(Created page with "==LZ== ''PoC: David Colling (DC) (also: Elena K)'' (though Dave C likes to be kept in the loop, so please cc him on emails) LZ UK Data Cenre which is based on GridPP CPU reso...")
 
(LZ)
Line 1: Line 1:
 
==LZ==
 
==LZ==
''PoC: David Colling (DC) (also: Elena K)'' (though Dave C likes to be kept in the loop, so please cc him on emails)
+
''PoC: Elena K, Daniela B'' (on emails please also cc David Colling)
 
+
LZ UK Data Cenre which is based on GridPP CPU resources passed Final Design Review on 10.03.2017
+
 
+
  
 +
LZ UK Data Centre which is based on GridPP CPU resources passed its Final Design Review on 10.03.2017: <br>
 
Imperial will host a complete copy of the LZ data (GridPP funding be willing). An outline of this can be found in the LZ conceptual design report: [https://arxiv.org/abs/1509.02910 CDR] (page 258/Chapter 15).
 
Imperial will host a complete copy of the LZ data (GridPP funding be willing). An outline of this can be found in the LZ conceptual design report: [https://arxiv.org/abs/1509.02910 CDR] (page 258/Chapter 15).
  
All Monte Carlo for the TDR was generated using Dirac and shell scripts. Only a few extra TDR jobs being run to fix holes. After TDR next step is to have full Gaudi simulations. <br>
+
Elena is the production manager. Monte Carlo Generation for the Mock Data Challenge 2017 should start 7th June 2017.
  
LZ has been successfully running large scale simulations at Imperial/Sheffield/QMUL/RALPP/Brunel. Currently (Feb 27) talking to Lancaster.<br>
+
Work ongoing at Imperial on production job submission interface (see page 9-11 in [http://indico.cern.ch/event/505613/contributions/2230725/attachments/1340849/2038979/Oral-383.pdf CHEP 2016] talk)<br>
  
Work ongoing on productionjob submission interface (see page 9-11 in [http://indico.cern.ch/event/505613/contributions/2230725/attachments/1340849/2038979/Oral-383.pdf CHEP 2016] talk)<br>
+
=== Permanent links ===
 +
[http://lz.lbl.gov/ Experiment Website] <br>
 +
[https://arxiv.org/abs/1703.09144 TDR] <br>
 +
For configuration, please use the entry in the [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Yaim_Records Approved VOs] Wiki page.

Revision as of 12:04, 6 June 2017

LZ

PoC: Elena K, Daniela B (on emails please also cc David Colling)

LZ UK Data Centre which is based on GridPP CPU resources passed its Final Design Review on 10.03.2017:
Imperial will host a complete copy of the LZ data (GridPP funding be willing). An outline of this can be found in the LZ conceptual design report: CDR (page 258/Chapter 15).

Elena is the production manager. Monte Carlo Generation for the Mock Data Challenge 2017 should start 7th June 2017.

Work ongoing at Imperial on production job submission interface (see page 9-11 in CHEP 2016 talk)

Permanent links

Experiment Website
TDR