Difference between revisions of "RAL T1 weekly ops Fabric 20110627"
From GridPP Wiki
(No difference)
|
Latest revision as of 14:23, 18 July 2011
Contents
Developments
- All:
- Away Day
- Tim:
- James A:
- Cheney
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Decommissioning old disk servers/batch systems.
- gdss256 read-only file system.
- Viglen 2007 all disk servers firmware update. (ongoing)
- Update firmware on Jetstor systems.(ongoing) Updated on three.
- Try to send a faulty drive from SL08 batch to Areca.
- Running 'verify fix' on SL09 disk servers with bad blocks on drives.
- Re-create and configure raid array of 5-7 CV 05 disk servers after decommissioning. (Done)
- Quattor02 swap drive in port 1 with R410.
- Martin:
- Database testing for DB team
- Disk ITT
- Common Ops project
- Ian:
- EqualLogic evaluation
- Quattor template clean up w. James
- Meeting and planning with Nuffield bursary student
- Preparation for Erasmus student
- Refactoring CVMFS config in Quattor
- Generated June errata templates
- Setup on Hyper-V VMM with Dave Drummond
Operational Issues and Incidents
Index | Description | Start | End | Severity | Affected VO(s) |
---|
Summary of plans for week ahead
Scheduled and Cancelled Down Times
Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB
Component | Description | Start | End | Affected VO(s) | Type |
---|
Development priorities
- All
- Tim:
- Cheney
- James A:
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Hardware failure metrics continue.
- Continue SL08 testing.
- Continuous decommissioning old disk servers/batch systems.(R 27)
- Continue Labelling racks and systems in UPS and HPD room.
- Martin:
- Prep for HEPSysMan
- Disk ITT
- DB testing work as needed
- Ian:
- Finalise COp WP3 report
- ?Take delivery and start tests on new EqualLogic array
- Hepsysman attend and give talk(s)
- Set up local storage hypervisor(s)
Absences
Fabric On-Call
- Ian Monday-Tuesday; Kash Wednesday - Sunday