Example Build of an ARC/Condor Cluster

From GridPP Wiki
Jump to: navigation, search

Introduction

A multi-core job is one which needs to use more than one processor on a node. Until recently, multi-core jobs have not been used on the grid infrastructure. This has all changed because Atlas and other large users have now asked sites to enable multi-core on their clusters.

Unfortunately, it is not just a simple task of setting some parameter on the head node and sitting back while jobs arrive. Different grid system have varying levels of support for multi-core, ranging from non-existent to virtually full support.

This report discusses the multi-core configuration at Liverpool. We decided to build a test cluster using one of the most capable batch systems currently available, called HTCondor (or condor for short). We also decided to fron the system with an ARC/Condor CE.


Infrastructure/Fabric

The multicore test cluster consists of an SL6 headnode to run the ARC CE and the Condor batch system. The headnode has a dedicated set of 11 workernodes of various types, providing a total of 96 single threads of execution.

Head Node

The headnode is a virtual system running on KVM.

Head node hardware
Host Name CPUs RAM Disk Space


hepgrid2.ph.liv.ac.uk 8 2 gig 35 gig