RAL Tier1 weekly operations Grid 20120130

From GridPP Wiki
Revision as of 14:25, 30 January 2012 by Catalin condurache (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)
Upgrade to SL5 EMI WMS lcgwms03 30/01/2012 07/02/2012 non-LHC

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Alastair

Andrew

  • Worked on some issues with EMI FTS 2.2.8 (mon messages, SE/site cache) [Done]
  • Change control for EMI FTS 2.2.8 [Ongoing]
  • Updates to MyProxy/batch change control documents; additional testing etc [Done]
  • Helped prepare presentation for storage TEG [Done]
  • Errata upgrades [Done]
  • CMS learning [Ongoing]

Catalin

  • attended Alice Tier1/2 Workshop, KIT [done]
  • lcgwms03 draining followed by SL5 EMI WMS install [ongoing]
  • lcgvm-lb01, lcglb02 - gLite to EMI upgrade

Orlin

VO Reports

ALICE

  • Tier 1/2 Workshop, 24-26 Jan, KIT
    • Good operations within UK
    • Lack of resources (disk) not only in UK
    • Will make formal request for more disk allocation at RAL Tier1

ATLAS

CMS

  • Ongoing MC processing
  • Ongoing testing of EMI FTS 2.2.8 using incoming PhEDEx debug transfers

LHCb

OnCall/AoD Cover

OnCall Rota

  • Grid OnCall: Catalin