Difference between revisions of "GridPP VO Incubator"

From GridPP Wiki
Jump to: navigation, search
(LSST)
(LSST)
Line 260: Line 260:
 
|Closed
 
|Closed
 
|2015-12-11
 
|2015-12-11
|Got the Dirac pilot DN assigned to the pilot role on VOMS, enabled the VO on Dirac, enabled pilot at sites, tested submission and fixed misconfigured sites. JIRA https://its.cern.ch/jira/browse/GRIDPP-22
+
|Got the Dirac pilot DN assigned to the pilot role on VOMS, enabled the VO on Dirac, enabled pilot at sites, tested submission and fixed misconfigured sites. JIRA https://its.cern.ch/jira/browse/GRIDPP-22 <br>
https://ggus.eu/index.php?mode=ticket_info&ticket_id=117585 https://ggus.eu/index.php?mode=ticket_info&ticket_id=117586
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=117585 <br> https://ggus.eu/index.php?mode=ticket_info&ticket_id=117586
 
|-
 
|-
 
|VOI-LSST-008
 
|VOI-LSST-008

Revision as of 01:21, 11 December 2015

This page is for monitoring the progress of new(ish) GridPP VOs.

  • PoC - Point of Contact

All new VOs

These tasks will need to be completed for all

Action ID Action description Owner Target date Status Date closed Notes
VOI-GEN-001 Deploy test software to RVO CernVM-FS repositories. Duncan, Daniela, Gareth, Alessandra, Ewan 2015-05-26 Open N/A New users in the Regional VOs will need to run test jobs using software in the RVO CernVM-FS repositories. This test software will need to be uploaded by the RVO admins. Instructions for doing this can be found here.
VOI-GEN-002 Write up the VO registration procedure Tom 2015-05-31 In progress N/A Guide started here - comments and feedback appreciated.

DEAP3600

PoC: Jeremy Coles (JC)

DiRAC

PoC: Jens Jensen, Brian Davies


Action ID Action description Owner Target date Status Date closed Notes
VOI-DIRAC-001 Set up VO in GridPP JJ 2015-04-30 Closed
VOI-DIRAC-002 Register DiRAC with EGI JJ 2015-05-31 Closed [1]
VOI-DIRAC-003 Write up DiRAC site setup document LH 2015-08-31 Closed Version 1.3 circulated to DIRAC-USERS
VOI-DIRAC-004 Re-evaluate data packaging method JJ 2015-11-30 In Progress Need a new method. Sam contributing.
VOI-DIRAC-005 Restart transfers with new method (VOI-DIRAC-004) LH 2015-12-10 Open
VOI-DIRAC-006 Get Leicester ready for transfer JJ 2015-11-30 In Progress Leicester now have certificates again. Need to await solution to VO-DIRAC-004


GalDyn

PoC: Tom Whyntie (TW)

Action ID Action description Owner Target date Status Date closed Notes
VOI-GAL-001 Assist GalDyn users with CernVM creation and testing. TW 2015-02-18 Closed 2015-02-18 GalDyn users have successfully instantiated CernVMs for accessing the grid.
VOI-GAL-002 Assist GalDyn users with running test jobs on the Imperial DIRAC instance. TW 2015-02-23 Closed 2015-02-23 GalDyn users have successfully run test jobs on the Imperial DIRAC instance via a GridPP CernVM.
VOI-GAL-003 Assist GalDyn users with compiling user software on the CernVM. TW 2015-03-05 In progress The code compiles and runs, but needs to be put in a grid/CernVM-FS-friendly format.
VOI-GAL-004 Create the GalDyn CernVM-FS repository TW, CC 2015-05-05 Closed 2015-05-05 New CernVM-FS repository galdyn.egi.eu has been created on the RAL Stratum-1 for the GalDyn VO.


LIGO

PoC: Catalin Condurache? (CC)

LOFAR

PoC: George Ryall (GR)

LSST

PoC: Alessandra Forti (AF) Other people: Joe Zuntz, Andy Washbrook (AW), Ewan McMahon (EM), Steve Jones (SJ), Catalin Condurache (CC), Daniela Bauer (DB), Marcus Ebert (ME)

Action ID Action description Owner Target date Status Date closed Notes
VOI-LSST-001 Ganga direct job submission using Northgrid AF, JZ 2015-01-31 Closed 2015-12-11 Do direct job submission testing using northgrid infrastructure and ganga
VOI-LSST-002 Get European users on the LSST VOMS server at FNAL AF, JZ 2015-02-28 Closed 2015-12-11
VOI-LSST-003 Enable LSST at sites AF, AW, EM, SJ 2015-06-30 Closed 2015-12-11 Do direct job submission testing
VOI-LSST-004 Find which LSST CVMFS stratum0 is usable by us AF 2015-08-10 Closed 2015-12-11 3 instances, in France, OSG and FNAL. Chosen FNAL
VOI-LSST-005 Get the repository at FNAL and replicated at RAL AF, JZ, CC 2015-08-25 Closed 2015-12-11 Repository automatically mounted at EGI sites as part of OSG EGI agreement, but was not replicated on any EGI stratum1. https://ggus.eu/index.php?mode=ticket_info&ticket_id=115335


VOI-LSST-006 Run jobs using LSST CVMFS using direct job submission and ganga JZ 2015-09-30 Closed 2015-12-11 Joe uploaded the software and used it to run jobs using northgrid
VOI-LSST-007 Enable LSST on Dirac AF, DB, AW, EM, SJ 2015-09-30 Closed 2015-12-11 Got the Dirac pilot DN assigned to the pilot role on VOMS, enabled the VO on Dirac, enabled pilot at sites, tested submission and fixed misconfigured sites. JIRA https://its.cern.ch/jira/browse/GRIDPP-22

https://ggus.eu/index.php?mode=ticket_info&ticket_id=117585
https://ggus.eu/index.php?mode=ticket_info&ticket_id=117586

VOI-LSST-008 Test Ganga Dirac setup AF In progress 2015-12-11 https://its.cern.ch/jira/browse/GRIDPP-22 https://github.com/ganga-devs/ganga/issues/45


VOI-LSST-009 voms-proxy-init EMI-3 not working AF, DB In progress 2015-12-11 There is a ticket open. https://ggus.eu/index.php?mode=ticket_info&ticket_id=117587 Last action is on FNAL to upgrade to the latest VOMS version available in OSG
VOI-LSST-010 Update the Operations portal with correct VOMS info AF In progress 2015-12-11 Helene Cordier not a manager anymore. LSST US managers looking into it, problems with certificates though as they haven't updated the card in a long time.
VOI-LSST-011 Long lived proxies AF In progress 2015-12-11 Understand how LHC experiments do it, understand how dirac does it, test jobs longer than a day with dirac, talk to FNAL about longer proxies. Ticket with FNAL RITM0302478 need authentication.
VOI-LSST-012 Check with NERSC how to use gridftp, authentication and authorisation mechanisms JZ, ME, AF In progress 2015-12-11 Some data are at NERSC which seem to support gridftp transfers. Current method used by Joe to copy data to the UI with scp and then gfal-copy to the storage is slow and painful.
VOI-LSST-013 Test gridtp transfers with NERSC JZ, ME Open 2015-12-11 Once VOI-LSST-012 is settled. Proceed to test the transfers to a grid storage and if all goes well transfer all the data needed for an analysis. In the meantime joe will continue with the slow method.

LZ

PoC: David Colling (DC)

PRaVDA

PoC: Mark Slater/ Matt Williams (MS/MW)

UKQCD

PoC: Jeremy Coles (JC)