'''
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
* New section in Wiki called "Project Management Pages".
+
The idea is to cluster all Self-Edited Site Tracking Tables
+
in here. Sites should keep entries in [[Current Activities]]
+
up to date. Once a Self-Edited Site Tracking Tables has
+
served its purpose, PM to move it to  [[Historical Archive]]
+
or otherwise dispose of the table.
+
  
 
|}
 
|}
Line 259: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 265: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 9th February'''
 
  
* The agenda for February's EGI ops meeting is [https://wiki.egi.eu/wiki/Agenda-09-02-2015 here].
+
''' 14 May 2019 '''
** Argus PAP update (1.6.2) out imminently. This should fix the SSL problems for sites affected after a java update. Hopefully this will solve Raul's problems in his ticket [https://ggus.eu/index.php?mode=ticket_info&ticket_id=111505 111505].
+
* Meeting for May cancelled. Next meeting is on 10th June.
** Other update notifications include APEL 1.4.0 (with a bunch of new features), Storm 1.11.6, UNICORE v7.2.0 and a new version of Globus in EPEL testing. UMD release 3.11.0 being prepared.
+
** Multicore republishing was discussed - if sites need to republish multicore data previously parsed as single core then they need to reparse the logs. Any site wanting to republish is asked to submit a ticket to apel support first.
+
** Operational issues were discussed whereby sites saw problems running ARGUS and CREAM on the same node, special care is taken if you want to take this mad path. See tickets [https://ggus.eu/index.php?mode=ticket_info&ticket_id=111464 111464] and [https://ggus.eu/index.php?mode=ticket_info&ticket_id=111373 111373].
+
** The decommissioning of the EMI2 APEL service and the UMD repositories was mentioned.
+
** Sites are advised to avoid using MySQL v.5.0 where possible.
+
** A comment was passed that the EPEL5 repository was becoming harder to keep up to date, bringing the effective EOL of SL5 closer for the community
+
*** SL7 is a topic that still needs to be discussed in earnest in this forum.
+
** Next meeting is March 9th - effort to keep the number of meetings down.
+
  
 +
''' Monday 11th March '''
 +
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 +
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 +
 +
''' Friday 1st February '''
 +
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 +
* No UK specific issue mentioned.
 +
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 +
'
  
'''Monday 12th January'''
 
* There was an EGI ops meeting on [https://wiki.egi.eu/wiki/Agenda-12-01-2015 Monday 12th January]. Minutes to follow.
 
** STORM 1.11.5
 
** SR: Another reminder to check your contacts
 
** Call for sites to test FTS3 and SQUID (Glasgow is testing the new squid)
 
** Multicore accounting: As per broadcast, sites have been asked to publish number of cores used by jobs but updating apel config where appropriate: instructions given to test publishing in accounting-devel.
 
** EGI forum in May: slightly delayed because they were waiting for approval to start fine-grained definition of programme. They will circulate the programme soon (end of the month).
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 301: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 +
 +
'''Tuesday 16th June'''
 +
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.
 +
  
'''Monday 7th December
 
  
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 319: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 27th January'''
+
'''Tuesday 5th February'''
* Rota to be updated this week based on previous input.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''Tuesday 20th January'''
+
'''Tuesday 14th August'''
* Last week was quiet.  
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* Kashif + Gordon (shadowing) next week.
+
* The ROD work is to be included in the GridPP5 D/O/S activity.
+
  
'''Monday 13th January'''
 
* A couple of tickets for systems with low availability.
 
* There are a couple of tests for QMUL that keep being flagged up although the service is in a "not production but monitored" state.
 
* Tier-1 aware of long standing ticket.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 343: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 20th January'''
+
'''Monday 20th November'''
* From [https://indico.cern.ch/event/319743/contribution/9/material/slides/3.pdf Cristina's GDB talk] last week note that EMI repositories will be frozen and the product team releases will become UMD-preview (repository content and webpages similar but now managed).
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 11th November'''
 
* [http://repository.egi.eu/2014/11/10/release-umd-3-9-0/ UMD v.3.9.0] was released Monday 10th November. It supports Scientific Linux 5 and 6 and also Debian 6 (Squeeze).
 
* As proposed during October OMB production EGI resource centres will be notified later in the month with a summary broadcast together with other communications, to reduce the number of broadcasts sent to sites.
 
  
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 367: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 27th January'''
+
'''Tuesday 11th June
* Keep watching paikiti - WNs are popping up (seemingly) unpatched at some sites!
+
  
 
+
* NTR
'''Tuesday 20th January'''
+
* DPM configuration instructions.
+
* Status of [https://wiki.egi.eu/wiki/EGI_CSIRT:Alerts/Linux-2014-12-17 CVE-2014-9322].
+
* Steve's old perf package false positive.
+
 
+
'''Tuesday 13th January'''
+
* EGI CSIRT alert 'High' Risk - CVE-2014-9295 - Remote code execution in NTP.
+
* Any issues over holiday period?
+
 
+
'''Tuesday 16th December'''
+
* Any update on the FTS3/GFAL bug?
+
 
+
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 401: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 409: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 3rd February'''
+
'''Monday 5th March'''
* There was a [https://indico.cern.ch/event/369420/ network and transfer metrics WG meeting last week]. Any feedback?
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
'''Tuesday 20th January'''
 
* The next [https://indico.cern.ch/event/342059/ LHCOPN/LHCONE meeting is in Cambridge 9-10 February]. 
 
* Perfsonar is expected to be available at sites - where are we with the reinstall?
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 428: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 9th February 2015, 15.00 GMT'''
 
 
[https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?host=all&servicestatustypes=16&hoststatustypes=15 Other VO Nagios Results]<br />
 
At the time of writing the only site showing red that aren't suffering an understood problem was RALPP with org.nordugrid.ARC-CE-submit and SRM-submit test failures for gridpp, pheno, t2k and southgrid for both its CEs and its SE. The failures are between 1 and 12 hours old, so it doesn't seem to be a persistent failure, but it seems to be quite consistent. They all seem to be failing with "Job submission failed... arcsub exited with code 256: ...ERROR: Failed to connect to XXXX(IPv4):443 .... Job submission failed, no more possible targets". Anyone seen something like this before?
 
 
Only 20 Open UK tickets this week.
 
 
'''Biomed tickets:'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=111356 111356] (Manchester)<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=111357 111357] (Imperial)<br />
 
Biomed have linked both these tickets as children of 110636, being worked on by the cream blah team. AFAIKS no sign of Cream 1.16.5 just yet.
 
 
'''TIER 1'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=111347 111347] (22/1)<br />
 
CMS consistency checks for January 2015. It looks like everything that was asked of RAL has been done by RAL, so hopefully this can be successfully closed. In progress (3/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=111120 111120] (12/1)<br />
 
Another ticket, this time concerning a period of Atlas transfer failures between RAL and BNL, that looks like it can be closed as the failures seem to have stopped (and might well have been at the BNL end). Waiting for reply (22/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=108944 108944] (1/10/14)<br />
 
CMS AAA test failures at RAL. Federica can't connect to the new xrootd service according to the error messages. No news for a while. In progress (29/1)
 
 
'''100IT'''
 
[https://ggus.eu/?mode=ticket_info&ticket_id=108356 108356]<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=111333 111333]<br />
 
Both of these 100IT tickets are looking a bit crusty - the first is waiting for advice, the second was just put "In progress".
 
 
'''QMUL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=110353 110353] (25/11/14)
 
Dan has set up se02.esc.qmul.ac.uk to test out the latest https-accessible version of storm for dteam and atlas. As a cherry on top this node is also IPv6 enabled. I'm not sure if Dan wants others in the UK to "give it a go"? In progress (6/2)
 
 
'''LANCASTER'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=100566 100566] (27/1/14)<br />
 
(Blatantly scounging for advice) Trying to figure out why Lancaster's perfsonar is under-performing. Ewan kindly gave us access to a iperf endpoint and it's been very useful in characterising some of the weirdness - although I'm still confused. Ewan also gave us a bunch of suggestions for testing that have been useful - next stop, window sizes. If anyone else wants to throw advice to me all wisdom donations are thankfully accepted. My advice for others in be careful trying to connect to the default iperf port on a working DPM pool node.... In Progress (9/2)
 
  
 +
32 Open Tickets this week, which is an in depth a look as I've been able to take.
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 477: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 27th January'''
+
'''Monday 20th November'''
* Unscheduled outage of the EGI message broker (GRNET) caused a short-lived disruption to GridPP site monitoring (jobs failed) last Thursday 22nd January. Suspect BDII caching meant no immediate failover to stomp://mq.cro-ngi.hr:6163/ from stomp://mq.afroditi.hellasgrid.gr:6163/
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
  
''' Tuesday 25th November'''
+
'''Tuesday 18th July'''
 
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
Backup SAM Nagios at Lancaster was upgraded to update-23 as part of stage rollout process. It is major upgrade as some tests were removed from CE and probes are moved to UMD3 repository from SAM repository.
+
 
+
Tests added:
+
 
+
    ch.cern.FTS3-Service
+
    ch.cern.FTS3-StalledTransfers
+
    org.bdii.GLUE2-Validate
+
 
+
Tests removed:
+
 
+
    org.nordugrid.ARC-CE-LFC-result
+
    org.nordugrid.ARC-CE-lfc
+
    org.nordugrid.ARC-CE-LFC-submit
+
    org.sam.WN-RepDel
+
    org.sam.WN-RepISenv
+
    org.sam.WN-RepFree
+
    org.sam.WN-RepCr
+
    org.sam.WN-RepGet
+
    org.sam.WN-RepRep
+
    org.sam.WN-Rep
+
 
+
release note is available here
+
https://wiki.egi.eu/wiki/SAMUpdate23
+
 
+
+
 
+
''' Tuesday 21st October'''
+
 
+
VOMS servers for OPS based at CERN were down on Saturday 18th October for around 12 hours. Nagios tests started failing after existing proxy expired. Availibilty figures will be slightly affected but outage will be considered as unknown.
+
 
+
Blog about VO Nagios
+
 
+
http://southgrid.blogspot.co.uk/2014/10/nagios-monitoring-for-non-lhc-vos.html
+
+
  
'''Tuesday 16th Sep'''
 
* Multi VO nagios maintained at Oxford has been upgraded to add ARC CE tests.
 
* https://vo-nagios.physics.ox.ac.uk/nagios/
 
* It is currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk
 
* Should we start monitoring it more actively and open ticket for sites failing tests ?
 
  
  
Line 531: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 538: Line 540:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 6th January 2015'''
+
'''Monday 20th November'''
* GEANT4 has now updated their VOMS records in the ops portal to suit the new servers, lcg-voms2.cern.ch voms2.cern.ch. The Approved VOs document has been updated to match:
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
* https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
+
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 
+
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
 
+
'''Tuesday 16th December 2014'''
+
* Discussion of setting up CVMFS for 'other VOs'.
+
* LondonGrid VO now established in CVMFS - decision on top level needed together with who has write access.
+
  
  
Line 564: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 27th January'''
+
'''Date'''
* Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
+
* Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.
+
 
+
'''Tuesday 2nd December'''
+
* [https://www.gridpp.ac.uk/wiki/Batch_system_status Multicore status]. Queues available (63%)
+
** YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
+
** NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
+
 
+
* According to our [https://www.gridpp.ac.uk/wiki/Batch_system_status table] for cloud/VMs (26%)
+
** YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
+
** NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
+
 
+
* [http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg GridPP DIRAC jobs] successful  (58%)
+
** YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
+
** NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
+
 
+
* [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 status]
+
** Allocation - 42%
+
** YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
+
** NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
+
 
+
* Dual stack nodes - 21%
+
** YES: Brunel; IC; QMUL; Oxford (4)
+
** NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)
+
 
+
 
+
 
+
'''Tuesday 21st October'''
+
* High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).
+
  
'''Tuesday 9th September'''
 
* Intel announced the new generation of Xeon based on Haswell.
 
  
  
Line 657: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 28th January 2015'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-01-28 Operations report]
+
* Only ALICE left using CREAM CEs now and they should be finished with them by 16th February. Will decommission then.
+
* Electrical power circuit testing completed.
+
* The migration of all data off T10000A & B media has been completed.
+
* Ongoing discussions with vendor to investigate problems on Primary Tier1 router.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 729: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A