Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(2,108 intermediate revisions by 22 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 8th February 2016
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
'''Tuesday 9th February'''
 
* The WLCG Collaboration meeting took place last week: [https://indico.cern.ch/event/433164/other-view?view=standard Agenda].
 
* Alessandra: Changes of memory settings in panda
 
* CHEP2016 first [http://chep2016.org/sites/default/files/bulletins/CHEP2016FirstBulletin.pdf bulletin].
 
* NOTICE: Java upgrade impacts experiment activities -  a recent set of java 6-7-8 openjdk upgrades on SL5/SL6/SL7 disable support for the MD5 hash algorithm in certificates and proxies requiring sysadmin intervention.
 
* RIPE Academic Cooperation Initiative.
 
* voms2 for lsst
 
  
 +
'''Tuesday 11th June'''
  
'''Tuesday 26th January'''
+
* Technical Meeting last week about the New JSON based Information System: https://indico.cern.ch/event/821105/
* RHUL: spacetoken for snoplus?
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
* Winnie: CREAM-CEs red, "No handlers could be found for logger "stomp.py""
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
* Elena: how to limit the number of running jobs per user in condor -> Concurrency Limits.
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
* [https://www.gridpp.ac.uk/userguide/data-on-the-grid/dirac-dfc-cli.html DIRAC File Catalog Command Line Interface guide] added to the GridPP User Guide by Tom.
+
<!-- ***********************Start General text*********************** ----->'''
* What to update when adding a VO (the LSST example!).
+
'''Tuesday 4th June 2019'''
* [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20160113 Notes from the January GDB] are now available.
+
* The Security Day + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
* Publishing CPUs...!
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
* Sam: WLCG WORKSHOP Site Feedback on Storage technologies.
+
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Tuesday 19th January'''
 
* There was a GDB last week. [http://indico.cern.ch/event/394776/ Agenda].
 
* Additional material can now be found in the [https://indico.cern.ch/event/465560/ HEPSYSMAN meeting] and [http://indico.cern.ch/event/465558/ GANGA workshop] agenda pages.
 
* Monday's ops update is available [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGDailyMeetingsWeek160118#Monday here].
 
* As circulated to TB-SUPPORT: The T2 WLCG A/R results for December are now available.
 
** [http://wlcg-sam.cern.ch/reports/2015/201512/wlcg/WLCG_All_Sites_ALICE_Dec2015.pdf ALICE]. All okay.
 
** [http://wlcg-sam.cern.ch/reports/2015/201512/wlcg/WLCG_All_Sites_ATLAS_Dec2015.pdf ATLAS].
 
*** QMUL: 71%: 76%
 
*** RHUL: 89%: 95%
 
*** Lancaster: 0%: 0%
 
** [http://wlcg-sam.cern.ch/reports/2015/201512/wlcg/WLCG_All_Sites_CMS_Dec2015.pdf CMS]
 
*** RALPP: 89%: 89%
 
** [http://wlcg-sam.cern.ch/reports/2015/201512/wlcg/WLCG_All_Sites_LHCB_Dec2015.pdf LHCb]
 
*** Lancaster: 81%: 96%
 
*** RALPP: 87%: 87%
 
  
 
 
'''Tuesday 12th January'''
 
* Reminder: WLCG workshop registration closes on 22nd.
 
* [http://indico.cern.ch/event/394776/ GDB this Wednesday] with a security focus.
 
 
 
'''Tuesday 5th January'''
 
* [https://indico.cern.ch/event/465560/ HEPSYSMAN meeting] Friday and [http://indico.cern.ch/event/465558/ GANGA workshop] Thursday next week.
 
* WLCG operations [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGDailyMeetingsWeek160104#Monday Monday 4th January report].
 
* [https://twiki.cern.ch/twiki/pub/LCG/WLCGBaselineVersions/dcache-bug.txt dCache bug reported] 17th December.
 
* The [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20151209 December GDB notes] have been released.
 
* [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
 
* A reminder that those going to the [https://indico.cern.ch/event/433164/timetable/#all.detailed WLCG workshop] in February need to register.
 
* There is a GDB next Wednesday (13th): [http://indico.cern.ch/event/394776/ Agenda] not yet ready but will cover "a number of talks focussing on security & related issues".
 
  
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
Line 94: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 9th February'''
+
'''Tuesday 11th June'''
* The next ops coordination meeting will be on 18th February.
+
 
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
  
'''Tuesday 26th January'''
 
* Minutes from the [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGDailyMeetingsWeek160118#Thursday Thursday 21st Ops Coordination Meeting].
 
  
'''Tuesday 19th January'''
 
* The next WLCG MW readiness group meeting will be on 27th January: [http://indico.cern.ch/e/MW-Readiness_15 Agenda] at 15:00 UTC.
 
* There is an ops coordination meeting this Thursday at 14:30 UTC: [https://indico.cern.ch/event/466817/ Agenda].
 
  
  
Line 120: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 9th February'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2016-01-20 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* We are investigating why LHCb batch jobs sometimes fail to write results back to Castor (and the sometimes fail to write remotely as well). A recent change has improved, but not fixed, this problem.
+
<!-- *********************************************************** ----->
* We will migrate Atlas and LHCb data from the T10KC (5TB) to T10KD (8TB) generation tapes. Details (including timings) yet to be finalized but likely to start with Atlas first.
+
* We have seen a higher rate of problems on some disk servers in recent weeks. These are mainly individual disk failures. This is being reviewed. We had significant data loss from a disk server in AtlasScratchDisk when it suffered a triple disk failure a week ago.
+
* We are working a refresh of the database system behind the LFC.
+
* All ARC-CEs have been updated to version 5.0.5).
+
* We are preparing to put a HAProxy load balancer in front of the FTS service. Initially this will be for our "test" FTS3 service (used by Atlas).
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 143: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20160120-minutes.txt Wednesday 20 Jan]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Operational issues (DPM database errors) and kablooie
+
* DOME upgrade problems at Edinburgh
* hepsysman report
+
* Data management support/development for IRIS users
* Gathering site issues and thoughts in prep'n for the coming WLCG workshop and ATLAS jamboree
+
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
  
'''[http://storage.esc.rl.ac.uk/weekly/20160113-minutes.txt Wednesday 13 Jan]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
* "Diskless" Tier 2 testing to go ahead anyway at Oxford; also Bristol may be interesting/interested
+
* Storage related stuff at the FNAL (pre-)GDBs
* Need feedback from VOs on catalogue format and location before rolling out to remaining sites
+
* DOME upgrade tickets for non-DOME DPM sites
  
'''[http://storage.esc.rl.ac.uk/weekly/20160106-minutes.txt Wednesday 06 Jan]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
* Merry and happy. Apart from Glasgow losing power, most T2s came through the hols relatively unscathed
+
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
* Key member of T2 storageanddatamanagement supportologists leaving *sad face*
+
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
* Excellent [http://gridpp-storage.blogspot.co.uk/2016/01/update-on-vodiracacuk-data-mopvement.html DiRAC progress] over hols (thanks, Lydia!), now need Leicester started.
+
* More generally, GridPP as a data (only) infrastructure, bring your own compute. Good case, but you need to bring your own catalogue (more or less), too, which may not suit everyone.
+
* Will a future T2 be built on CEPH? Not likely...
+
  
'''[http://storage.esc.rl.ac.uk/weekly/20151216-minutes.html Wednesday 16 Dec]'''
 
* Sam presented at and reports from DPM workshop
 
* Last preparations/coordination before the hols
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 177: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 
+
'''Tuesday 30 Apr 2019'''
'''Monday 8 Feb'''
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested  
* Cloud Init ATLAS VMs successfully running production jobs at Manchester. Looking at logging and VM lifetime.
+
 
+
'''Monday 25 Jan'''
+
* Vac 00.20.00 released. Emulates OpenStack environment for VMs, Cloud Init, contextualization from HTTP.
+
* Restarted testing of Cloud Init ATLAS VMs, and now getting jobs running to Finished state.
+
 
+
'''Tuesday 19 Jan'''
+
* Vcycle now supports EC2 API, and preparing to test with Open Nebula at RAL Tier1
+
* Next Vac release (00.20) being tested with LHCb production. This removes the need to have an internal NFS server and supports VMs using Cloud Init.
+
* Some work last month on revised ATLAS VMs; hoping to converge with VMs run at CERN and on HLT.
+
* Vac-in-a-Box updated for Vac 00.20 and NFS-less operation, and numerous feature requests (e.g. bulk adding of hypervisors)
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 206: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 9th February'''
+
'''Tuesday 6th February'''
* 4th Feb: The data from the  APEL summariser that was fixed yesterday has now propagated through the data pipeline and the Accounting Portal views and the Sync and Pub tests are all working again.
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 24th November'''
 
* Slight delay for Sheffield.
 
  
'''Tuesday 3rd November'''
+
'''Tuesday 30th January'''
* APEL delay (normal state) Lancaster and Sheffield.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
'''Tuesday 20th October'''
+
'''Tuesday 24th Oct'''
The WLCG MB decided to create a Benchmarking Task force led by Helge Meinhard see [https://indico.cern.ch/event/433303/contribution/9/attachments/1154494/1658853/2015-09-15-LCGMB-Benchmarking.pdf talk]
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 234: Line 235:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 9th February'''
 
* Guidelines for using the DIRAC command line tools and the DIRAC File Catalog metadata functionality to the [https://www.gridpp.ac.uk/userguide/data-on-the-grid/data-on-the-grid.html UserGuide].
 
  
'''Tuesday 12th January'''
+
''' Tue 9th July 2019'''
* The VOID cards (and hence the Yaim records) for CDF, PLANCK, SUPERBVO, LSST, MAGIC and ENMR have changed a bit. Sites that support any of these may want to have a look. See the [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs GridPP approved VOs page].
+
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
  
* WLCG Information System Evolution Task Force is drafting refined definitions for LOG_CPU and PHYS_CPU, as well as the benchmark/calibration process. Progress is documented in this agenda:
 
https://indico.cern.ch/event/471965/
 
In particular, sites should note the 'BenchmarkingProcess.txt' (attached to agenda) which lays out in general terms how to run benchmark instances to obtain maximum throughput, and the GridPP Publishing Tutorial (https://www.gridpp.ac.uk/wiki/Publishing_tutorial) which WLCG propose to adopt (with some modifications.)
 
  
 
'''General note'''
 
'''General note'''
Line 254: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 261: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Monday 8th January'''
+
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
  
* EGI Ops meeting today, agenda: https://wiki.egi.eu/wiki/Agenda-08-02-2016
+
''' Monday 11th March '''
* Major items:  
+
 
** Aligning Fedcloud sites to the A/R procedures
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
** New SL5 testing probes
+
* UMD 4.8.2 released : ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
  
Line 283: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 
'''Tuesday 1st December'''
 
'''Tuesday 1st December'''
 
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
Line 293: Line 386:
  
  
''' Tuesday 31st March
 
 
* Glasgow Graphite/Grafana documentation: http://www.scotgrid.ac.uk/graphite/
 
 
'''Monday 7th December
 
 
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 314: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th January'''
+
'''Tuesday 5th February'''
* On Friday, one of the message brokers was in downtime and due to a bug, nagios probes were not failing over to the working one.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* There was another issue which prevented applying a workaround in the gridppnagios server.
+
* Few availability tickets on hold
* A new rota is being compiled.
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''Monday 11th January'''
+
'''Tuesday 14th August'''
* There was a problem with the dashboard during the week, where alarms wouldn't clear even though they had cleared in the nagios. The portal people are aware of this.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* The current alarms in Manchester (vomsserver) are thought to be fixed - the dashboard just hasn't caught up.
+
 
+
'''Monday 14th December'''
+
* Janet issue affected ROD dashboard access making it almost unusable.
+
* GGUS was updated on Wednesday (09/12/15) and was in downtime for two hours. The update did not go smoothly and the downtime was extended. The GGUS interface did not work  through the dashboard for most of the morning on Wednesday.
+
* There were quite a few alarms throughout the week - most disappeared without intervention.
+
* Three open tickets remain against QMUL, RHUL and Lancaster.  
+
  
  
Line 341: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 7th December'''
+
'''Monday 20th November'''
* Raul reports: validation of site BDII on Centos 7 done.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 15th September'''
 
* [http://repository.egi.eu/2015/09/10/release-umd-3-13-3/ UMD 3.13.3 is available].
 
  
'''Tuesday 12th May'''
 
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
 
  
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 367: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Monday 8th February'''
+
'''Tuesday 11th June
* EGI SVG Advisory 'HIGH' risk CVE-2016-0728 Linux Kernel vulnerability [EGI-SVG-2016-10376]
+
  
 
+
* NTR
'''Tuesday 26th January'''
+
* CVE-2016-0728 Linux kernel: use after free in keyring facility local privilege escalation. EGI SVG Advisory in the works. Affects RH7 and derivatives/similar. RH5,RH6 and derivatives are not affected. RH/SL/CentOS updates published 25/01/2016
+
* The IGTF has released a regular update to the trust anchor repository (1.71) - for distribution ON OR AFTER January 25th -
+
 
+
'''Tuesday 12th January'''
+
* JISC report on December DDOS available from - [https://www.jisc.ac.uk/network/issues https://www.jisc.ac.uk/network/issues]
+
* EGI SVG advisory for Linux Kernel vulnerabilities (Moderate/High risk) - [https://wiki.egi.eu/wiki/SVG:Advisory-SVG-2015-CVE-2015-7613 Advisory-SVG-2015-CVE-2015-7613]
+
 
+
'''Tuesday 15th December'''
+
* No updates applicable for the UK
+
* News from elsewhere: EGI CSIRT activity is now suspending multiple sites following CVE-2015-7181/2/3, largely due to simple failure to acknowledge the notification, which was all that was required.
+
 
+
The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 401: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.grid.iu.edu/maddash-webui/ PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 409: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 8th December'''
+
'''Monday 5th March'''
* Given the recent network issues and role of GridPP DIRAC, there are plans to have a slave DNS for gridpp.ac.uk at Imperial and hopefully the T1 too. Andrew will seek an update to the whois records and name servers once the other host sites are confirmed.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.  
* Looking at the network problems this week will be of interest. Duncan supplied [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=Latency%20tests%20between%20all%20WLCG%20hosts this link]  and Ewan the one for the [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=Dual-Stack%20Mesh%20Config dual stack instance].  
+
  
'''Tuesday 6th October'''
+
'''Monday 10th September'''
* A reminder, the next [https://indico.cern.ch/event/401680/ LHCOPN and LHCONE joint meeting]: Science Park Amsterdam (NL) 28-29 of October 2015
+
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
  
'''Tuesday 14th July'''
+
'''Monday 2nd July'''
* GridPP35 in September will have a part focus on networking and IPv6. This will include a review of where sites are with their deployment. Please try to firm up dates for your IPv6 availability between now and September. Please update the [https://gridpp.ac.uk/wiki/IPv6_site_status GridPP IPv6 status table].  
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
  
Line 432: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 8th February 2016, 13.30 GMT'''<br />
 
<strike>44</strike> 43 Open UK Tickets this month. Going over all of them, in kinda-alphabetical order.
 
 
'''NGI'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118930 118930] (18/1)<br />
 
That NGI information ticket, linked to the "wrong" (according to some) information being published by the UK arc CEs. This has haunted us for a while, the consensus was the ticket is a load of B-word and not really worth worrying over - but it does warrant a response (from someone over that Steve J).. Assigned (19/1)
 
 
'''SUSSEX'''<br />
 
With Matt RB off to pastures green Sussex is in limbo - I'll contact Jeremy M concerning this last week's fresh tickets.
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117894 117894] (23/11)<br />
 
Atlas Consistency Checking. On hold (25/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118289 118289] (10/12)<br />
 
Gridpp Pilots. On hold (25/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118337 118337] (14/12)<br />
 
The Sussex SE was not working for Sno+ - the most serious of these older issues. On hold (25/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119383 119383] (5/2)<br />
 
ROD Availability ticket. Assigned (5/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119384 119384] (5/2)<br />
 
ROD CA distribution ticket. Maybe the two ROD tickets are correlated (i.e. if we fix this one the previous one will soothe itself?) Assigned (5/2)
 
 
'''RALPP'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118945 118945] (19/1)<br />
 
Poor CMS SAM results for RALPP due to digi-reco work pummeling the RALPP storage - Chris has asked for the digi-reco workload to stop at RALPP, then asked for clarification as to why the site was still in unknown state. Waiting for reply (25/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118628 118628] (5/1)<br />
 
LZ Pilot deployment at RALPP. Chris has submitted a bug report to nordugrid to fix the issue (http://bugzilla.nordugrid.org/show_bug.cgi?id=3529), which was fixed and should be available in the next release. On Hold (26/1)
 
 
'''OXFORD'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119197 119197] (29/1)<br />
 
CMS has asked to change some CRAB site configs at T3s - Daniela has ashed Chris B if he's the one looking after this for Oxford. Assigned (3/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117892 117892] (23/11)<br />
 
Atlas consistency checks. Ewan has firmly and clearly put this on the backburner. On hold (12/1)
 
 
'''BIRMINGHAM'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118155 118155] (4/12)<br />
 
Biomed having a clear up of their stuff on the Brummie SE. Franck has given the nod for deleting the dark data left in the DPM after their cleanup efforts. It's on their heads now! In progress (2/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117890 117890] (23/11)<br />
 
Another Atlas Storage Consistency Checking ticket. Any chance to have a look at this again? On hold (15/12)
 
 
'''GLASGOW'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117706 117706] (19/11)<br />
 
Another pilot ticket, this time for pheno. Glasgow were going to roll this into their overhaul of their identity management gubbins, but the Universe messed with their plans. How goes things? On hold (15/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118052 118052] (30/11)<br />
 
HTTP support on the Glasgow SE. I suspect progress here took a similar shoeing to the identity management plan - but the ticket could do with an update (and maybe on holding). In Progress (4/1)
 
 
'''ECDF'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118787 118787] (12/1)<br />
 
Another HTTP ticket. Let us know if you need a hand Marcus and Andy. Or if you're too busy to make this a priority consider on-holding it. In progress (12/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=95303 95303] (1/7)<br />
 
Tarball glexec ticket. On hold for a very long time.
 
 
''An update on this - I managed to put in some good hours on trying to build a relocatable glexec last week, successfully building from source glexec and the lcas/lcmaps stack. *But* I still have rpath problems - short of attacking every lib file with patchelf I'm not sure how to proceed, and the process is such a mess that I'm not sure if I'll ever manage to make it into a proper recipe (much like my cocoa-butter shortbread).''
 
 
'''SHEFFIELD'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119374 119374] (5/2)<br />
 
A fresh ticket from Biomed, about incorrect/no dynamic information being published at Sheffield. In progress (5/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118789 118789] (12/1)<br />
 
ROD Information system ticket, almost certainly caused by the same underlying issue. Is the bdii service on your CEs silently dying or failing to update?
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=114460 114460] (18/6)<br />
 
Gridpp Pilots. Changes were implemented but at last check things weren't working right. How goes it now? In progress (20/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117886 117886] (23/11)<br />
 
Atlas Storage Consistency Check ticket - any luck with this? On hold (29/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118764 118764] (12/1)<br />
 
HTTP support ticket for the Sheffield SE. Have you had a chance to have a look at this? In progress (25/1)
 
 
''The Storage list can lend a hand fixing either of these issues (which goes for everyone of course).''
 
 
'''MANCHESTER'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118679 118679] (7/1)<br />
 
HTTP support (atlas edition). Hit a problem due to there being no outside-a-space-token space at Manchester. On Hold (12/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118674 118674] (7/1)<br />
 
HTTP Support (lhcb edition). As above. On Hold (12/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117885 117885] (23/11)<br />
 
Atlas Storage Consistency Checks - hit the same problem as the previous 2 tickets. On hold (10/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118603 118603] (4/1)<br />
 
A VOMS ticket rather then a site ticket, removal of the nsccs.ac.uk VO. The VO has been removed from the other UK voms servers. In progress (5/2)
 
 
'''LANCASTER'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=95299 95299] (1/7)<br />
 
Lancaster's glexec tarball ticket. See the entry above - although I really need to update the ticket properly! Practice what you preach, Matt! On hold.
 
 
'''RHUL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119380 119380] (5/2)<br />
 
ROD Low availability ticket - the site is in the green now, so it's the usual 30-day wait. On hold (8/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117881 117881] (23/11)<br />
 
Atlas SCC ticket. On hold until March. On hold (1/2)
 
 
'''QMUL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117723  117723] (19/11)<br />
 
Pilots at QM. Dan's been working on this, and asked Daniela for a picture of what should be enabled[1] - Any joy? In progress (27/1)
 
 
[1] http://www.hep.ph.ic.ac.uk/~dbauer/dirac/site_pilot_status.html
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117880 117880] (23/11)<br />
 
Atlas SCC ticket (wish I had started using that acronym sooner). Just waiting for the nod from atlas that all is well. Dan included the script he uses that may be useful for other STORM sites. Waiting for reply (4/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118985 118985] (21/1)<br />
 
QM has banished biomed from their queues until QM have a cgroupy solution to the ill-behaved biomed user jobs. Biomed have asked that the ban be reconsidered and problem users by dealt with by the VO. QM are perfectly right to say no to this, but it'll be nice to not leave them hanging. On hold (1/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119348 119348] (4/2)<br />
 
LHCB have noticed cvmfs issues on some nodes, which Dan couldn't replicate. Dan ponders that perhaps this is caused by ephemeral memory issues on the nodes, noting more swap being used recently. Waiting for reply (4/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119409 119409] (8/2)<br />
 
Fresh ROD emi glexec ticket - things exploded at the weekend but the QM admins are fighting the good fight. In progress (8/2)
 
 
'''IMPERIAL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119294 119294] - but this got solved by the times I got to it (it concerned a java update breaking md5).
 
 
'''BRUNEL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117878 117878] (23/11)<br />
 
Atlas SCC - Raul provided an example and is waiting on atlas to give a yay or nay before deploying. Waiting for reply (18/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118740 118740] (10/1)<br />
 
Atlas MCORE problems at Brunel, looks to be caused by some extreme Condor oddness, Raul reconfigured Condor to give a better view. Any job? In progress (25/1)
 
 
'''100IT'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119002 119002] (Reopened)<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116358 116358] (In Progress)<br />
 
Not going into detail with these as I'm not sure what the crack is with 100IT.
 
 
'''AND FINALLY...'''
 
 
'''THE TIER 1'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=118809 118809] (12/1)<br />
 
The Tier 1 provided feedback on configuring memory limits for batch jobs, the ticket left open for follow up. On hold (13/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=116864 116864] (12/10)<br />
 
CMS AAA tests failing. Andrew L reports that the CASTOR headnode has received what sounds like a big fix which will hopefully improve things. In progress (29/1)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=119389 119389] (5/2)<br />
 
LHCB data transfer problem to RAL. Being looked at. In progress (5/2)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=117683 117683] (18/11)<br />
 
Another publishing ticket. How we love those! This one about CASTOR not publishing GLUE 2. Code was written by Jens and Rob but not integrated, something that works might be a long way off. That was a month ago, any news since? In progress (5/2)
 
  
[https://ggus.eu/?mode=ticket_info&ticket_id=109358 109358] (15/10) or (5/2)<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
This ticket is weird - it started in a "waiting for reply" state and was apparently issued in 2014! I can't find a ticket with this number in my records though.
+
Sno+ are unable to use the RAL WMS - it's being looked at. In progress (5/2)
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 601: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Monday 20th November'''
 +
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
  
''' Tuesday 26th Jan 2016 '''
+
'''Tuesday 18th July'''
 +
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
One of the message broker was in downtime for almost three days. Nagios probes picks up a random message broker and failover is not working so a lot of ops jobs hanged for long time. Its a known issue and unlikely to be fixed as SAM Nagios is in its last leg. Monitoring is moving to ARGO and many things are not clear at the moment.
 
  
'''Monday 30th November'''
 
* The SAM/ARGO team has created a [https://wiki.egi.eu/wiki/Service_Level_Target_-_Availability_Reliability document] describing Availability reliability calculation in ARGO tool.
 
 
 
 
''' Tuesday 6 Oct 2015'''
 
 
Moved Gridppnagios instance back to Oxford from Lancaster. It was kind of double whammy as both sites went down together. Fortunately Oxford site was partially working so we managed to start SAM Nagios at Oxford. Sam tests were unavailable for few hours but no affect on egi availibilty/reliability. Sites can have a look at https://mon.egi.eu/myegi/ss/ for a/r status.
 
 
'''Tuesday 29 Sep 2015'''
 
 
Following an air-conditioning problem at machine room in Oxford Tier-2 site on 26 September, gridppnagios(OX) was shut down and gridppnagios(Lancs) became active instance. Oxford site is in downtime until 1st Oct and it may be extended depending on the situation.
 
VO-Nagios was also unavailable for two days but we have started it yesterday as it is running on a VM. VO-nagios is using oxford SE for replication test so it is failing those tests. I am looking to change to some other SE.     
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 627: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 633: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 19th May'''
 
* There is a current priority for enabling/supporting our joining communities.
 
  
'''Tuesday 5th May'''
+
'''Monday 20th November'''
* We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 28th April'''
 
* For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503.
 
 
'''Tuesday 31st March'''
 
* LIGO are in need of additional support for debugging some tests.
 
* LSST now enabled on 3 sites. No 'own' CVMFS yet.
 
  
 
* Impact
 
* Impact
Line 662: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 24th February'''
+
'''Date'''
* Next review of status today.
+
 
+
'''Tuesday 27th January'''
+
* Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
+
* Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.
+
 
+
'''Tuesday 2nd December'''
+
* [https://www.gridpp.ac.uk/wiki/Batch_system_status Multicore status]. Queues available (63%)
+
** YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
+
** NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
+
 
+
* According to our [https://www.gridpp.ac.uk/wiki/Batch_system_status table] for cloud/VMs (26%)
+
** YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
+
** NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
+
 
+
* [http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg GridPP DIRAC jobs] successful  (58%)
+
** YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
+
** NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
+
 
+
* [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 status]
+
** Allocation - 42%
+
** YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
+
** NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
+
 
+
* Dual stack nodes - 21%
+
** YES: Brunel; IC; QMUL; Oxford (4)
+
** NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)
+
 
+
 
+
 
+
'''Tuesday 21st October'''
+
* High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).
+
  
'''Tuesday 9th September'''
 
* Intel announced the new generation of Xeon based on Haswell.
 
  
  

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A