RAL Tier1 Production Team Report for 17th May 2010.
AoD This Week
Mon & Tues: TijuWed: Gareth Thu & Fri: Tiju
Last Week (10 May - 17 May)
- Gareth: AoD (<1 day), APRs, HEP SYSMAN planning, GGUS Alarm ticket meeting, prepared abstract for CHEP.
- John: AoD (4 days), APR, initiation into blessing Castor disk servers.
- Tiju: APR, Effect of Nagios replacement for SAM tests, dashboard updates, Nagios config changes(nagger)
Changes to Operating procedures
- As reported last week: Use of fortnightly Tier1 co-ordination meeting to schedule Tier1s during technical stops. use this meeting as preparation.
Declared Outages in GOC DB
- Castor Oracle database Sub-request clean-up: CMS - Monday 17th May
- Castor Oracle database Sub-request clean-up: Atlas - Wednesday 19th May
- Castor Oracle database Sub-request clean-up: LHCb - Tuesday 25th May
- CE07 - re-config for glexec - Monday 17th May.
- At Risk for UPS test - Tuesday 1st June.
Technical Stops
- ===May 31 - June 2:===
- Tuesday 1st June: UPS test (site At Risk)
- Wednesday 2nd June: Oracle quarterly patching (TBC)
- ===June 28-30===
- Monday 28th June - Transformer checks (Site At Risk at end of afternoon)- TX2
- Monday 28th June - Transformer checks (Site At Risk for day) - TX3 or 4
- ===July 26-28===
- Transformer checks. (2 days - TX1 & TX3 or 4)
Advanced Warning
- Fabric:
- Double the network link to the tape robot stack (stack 12), postponed from the last TS. (Requires Castor stop).
- Swap out the older of the pair of SAN switches in the Tier1 Oracle databases for its new replacement. (Requires FTS, LFC, 3D stop).
- Multipath mods to stop errors. (Not yet sure of effect).
- Microcode update for tape robot
- Swap Solaris tape controllers (for robot) over (?)
- New Atlas software server.
- New kernels and glibc updates on non-castor Oracle RAC nodes. (Done for LUGH). (Added after meeting.)
- Database:
- Quarterly Oracle patching
- Grid Services:
- CEs will be configured for glexec in rotation.
- Stop SL4 batch service (August)
- Add Quatorised BDII to Top-BDII set. (Below threshold for technical stop).
- Update to FTS 2.2.4. (Below threshold for technical stop).
- glite 3.2 WMS (Below threshold for technical stop).
- Castor:
- Possible SRM update
- Networks:
- Commissioning OPN link