Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
 
()
 
(3,877 intermediate revisions by 44 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 10th March 2014
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
 +
 +
 +
'''Tuesday 11th June'''
 +
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 
<!-- ***********************Start General text*********************** ----->'''
 
<!-- ***********************Start General text*********************** ----->'''
'''Monday 10th March'''
+
'''Tuesday 4th June 2019'''
* EGI recently took part in a EC [https://ec.europa.eu/digital-agenda/en/news/open-access-h2020-services-and-support-projects workshop] on "Open Access in H2020: services and support for projects". EGI is starting a pilot distributed open data repository (interoperable with openAIRE) that may be of interest.
+
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
* A Vidyo test meeting room is still available for testing linked from [http://indico.cern.ch/event/305335/ this agenda]. Headsets are recommended.
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
* Cristina Aiftimiei has joined the EGI.eu Operations team. She will continue to be employed by INFN but working full time to support the EGI Operations.
+
* iris.ac.uk VO - Andrew explained this.
* The WLCG Tier-2 availability/reliability [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/ reports for February] are now available. Please check your site for: [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/WLCG_All_Sites_ALICE_Feb2014.pdf ALICE]; [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/WLCG_All_Sites_ATLAS_Feb2014.pdf ATLAS]; [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/WLCG_All_Sites_CMS_Feb2014.pdf CMS] and [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/WLCG_All_Sites_LHCB_Feb2014.pdf LHCb].(Reminder of Alessandra's suggestion to undertake a cloud view as in this [https://indico.cern.ch/event/299401/contribution/11/material/slides/0.pdf FR cloud report]).
+
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
* There was an outage of the GOCDB on 5th March for which an incident review has taken place. An initial database disk failure and no automated DNS switch from goc.egi.eu to goc.dl.ac.uk was complicated by a scheduled downtime for an OS update after which the primary DNS failed to resolve external addresses and a manual switch back to goc.egi.eu failed.
+
* Gareth's query about the WS interface to ARC on TB-SUPPORT
* EGI are moving their federated cloud sites to a production service ([https://wiki.egi.eu/wiki/Fedcloud-tf:ResourceProviders follow progress]).
+
* Anything else?
* This week there is a [http://indico.cern.ch/event/272785/ pre-GDB meeting on batch systems] and a [http://indico.cern.ch/event/272619/other-view?view=standard GDB].
+
 
  
  
'''Tuesday 4th March'''
 
* A Vidyo test meeting room is available for testing linked from [http://indico.cern.ch/event/305335/ this agenda]. Headsets are recommended.
 
* No problems uncovered with the GridPP test website.
 
* From Monday's WLCG ops: intermittent problems with RAL's virtualization cluster, affecting many services (including FTS3).
 
* GGUS update - is there feedback we want to collate?
 
* For information: [https://indico.egi.eu/indico/conferenceDisplay.py?ovw=True&confId=2052 APARSEN-EGI Community Workshop] on Managing, Computing and Preserving Big Data for Research will take place next week, 4-6 March.
 
* There will be a [https://www.gridpp.ac.uk/wiki/Batch_system_status pre-GDB on batch systems] next Tuesday, and a [https://indico.cern.ch/event/272619/timetable/#20140312.detailed GDB] covering various update areas.
 
* There was an [https://indico.egi.eu/indico/conferenceDisplay.py?confId=1859 EGI OMB meeting] last Thursday.
 
* Steve produced an [http://northgrid-tech.blogspot.co.uk/2014/02/central-argus-banning-at-liverpool.html overview] of getting ARGUS working at Liverpool.
 
* GOCDBv5.2 was [https://operations-portal.egi.eu/broadcast/archive/id/1096 released] last week. This release adds an extensibility mechanism which allows Services, ServiceGroups and Sites to be extended using custom key-value pairs (following the GLUE2 extensibility mechanism).
 
 
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 56: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 63: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Thursday 6th March'''
+
'''Tuesday 11th June'''
* There was a meeting today ([https://indico.cern.ch/event/280062/ agenda], [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes140306 minutes]).
+
 
* Simone Campana was nominated ATLAS Distributed Computing coordinator and will step down as chair of WLCG Operations Coordination.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
 +
 
 +
 
  
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineVersions Baselines]: WMS fix for 512-bit keys, already applied at CERN.
 
* CERN would like to propose a deadline to switch FTS 2 off on the 1st of August.
 
* Review of baselines - main update is that fix for the 512-bit keys on WMSes is being applied.
 
* dCache is going to extend the security support for 2.2 until Enstore and dCache 2.6 are properly integrated. This will happen by summer.
 
* Tests ongoing with Oracle12
 
* dCache: is going to extend the security support for 2.2 until Enstore and dCache 2.6 are properly integrated.
 
* ALICE: [https://indico.cern.ch/event/274974/ Tier-1/2 workshop in Japan].
 
* ATLAS: in the middle of a disk crisis, many of the Tier1s are almost full of primary data. JEDI is under testing now. JEM activated (Job Evolution Monitor) for all the production resources. Rucio migration (Rucio as file catalog instead of LFC) in progress.
 
* CMS: Soon starting 13 TeV MC DIGI/RECO. Looking at ccess to high memory resources and multi-core jobs.
 
* LHCb: 2014 spring incremental stripping in full swing, 1/4 of the data has been processed ([http://lhcbproject.web.cern.ch/lhcbproject/Reprocessing/stats-inc-stripping-spring14.html statistics]).
 
* FTS3 deployment: Discussed with experiment DM developers how to integrate multiple FTS3 servers with experiment frameworks.
 
* glexec deployment: 79 tickets closed and verified, 16 still open
 
* Machine job features: no update
 
* Middleware readiness: Next [http://indico.cern.ch/event/306380/ meeting] Tuesday 2014/03/18 @ 14:30h CET. [https://twiki.cern.ch/twiki/bin/view/LCG/MiddlewareReadiness See twiki].
 
* Multicore: Several meetings. Conclusions so far systems reviewed are capable of supporting multicore jobs however a tuning of each system is required to be able to absorb them (draining/reservation of resources) when running together with single core jobs.
 
* perfSONAR: perfSONAR 3.3.2 is now baseline. Deadline April 1, 2014 - all WLCG sites should have instances deployed, using the mesh - configuration and registered in OIM/GOCDB. Instructions in [https://indico.cern.ch/event/280062/contribution/1/6/material/slides/1.pdf slides].
 
*  SHA2: Many new users already registered OK with SHA-2 certificates. Host certs of CERN future VOMS servers are from the new SHA-2 CERN CA.
 
* Tracking tools: no update
 
* WMS decommissioning: no update
 
* xrootd deployment: no update
 
  
 
<!-- **********************End ops coord text************************** ----->
 
<!-- **********************End ops coord text************************** ----->
Line 103: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 11th March'''
+
 
* The problems with the Virtual Machine infrastructure are now stable. As requested, Atlas have temporarily moved their file transfers (for everything except UK transfers) off our FTS3 server.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* The software server used by the small VOs will be withdrawn from service (aiming for June).
+
<!-- *********************************************************** ----->
* A replacement MyProxy server has been put into production (to resolve the MyProxy issues raised in GGUS ticket [https://ggus.eu/ws/ticket_info.php?ticket=97025 97025]). This new service is called myproxy.gridpp.rl.ac.uk. Sites and VOs need to make appropriate reconfigurations to use this. We plan to turn the old one (lcgrbp01.gridpp.rl.ac.uk) off at the end of March.
+
* Atlas disk space at the RAL Tier1 is full. One factor in this is a slow deletion rate that is being investigated.
+
* We are currently rolling out EMI-3 WN to one batch of WMs.
+
* The Tier1 will move to use the new site firewall on Monday 17th March. We will drain and stop FTS (2 & 3) transfers while the change takes place (07:00-08:00) and stop new batch work from starting. Otherwise services will be up for the day but will be At Risk.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 124: Line 136:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 28th January'''
 
* Trying to liaise with DiRAC colleagues to setup a technical meeting.
 
  
'''Monday 9th December'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Spacetokens for non-LHC VOs - recommendations.
+
* DOME upgrade problems at Edinburgh
 +
* Data management support/development for IRIS users
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 136: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 146: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 11th Febraury'''
+
'''Tuesday 6th February'''
* Another review of the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC page] shows no SL6 (or equivalent) entry for: UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; RALPP and RAL Tier-1. So... basically no change since last week. Tickets needed?
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
* The [http://accounting.egi.eu/egi.php accounting pages] show the following sites as not up-to-date with publishing accounting data: Glasgow (minor); RALPP and Sussex.
+
* Under publishing... sites are encouraged to run the Glue2 validator. There were problems observed for RAL-LCG2; UKI-LT2-IC-HEP; UKI-NORTHGRID-MAN-HEP; UKI-NORTHGRID-SHEF-HEP; UKI-SCOTGRID-GLASGOW and UKI-SOUTHGRID-RALPP.
+
  
'''Tuesday 4th February'''
 
* A review of the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC page] shows no SL6 (or equivalent) entry for: UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; RALPP and RAL Tier-1.
 
* The [http://accounting.egi.eu/egi.php accounting pages] show the following sites as not up-to-date with publishing accounting data: Lancaster (minor); RALPP and Sussex.
 
  
+
'''Tuesday 30th January'''
* Check publishing via: http://gstat2.grid.sinica.edu.tw/gstat/summary/Country/UK/  
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
 +
 
 +
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
 +
 
 +
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
  
 
<!-- *****************Edit stop*********************** ----->
 
<!-- *****************Edit stop*********************** ----->
Line 165: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 173: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
  
'''Tuesday 25th February'''
 
* [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed Keydocs] owners need to take some action!
 
  
'''Tuesday 11th February'''
+
'''General note'''
* Documents still need attention....
+
  
'''Tuesday 28th January'''
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
* Document assignments were reviewed at a core ops tasks meeting last week... so the dashboard for keydocs should improve soon!
+
* It has been noted that blog activity has dropped to a very low level. The blogs have been very useful to disseminate details of what is happening at sites, to share technical solutions and to make GridPP's work more visible. It also helps avoid duplication... so please give some thought to reviving [http://planet.gridpp.ac.uk/ your blogs]!
+
  
 
|}
 
|}
Line 191: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 197: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 10th March'''
 
* An EGI operations meeting took place today ([https://wiki.egi.eu/wiki/Agenda-10-03-2014 agenda]).
 
  
* URT recent or future planned releases
+
''' 14 May 2019 '''
** GridSite 2.2.2 (bug fix ) and dCache 2.6.20 for UMD-3
+
* Meeting for May cancelled. Next meeting is on 10th June.
  
* SR updates
+
''' Monday 11th March '''
** WMS 3.6.3 (today) - EMI3 WN tarball SR flagged
+
  
* New Nagios probes
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
** emi-cream-nagios v. 1.1.1 - released with EMI 3 Update 14, released soon in SAM framework
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
** org.sam.WN-SoftVer - new probes check the $EMI_TARBALL_BASE/etc/emi-version file
+
* DPM Legacy mode is going to end in June 2019
**WN replication tests in emi-nagios are now distributed by the SAM-team, nagios-plugins-wn-rep
+
* EGI will open tickets after June
** --wn-se-rep option as well as all the other previous --wn-* options will not be supported anymore by technology provider (see [https://ggus.eu/index.php?mode=ticket_info&ticket_id=88835 #88835] and [https://ggus.eu/index.php?mode=ticket_info&ticket_id=91683 #91683] )
+
* HTCondor CE accounting status?
** NGIs requested to feedback how they feel about this option not being supported anymore.
+
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
  
* EMI-2 decommissioning
 
** dCache extended the support for the 2.2.x versions until July 2014.
 
** List of services failing given [https://drive.google.com/file/d/0B7LpvREXG9c-WnBGSFV4VGJUNFE/edit?usp=sharing Services]
 
** Alarms to begin on Wednesday, so please check this list for errors ASAP.
 
  
* Cloud probes start raising alarms
+
''' Tuesday 12th February '''
** 4 cloud sites have been certified in the last weeks, sites are currently monitored by cloudmon, but the errors are not raising alarms.
+
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 235: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 4th March'''
+
'''Tuesday 4th July'''
* Summary on HC functional tests
+
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
* Overview of feedback
+
  
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
  
'''Monday 24th February'''
+
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
  
* Next meeting this Friday, agenda looking at HammerCloud Functional tests
 
  
'''Tuesday 21 January'''
+
'''Tuesday 16th June'''
 
+
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
* Update from meeting on Friday (the 17th); the main item under discussion was the nagios probes (in particular, the Condorg and CREAM-CE).
+
* Feedback welcome.
 +
  
** One thing to pull out - new probes being written to remove use of WMS - ALICE/LHCb CREAM probes being rolled out Jan/Feb, ATLAS/CMS CondorG probes being rolled out after that
 
** https://indico.cern.ch/getFile.py/access?contribId=2&resId=0&materialId=slides&confId=287653
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 264: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 10th March'''
+
'''Tuesday 5th February'''
* Last week was "uneventful". Expect EMI-2 tickets this week.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''Monday 3rd March'''
+
'''Tuesday 14th August'''
* A [http://operations-portal.egi.eu/next/ new dashboard] is available for testing.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* The ROD rota has been extended to April
+
* Brunel sub-sites caused a problem leading to EMI-3 APEL alarms which is now fixed.
+
  
  
Line 284: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 11th February'''
+
'''Monday 20th November'''
* 31st May has been set as the deadline for EMI-2 decommissioning. There may be an issue for dCache (related to 3rd party/enstore component).
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''References'''
+
 
 +
 
 +
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 303: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
 +
'''Tuesday 11th June
  
 
+
* NTR
'''Tuesday 5th March'''
+
* Ready for more ARGUS testing
+
* SHA-2 looks ready for UK CA switch
+
* Looking at technologies
+
 
+
'''Monday 24th February'''
+
* Let Orlin know if you wish to try connections with the NGI ARGUS server. Tested working for EM including national banning. There is some [http://wiki.nikhef.nl/grid/Argus_Global_Banning_Setup_Overview#NGI_Argus setup documentation].
+
  
 
|}
 
|}
Line 329: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://perfsonar.racf.bnl.gov:8080/PsDisplay-1.0-SNAPSHOT/clouds.jsp?id=26 PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 335: Line 468:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 10th March'''
+
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
* A reminder that the perfSONAR documentation is [https://twiki.cern.ch/twiki/bin/view/LCG/PerfsonarDeployment available here].
+
 
* Deadline for 3.3.2 is 1st April.
+
'''Monday 5th March'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.  
  
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
  
'''Tuesday 4th March'''
+
'''Monday 19th February'''
* The full UK perfSONAR view is given on [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi?dashboard=UK%20sites this dashboard].
+
* When perfSONAR is performing in a stable fashion the site will appear on the main [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi monitoring page].
+
  
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
  
'''Monday 17th February'''
+
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
* Note that WLCG see perfSONAR as a production service (see page 5 [https://indico.cern.ch/event/289679/contribution/1/material/slides/1.pdf in Ian Bird's talk]). The [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi UK dashboard] shows work still to be done at: ECDF, RHUL, Sheffield, Brunel and RALPPD.
+
  
'''Tuesday 4th February'''
 
* There is an [http://psps.perfsonar.net/toolkit/releasenotes/pspt-3_3_2.html update to perfSONAR] (v3.3.2)
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 363: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 10th March, 13.00 GMT'''</br>
 
Only 28 Open UK tickets this week.
 
  
'''NGI'''</br>
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
https://ggus.eu/index.php?mode=ticket_info&ticket_id=101502 (24/2)</br>
+
ILC moving to cvmfs for their software area. As Jeremy mentioned after tomorrow we're going to start chasing sites that support ILC but haven't rolled out these changes. 4 sites have implemented the move and passed muster. A tip from me is to remember to update the software area entry in your CE's info system for ILC as well as on the nodes. In progress (10/3)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=101820 (5/3)</br>
+
This goc db ticket ended up assigned to the UK. I've punted it in the direction of the GOC DB support unit. Assigned (10/3)
+
 
+
'''EDINBURGH'''</br>
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=100569 (28/1)</br>
+
Wahid has got stuck trying to reinstall his perfsonar box, if I'm reading it right the reinstall from the netimage isn't "taking". Has anyone seen this before or have any tips? Waiting for reply (10/3)
+
 
+
'''GLASGOW'''</br>
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=101565 (26/2)</br>
+
LHCB wanting MaxCPUTime to be published. Sam has eloquently explained his point about why he doesn't want to set this, I fear that some kind of impasse has been reached, and I'm not sure where to go on this issue. In progress (4/3)
+
 
+
'''PERFSONAR'''</br>
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=101136 (RALPP)</br>
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=100037 (SHEFFIELD)</br>
+
Any news on upgrading the perfsonar instances at RALPP or SHEFFIELD? Reminder dates on these tickets have passed by a week now.
+
 
+
 
+
That's all my addled brain can process I'm afraid, can sites please check the link below (oh, and yippie for GGUS search bringing back ordering by site again):</br>
+
http://tinyurl.com/p37ey64
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 403: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th November'''
+
'''Monday 20th November'''
* Regional [https://gridppnagios.lancs.ac.uk/nagios Nagios] updated to release 22. It is a glite to UMD update and it required a fresh installation.
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
* There have been some internal changes in SAM-Nagios. Test probes are now the responsibility of product team. Some test names have been changed as a result of this reorganization. For example the org.sam.CREAMCE-DirectJobSubmit test has become  emi.cream.CREAMCE-DirectJobSubmit.  This does not affect the operational activities.  
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
* Please could all site admins look at services associated to their site and please mail Kashif if anything odd is noticed. Site admins can reschedule tests for their sites and it would be helpful if most functionalities are tested.
+
 
* Also, look at [https://gridppnagios.lancs.ac.uk/myegi/ myegi] which can be useful with links to the Dashboard, GSTAT, Accounting Portal and GGUS.
+
'''Tuesday 18th July'''
 +
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 416: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 422: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 17 February 2014'''
 
* Proxy renewal
 
** All RAL WMSs now renew proxies with 1024 bits. This looks like the end of this (at last).
 
  
 +
'''Monday 20th November'''
 +
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 11 February 2014'''
 
* Proxy renewal
 
** lcgwms06 at RAL has been upgraded and works
 
** Both Imperial's WMSs work
 
** Glasgow's will still need to be upgraded (unless they have been since Friday).
 
  
 
* Impact
 
* Impact
Line 449: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
[https://www.gridpp.ac.uk/wiki/Operations_Team_Action_items Actions]
+
'''Date'''
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 509: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 12th March'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2014-03-12 Operations report]
+
* All LHCb workflows now go through the ARC CEs OK.
+
* Network Changes: Move of Tier1 to use new site firewall will be on Monday 17th March. There will some interruption to services as seen from outside RAL. Internally services are expected to continue uninterrupted. Details in GOC DB.
+
* The Tier1 will be At Risk for an hour or so during the morning of Wedensday 19th March during a UPS/Generator load test.
+
* A new MyProxy server is in production (myproxy.gridpp.rl.ac.uk).
+
* Reminder: The software server usd by the small VOs will be withdrawn from service (aiming for June).
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 568: Line 677:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''4th February 2014'''
 
With reference to the [https://indico.egi.eu/indico/conferenceDisplay.py?confId=1858 OMB on 30th January].
 
 
- UMD-2 will be decommissioned in the coming months. 30th April end of security support. 31st May all services to have been removed or upgraded.
 
 
- UK sites failing Glue2:
 
 
RAL-LCG2
 
UKI-LT2-IC-HEP
 
UKI-NORTHGRID-MAN-HEP
 
UKI-NORTHGRID-SHEF-HEP
 
UKI-SCOTGRID-GLASGOW
 
UKI-SOUTHGRID-RALPP
 
 
Check with the glue2 validator to see errors.
 
 
- A new Operations Dashboard will be in pre-production during February and moved into production in March.
 
 
- Availability/reliability targets for EGI are moving to 80%/85%.
 
 
- Some new ARC SAM tests are being introduced: org.nordugrid.ARC-CE-LFC-result; org.nordugrid.ARC-CE-LFC-submit; org.nordugrid.ARC-CE-SRM-result;
 
org.nordugrid.ARC-CE-SRM-submit; org.nordugrid.ARC-CE-submit
 
 
- There is a summary page on how to publish from various middleware types: https://wiki.egi.eu/wiki/MAN09
 
 
- There was an overview of the French NGI adoption of iRODs.
 
 
- FedCloud to production: Management (GOCDB - ok); Monitoring (in progress); Accounting (in progress); Documentation (ok); Support (ok); Dashboard (in progress) and Security (in progress).
 
- The SAM tests are: org.nagios.CloudBDII-Check; eu.egi.cloud.OCCI-VM and org.nagios.OCCI-TCP. Security checks not yet available.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 611: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A