Operational Issues
Description | Start | End | Affected VO(s) | Severity | Status |
---|---|---|---|---|---|
SW RAID problems on lcgwms03 (non-LHC) | Fri 22-Oct-2010 | non-LHC | Fabric aware of the problem |
Downtimes
Description | Hosts | Type | Start | End | Affected VO(s) |
---|
Blocking Issues
Description | Requested Date | Required By Date | Priority | Status |
---|---|---|---|---|
Developments/Plans
Highlights for Tier-1 Ops Meeting
Highlights for Tier-1 VO Liaison Meeting
Detailed Individual Reports
Alastair
- Working on ATLAS software server, testing CVMFS
- 825 test jobs have been run.
- lcg0805 has been setup for production style testing, need to add queue into ATLAS system.
- Production tasks submitted.
- Writing script to graph transfer times for FTS transfers [on hold]
- Investigating FTS glite-3.2 transfer problems. [ongoing]
- Finishing draining of gdss81 for removal from production.
- Working on Hammer cloud test of castor 2.1.9 [ongoing]
Andrew
- Capacity planning system project [Ongoing]
- CMS data ops
- WMAgent testing - ran backfill at all Tier-1s except FNAL [Done]
Catalin
- deploy lcglb03 (glite3.2 LB) in production [ongoing]
- work on glite-LB quattor profile [done]
- investigate (x)ROOT(d) [ongoing]
Derek
- Integration of quattor changes made for CREAM CE into production
- Debugging lcgce03 instability
Matt
- Testing PBS monitoring tools (pbswebmon, JobMon) [New]
- Further testing of Quattorised gLite3.2 FTS FEs. [Ongoing]
- Quattorisation of MyProxy nodes (Change Control approved). [Ongoing]
- Test FTS SRM/GridFTP ratio configuration.
- Disk Deployment meeting. [Done]
- Quattor FTM profiles. [Done]
Richard
- Scheduling update to RAL site-level BDIIs [Ongoing]
- Developing a set of Quattor templates for an ARGUS server [Ongoing]
- Developing a "pseudo-update" to apply a gLite update to BDIIs
- Wrote a CGI script for logging hardware requests from G/S team in the Fabric queue in RT [Ongoing]
- Working on the "team status page" being developed as an action from team awayday [Ongoing]
- Reviewing G/S process documentation [Ongoing]
- CASTOR items:
VO Reports
ALICE
ATLAS
CMS
LHCb
OnCall/AoD Cover
- Primary OnCall:
- Grid OnCall: Catalin (Mon-Thu)