Operations Report 10/01/2011
From GridPP Wiki
Revision as of 15:51, 10 January 2011 by Carmine cioffi (Talk | contribs)
Contents
Summary of Previous Week
- Oracle backup testing system migrated to the new HW(Orisa)
- RALTAGs: today size 1.8 TB
- CASTOR: Upgraded Preprod SRM to 2.8.6
Operational Issues and Incidents
- 01/01/2011 - Power issue affected 1 Disk Array for 3D/LFC/FTS
Plans for Week(s) Ahead
- ALL: Developing new backup validation script
- ALL: Upgrade ATLAS 3D (OGMA) to 10.2.0.5 (canceled)
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|---|---|---|---|
Development Priorities
Requirements and Blocking Issues
- Waiting for CASTOR hardware installation
OnCall
- Carmine
Absences
- Keir - Till Thursday
- Eter