Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(1,862 intermediate revisions by 22 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 16th May 2016
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 17th May'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* There was a WLCG GDB last week: [http://indico.cern.ch/event/394782/ Agenda] | Minutes. Sessions included discussions on lightweight sites.
+
** https://indico.cern.ch/event/776832/
* Please could everyone update the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HS06 table] based on new purchases at sites.
+
* DIRAC downtime this week due to the move to Slough - good luck!
* Steve: lcg-ca etc. tests going wrong....
+
* EGI Ops meeting this week.
* LSST:UK pilot, write-up... Tom turning it into a use-case page.
+
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
* Matt M: condor submission tools (Has anyone installed condor submission tools (direct submission) on a machine with an EMI-UI already installed?).
+
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
  
'''Monday 9th May'''
+
'''Tuesday 11th June'''
* [https://indico.cern.ch/event/525673/contributions/2153059/attachments/1267146/1876700/20160503-HC-blacklisting.jschovan.v2.pdf Upgrades and improvements are being rolled out to the ATLAS Hammer Cloud tests].
+
 
* Te latest [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGDailyMeetingsWeek160509#Monday WLCG ops meeting was yesterday] - worth reading for a general picture of operations. Most issues reported over the last week concerned CERN.
+
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
* There was a GridPP Oversight Committee meeting last week. A positive review.  
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
* Dan: wms logs from failed ops tests -> GlueCEStateStatus: UNDEFINED turned out to be that the queues (or partitions in slurm speak) were set with MaxTime=inifinte (this is the wall clock time).
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
* Andrew: HTCondor Machine/Job Features testing? = Request for volunteers please!
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
* There is a [http://indico.cern.ch/event/394782/ GDB tomorrow]. One topic of wider interest will be the work on lightweight sites.
+
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
  
'''Tuesday 3rd May'''
 
* The WLCG T2 reliability/availability figures have arrived.
 
** [http://wlcg-sam.cern.ch/reports/2016/201604/wlcg/WLCG_All_Sites_ALICE_Apr2016.pdf ALICE]: All okay.
 
** [http://wlcg-sam.cern.ch/reports/2016/201604/wlcg/WLCG_All_Sites_ATLAS_Apr2016.pdf ATLAS]:
 
*** ECDF: 87%:87%
 
*** BHAM: 78%:78%
 
** [http://wlcg-sam.cern.ch/reports/2016/201604/wlcg/WLCG_All_Sites_CMS_Apr2016.pdf CMS]: All okay.
 
** [http://wlcg-sam.cern.ch/reports/2016/201604/wlcg/WLCG_All_Sites_LHCB_Apr2016.pdf LHCb]:
 
*** QMUL: 12%:12%
 
*** RHUL: 87%:89%
 
*** ECDF: 84%:84%.
 
* Outcomes from the [https://indico.cern.ch/event/522634/ DPM Collaboration meeting]. (see minutes at end)
 
* A reminder of next month’s GDB & pre-GDB and confirmation of topics. The pre-GDB, on Tuesday May 10th, will be an initial face to face meeting of the new Traceability & Isolation Working Group. The agenda, which is still being finalised is available [https://indico.cern.ch/event/394829/ here]. The GDB will take place on Wednesday May 11th. As well as some more routine updates and reports from the recent HEPiX and HEP Software Foundation workshop reports, there will be an in depth session, convened by Maarten Litmaath and Julia Andrea, focussing on ‘Easy Sites’ work around the streamlining of running and managing especially smaller WLCG grid sites.
 
  
 
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 74: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Monday 1st May'''
+
'''Tuesday 11th June'''
* There was a WLCG ops coordination meeting last Thursday. [https://indico.cern.ch/event/526215/ Agenda] | [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes160428 Minutes].  
+
 
** SL5 decommissioning (EGI, April 30, 2016). SL5 'ops' service probes will get CRITICAL. The whole retirement process is tracked [https://wiki.egi.eu/wiki/SL5_retirement here].
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
** New Traceability and isolation working group will have a dedicated session in May pre-GDB.
+
 
** New Task Force on Accounting review is under preparation to start addressing accounting issues.
+
'''Tuesday 14th May'''
** A detailed review of the Networking and Transfers WG was done. This includes a status report, ongoing actions and future R&D projects. More details in the agenda slides.
+
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
  
'''Monday 18th April'''
 
* MW Readiness WG achievements October 2015 - March 2016 - link to MB.
 
  
'''Tuesday 22nd March'''
 
* There was a [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes160317 WLCG ops coordination meeting last Thursday].
 
** T0 & T1s requested to check 2016 pledges attached to the agenda.
 
** The Multicore TF accomplished its mission. Its twiki remains as a documentation source.
 
** The gLExec TF also completed. Support will continue. Its twiki is up-to-date.
 
* There was a [http://indico.cern.ch/e/MW-Readiness_16 WLCG Middleware Readiness] meeting last Wednesday.
 
  
'''Tuesday 15th March'''
 
* [http://indico.cern.ch/e/MW-Readiness_16 MW Readiness WG meeting on Wed 16/3 at 4pm CET]. [https://twiki.cern.ch/twiki/bin/view/LCG/MWReadinessMeetingNotes20160316 Minutes are here].
 
* The [https://indico.cern.ch/event/504970/ ops coordination meeting is this Thursday at 14:30 UTC].
 
  
 
<!-- **********************End ops coord text************************** ----->
 
<!-- **********************End ops coord text************************** ----->
Line 110: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 17th May'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2016-05-11 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* There was a significant problem with the Tier1 tape library during last week. We were without tape access, or had only limited tape access, for around four days.
+
<!-- *********************************************************** ----->
* Castor 2.1.15 update is waiting. This is pending resolution of a problem around memory usage by the Oracle database behind Castor. We had thought to update the Castor SRMs to version 2.14 in the meantime. However, following advice from CERN this will not be done before the Castor update.
+
* "GEN Scratch" storage in Castor will be decommissioned. This has been announced via an EGI broadcast.
+
* We are migrating Atlas data from the T10000C to T10000D drives/media. We have moved around 300 out of 1300 tapes so far.
+
* One of the two batches of new CPU capacity is ready to go into production. Testing of other new capacity harware - i.e. the second batch of worker nodes and the disk - is proceeding OK.
+
* Catalin is organizing the CernVM Users Workshop at RAL on the 6-8 June 2016.
+
* Technically nothing to do with the Tier1: However, HEP SYSMAN dates for the RAL meeting are 21-23 June, with the first day being a Security training day.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 134: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20160504-minutes.txt Wednesday 04 May]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* GridPP/ATLAS input for [http://indico.cern.ch/event/394782/ GDB next week]
+
* DOME upgrade problems at Edinburgh
* Future evolution of T2s...
+
* Data management support/development for IRIS users
  
'''[http://storage.esc.rl.ac.uk/weekly/20160427-minutes.txt Wednesday 27 Apr]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Report from DPM collaboration meeting
+
* Rucio reporting
* GridPP as an einfrastructure (update)
+
  
'''[http://storage.esc.rl.ac.uk/weekly/20160420-minutes.txt Wednesday 20 Apr]'''
+
'''Wed 16 Oct'''
* Report from GridPP36.  Closer to understanding what a future T2 looks like.
+
* CEPH workshop at CERN report
* Report from DataCentreWorld/CloudExpo: Usual bigger and better data centre servers, networks, combined with cloud applications adoption and exciting new IoT devices
+
  
'''[http://storage.esc.rl.ac.uk/weekly/20160406-minutes.txt Wednesday 06 Apr]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
* GridPP ''is'' a Science DMZ!
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
* Special Kudos to Marcus for all his exciting ZFS work (see blog!)
+
* Roadmap for xroot and http TPC for RAL FTS(es)
* No meeting next week (Wedn. 13th) due to GridPP36
+
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20160330-minutes.html Wednesday 30 Mar]'''
 
* Lots of great suggestions for topics for the coming [https://indico.cern.ch/event/477023/ GridPP36 meeting]
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 168: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 
+
'''Tuesday 30 Apr 2019'''
'''Friday 29 Apr'''
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested  
* Vac 01.00 released.
+
 
+
'''Tuesday 5 Apr'''
+
* Vac 00.22 release (01.00 pre-release) ready. Includes Squid-on-hypervisor config in Puppet module.
+
* Aim to do Vac 01.00 release immediately after Pitlochry.
+
 
+
'''Tuesday 22 Mar'''
+
* GridPP DIRAC SAM tests now have gridpp and vo.northgrid.ac.uk pages
+
* Some pheno jobs have been run on VAC.Manchester.uk
+
* ATLAS cloud init VMs now running at Liverpool too
+
 
+
'''Tuesday 15 Mar'''
+
* Vac 00.21 deployed on all/some machines at all 5 production Vac sites
+
* Oxford Vac-in-a-Box set up in production
+
* ATLAS pilot factory at CERN configured for our ATLAS cloud init VMs
+
* ATLAS cloud init VMs running production jobs at Manchester and Oxford; being enabled at other sites
+
* vo.northgrid.ac.uk DIRAC jobs running in GridPP DIRAC VMs: should work for any GridPP DIRAC VO, since a parameter to the VM config.
+
* Multipayload LHCb pilot scripts tested in VMs: same pilot scripts can be used on VM or batch sites in multiprocessor slots.
+
 
+
'''Monday 29 Feb'''
+
* Vac 00.21 released, with new MJF
+
* EGI operations MB presentation positively received
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 208: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 9th February'''
+
'''Tuesday 6th February'''
* 4th Feb: The data from the  APEL summariser that was fixed yesterday has now propagated through the data pipeline and the Accounting Portal views and the Sync and Pub tests are all working again.
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
* Sheffield is slightly behind other sites (but looks normal) and so is QMUL.
+
  
'''Tuesday 24th November'''
 
* Slight delay for Sheffield.
 
  
'''Tuesday 3rd November'''
+
'''Tuesday 30th January'''
* APEL delay (normal state) Lancaster and Sheffield.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
'''Tuesday 20th October'''
+
'''Tuesday 24th Oct'''
The WLCG MB decided to create a Benchmarking Task force led by Helge Meinhard see [https://indico.cern.ch/event/433303/contribution/9/attachments/1154494/1658853/2015-09-15-LCGMB-Benchmarking.pdf talk]
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 237: Line 235:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 17th May'''
 
* TW implementing use-cases summary matrix according to these:
 
** CERN@school - LUCID (full workflow with DIRAC)
 
** GalDyn (full workflow with DIRAC)
 
** PRaVDA (full workflow with DIRAC)
 
** LSST (full workflow with Ganga + DIRAC)
 
** EUCLID (full workflow at the RAL T1)
 
** DiRAC (data storage/transfer)
 
** SNO+ (data transfer/networking)
 
  
'''Wednesday 4th May'''
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
  
Introduction added to explain _why_ CGROUPS are desired when using ARC/Condor.
 
  
https://www.gridpp.ac.uk/wiki/Enable_Cgroups_in_HTCondor
+
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
  
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
  
'''Tuesday 26th April'''
+
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
  
Statement on recent history of LSST VOMS records. To be discussed at Ops Meeting.
+
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
* Feb 16: 3 x VOMS servers, port 1503, names: voms.fnal.gov (DigiCert-Grid, admin), voms1.fnal.gov (DigiCert-Grid, not admin), voms2.fnal.gov (opensciencegrid , admin).
 
* Apr 18: 1 x VOMS server. port 15003, names: voms.fnal.gov (opensciencegrid, admin). Caused by a hitch with security that caused the omission of some data. GGUS: https://ggus.eu/?mode=ticket_info&ticket_id=120925. Fixed.
 
* Apr 21: 3 x VOMS servers, port 15003, names: voms.fnal.gov (opensciencegrid, admin), voms1.fnal.gov  (opensciencegrid, not admin), voms2.fnal.gov opensciencegrid admin
 
  
So, similar to how it was in feb, but DNs (and CA_DNs) of 2 certs changed. But other things to note:
 
* Alessandra tells us that further changes are pending.
 
* Daniela tells us that data at the server itself is old, and differs from data in the portal:  https://voms1.fnal.gov:8443/voms/lsst/configuration/configuration.action
 
  
Please discuss.
 
 
'''General note'''
 
'''General note'''
  
Line 277: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 284: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Monday 9th May'''
+
''' 14 May 2019 '''
* There was an EGI ops meeting today.
+
* Meeting for May cancelled. Next meeting is on 10th June.
** SL5 status was reviewed. Services remaining: WMS/LB being decommissioned at Glasgow; Lanacaster BDII scheduled for upgrade; Oxford SAM/VO Nagios. This is only on SL5 and plans across all NGIs to move to a central ARGO service are in place; RAL T1 Castor SRM systems. SRM upgrade waiting on Castor upgrade.
+
  
 +
''' Monday 11th March '''
  
'''Monday 18th April'''
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
  
* EGI Ops meeting today, agenda: https://wiki.egi.eu/wiki/Agenda-18-04-2016
+
 
* Major items:  
+
''' Tuesday 12th February '''
** SL5 progress tracking page: https://wiki.egi.eu/wiki/SL5_retirement
+
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
  
Line 310: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 
'''Tuesday 1st December'''
 
'''Tuesday 1st December'''
 
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
Line 320: Line 386:
  
  
''' Tuesday 31st March
 
 
* Glasgow Graphite/Grafana documentation: http://www.scotgrid.ac.uk/graphite/
 
 
'''Monday 7th December
 
 
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 341: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 15th March'''
+
'''Tuesday 5th February'''
* Normal week with few alarms which were fixed in time. Birmingham has  a low availability ticket. ECDF has ticket on hold as it test ARC CE and putting this CE in downtime might effect proper job test from ATLAS.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
'''Tuesday 16th February'''
 
* Team membership discussed at yesterday's PMB. We will need to look to the larger GridPP sites for more support.
 
*
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 360: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 7th December'''
+
'''Monday 20th November'''
* Raul reports: validation of site BDII on Centos 7 done.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 15th September'''
 
* [http://repository.egi.eu/2015/09/10/release-umd-3-13-3/ UMD 3.13.3 is available].
 
  
'''Tuesday 12th May'''
 
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
 
  
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 386: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 17th May'''
+
'''Tuesday 11th June
* [https://dist.igtf.net/distribution/igtf/current/ Updated IGTF distribution version 1.74 available] Note: The deployment of 1.74 will prevent monitoring errors when the old NorduGrid (2006) CA expired on May 15th
+
* Incident EGI-20160509-01 reported to site security contacts last week. No known links or impact on the UK NGI but, as usual, please check the information and recommendations in the report.
+
* UK NGI Security team meeting Weds 18th.
+
  
'''Tuesday 10th May'''
+
* NTR
* [https://www.openssl.org/news/secadv/20160503.txt OpenSSL security advisory] being evaluated by EGI SVG (but unlikely to be considered critical within EGI requiring immediate action)
+
* Today [https://indico.cern.ch/event/394829/ pre-GDB - Traceability & Isolation WG]
+
* Tomorrow [https://indico.cern.ch/event/394782/ GDB - Security Operations Centre WG update by David]
+
 
+
'''Tuesday 3rd May'''
+
* [https://indico.cern.ch/event/394829/ 10th May pre-GDB - Traceability & Isolation Working Group]
+
 
+
'''Monday 25th April'''
+
* Security threat Risk Assessment undertaken by EGI.
+
 
+
The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 420: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.grid.iu.edu/maddash-webui/ PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 428: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 10th May'''
+
'''Monday 5th March'''
* Next LHCOPN and LHCONE meeting: Helsinki (FI) 19-20 of September 2016: [https://indico.cern.ch/event/527372/ Agenda].
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
  
'''Tuesday 22nd March'''
+
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
* [http://www.pd.infn.it/~fanzago/SUMMARY/16_03_11-16_03_14-index-summarytest.html Summary of AAA opening and reading tests].
+
  
'''Tuesday 8th December'''
 
* Given the recent network issues and role of GridPP DIRAC, there are plans to have a slave DNS for gridpp.ac.uk at Imperial and hopefully the T1 too. Andrew will seek an update to the whois records and name servers once the other host sites are confirmed.
 
* Looking at the network problems this week will be of interest. Duncan supplied [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=Latency%20tests%20between%20all%20WLCG%20hosts this link]  and Ewan the one for the [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=Dual-Stack%20Mesh%20Config dual stack instance].
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 450: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 16th May 2016, 15.00 BST'''<br />
 
42 Open UK Tickets this week.
 
 
'''GOCDB/VOFEED mismatch tickets'''<br />
 
There are 7 open tickets left from last week's campaign to clean up the VO tags featured in the gocdb. Only the Birmingham ticket is still in the "assigned" state, the rest are undergoing discussion or requesting feedback/clarification.<br />
 
BIRMINGHAM [https://ggus.eu/?mode=ticket_info&ticket_id=121450 121450]<br />
 
RALPP [https://ggus.eu/?mode=ticket_info&ticket_id=121464 121464]<br />
 
LIVERPOOL [https://ggus.eu/?mode=ticket_info&ticket_id=121394121394]<br />
 
BRUNEL [https://ggus.eu/?mode=ticket_info&ticket_id=121388 121388]<br />
 
BRISTOL [https://ggus.eu/?mode=ticket_info&ticket_id=121386 121386] ''Update - closed, thanks Winnie!''<br />
 
ECDF [https://ggus.eu/?mode=ticket_info&ticket_id=121360 121360]<br />
 
RHUL [https://ggus.eu/?mode=ticket_info&ticket_id=121421 121421]
 
 
'''QUESTIONING ROD'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=121465 121465](11/5)<br />
 
This ECDF availability ticket is "on the mend", but Andy has asked how the numbers are calculated. Waiting for reply (16/5)
 
(This goes in hand with Andy's question in ECDF's other ROD ticket [https://ggus.eu/?mode=ticket_info&ticket_id=120004 120004])
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=120714 120714] (9/4)<br />
 
I think this Sussex ROD ticket is solved, the link to the tests looks green (in a good way). I think it can be closed? In progress (28/4)
 
 
'''OXFORD'''
 
[https://ggus.eu/?mode=ticket_info&ticket_id=120019 120019] (7/3)<br />
 
Talking of tickets that probably can be closed, I think this CMS subscription change request issue is solved? Either way it could do with an update. In progress (29/4)
 
 
'''RHUL'''
 
[https://ggus.eu/?mode=ticket_info&ticket_id=121516 121516] (12/5)<br />
 
A biomed ticket, possibly the same networking problems affecting them that affected atlas jobs (121540). It looks like this ticket snuck past your sentries, and could do with acknowledgment. Assigned (12/5) ''Update- updated and in progress, hope the networking problems go away.''
 
 
'''BIRMINGHAM''' <br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=121125 121125] (28/4)<br />
 
Did you chaps have any luck getting your dumps working? Taking a peek myself I see that your dumps directories are still empty. Let us know if you need a hand. In progress (4/5)
 
 
Any there any other tickets or issues people want bringing up?
 
 
And finally, the [https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?host=all&servicestatustypes=16&hoststatustypes=15 Other VO Nagios]...
 
  
 +
32 Open Tickets this week, which is an in depth a look as I've been able to take.
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 501: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
''' Tuesday 5th April 2016 '''
+
'''Monday 20th November'''
 
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
Oxford had a scheduled network warning so active nagios instance was moved from Oxford to Lancaster. I am not planning to move it back to Oxford for the time being.
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
 
+
 
+
''' Tuesday 26th Jan 2016 '''
+
 
+
One of the message broker was in downtime for almost three days. Nagios probes picks up a random message broker and failover is not working so a lot of ops jobs hanged for long time. Its a known issue and unlikely to be fixed as SAM Nagios is in its last leg. Monitoring is moving to ARGO and many things are not clear at the moment.  
+
 
+
'''Monday 30th November'''
+
* The SAM/ARGO team has created a [https://wiki.egi.eu/wiki/Service_Level_Target_-_Availability_Reliability document] describing Availability reliability calculation in ARGO tool.
+
 
+
 
+
  
''' Tuesday 6 Oct 2015'''
+
'''Tuesday 18th July'''
 +
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
Moved Gridppnagios instance back to Oxford from Lancaster. It was kind of double whammy as both sites went down together. Fortunately Oxford site was partially working so we managed to start SAM Nagios at Oxford. Sam tests were unavailable for few hours but no affect on egi availibilty/reliability. Sites can have a look at https://mon.egi.eu/myegi/ss/ for a/r status.
 
  
'''Tuesday 29 Sep 2015'''
 
 
Following an air-conditioning problem at machine room in Oxford Tier-2 site on 26 September, gridppnagios(OX) was shut down and gridppnagios(Lancs) became active instance. Oxford site is in downtime until 1st Oct and it may be extended depending on the situation.
 
VO-Nagios was also unavailable for two days but we have started it yesterday as it is running on a VM. VO-nagios is using oxford SE for replication test so it is failing those tests. I am looking to change to some other SE.     
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 531: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 537: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 19th May'''
 
* There is a current priority for enabling/supporting our joining communities.
 
  
'''Tuesday 5th May'''
+
'''Monday 20th November'''
* We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 28th April'''
 
* For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503.
 
 
'''Tuesday 31st March'''
 
* LIGO are in need of additional support for debugging some tests.
 
* LSST now enabled on 3 sites. No 'own' CVMFS yet.
 
  
 
* Impact
 
* Impact
Line 566: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 23rd February'''
+
'''Date'''
 
+
* For January:
+
[http://wlcg-sam.cern.ch/reports/2016/201601/wlcg/WLCG_All_Sites_ALICE_Jan2016.pdf ALICE]:
+
All okay.
+
 
+
* [http://wlcg-sam.cern.ch/reports/2016/201601/wlcg/WLCG_All_Sites_ATLAS_Jan2016.pdf ATLAS]:
+
RHUL 89%:89%
+
Lancaster 0%:0%
+
 
+
* [http://wlcg-sam.cern.ch/reports/2016/201601/wlcg/WLCG_All_Sites_CMS_Jan2016.pdf CMS]:
+
RALPP: 80%::80%
+
 
+
* [http://wlcg-sam.cern.ch/reports/2016/201601/wlcg/WLCG_All_Sites_LHCB_Jan2016.pdf LHCb]:
+
RALPP: 77%:77%
+
 
+
* Site responses:
+
 
+
** RHUL: The largest problem was related to the SRM. The DPM version was upgraded and it took several weeks to get it working again (13 Jan onwards). Several short-lived occurrences of running out of space on the SRM for non-ATLAS VOs. For around 3 days (15-17 Jan) the site suffered from a DNS configuration error by their site network manager which removed their SRM from the DNS, causing external connections such as tests and transfers to fail. For one day (25 Jan) the site network was down for upgrade to the 10Gb link to JANET. Some unexpected problems occurred extending the interruption from an hour to a day. The link has been successfully commissioned.
+
 
+
** Lancaster: The ASAP metric for Lancaster for January is 97.5 %. There is a particular problem with ATLAS SAM tests which doesn’t affect the site activity in production and analysis and this relates to the path name being too long. A re-calculation has been performed.
+
 
+
** RALPP: Both CMS and LHCb low figures are due to specific CMS jobs overloading the site SRM head node. The jobs should have stopped now.
+
  
  

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note