RAL Tier1 weekly Operations Grid 20130429

From GridPP Wiki
Revision as of 13:33, 29 April 2013 by Orlin alexandrov (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Andrew

  • Last week:
    • Completed & submitted EMI-3 UI change control
    • SLURM/HTCondor testing on 2007 worker nodes
    • Enmr changes to batch system
    • Updated FTS3
    • CMS disk/tape separation
    • CMS HLT cloud
    • CMS processing
  • Coming week:
    • Batch system testing
    • EMI-3 CREAM CE testing with SLURM/HTCondor
    • CMS HLT cloud
    • CMS processing

Catalin

  • Last week
  • This week

Ian

  • Last week:
    • APRs
    • cvmfs investiogations
    • CHEP planning meeting
    • SL6 WN review
  • Coming week:
    • APRs
    • Reviewing CHEP abstracts
    • cvmfs troubleshooting
    • SL6 WN review
    • StratusLab 2.0 template review

James

  • Last Week
  • This Week

Orlin

  • Last Week
  • This Week
    • Test WNs with the new errata & SL 6.4
    • Test & Resolve ongoing issues with ssh-keys on WNs
    • Test & Install EMI-3 CREAMCE for the Staged Rollout
    • Check automated way of adding VOs with Quattor & include it in the documentation
    • Create secure VM images for StartusLab with SL 6.4 & SL 5.9

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary OnCall: IAn (Mon-Sun)

Absences

Catalin - Mon-Tues (A/L)