GP to present the WAN tuning effect on transfer rates | GP to present the WAN tuning effect on transfer rates | ||
+ | |||
+ | Test DB upgrade to CASTOR 2.1.15 at the end of next week | ||
Get dedlines from Fabric team for OCF/CV14 hand over to CASTOR | Get dedlines from Fabric team for OCF/CV14 hand over to CASTOR | ||
Line 64: | Line 66: | ||
Talk to AL about the issue with unrouted files to tape in CMS | Talk to AL about the issue with unrouted files to tape in CMS | ||
− | Check if there is a nagios test that checks for facilities tape drives being down | + | Check if there is a nagios test that checks for facilities tape drives being down |
== Staffing == | == Staffing == |
Revision as of 10:00, 31 October 2016
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Castor 2.1.15 2. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
gdss699 failed and had to be removed from production
gdss896 had to be removed from production for hardware testing
Operation news
Kernel patch applied on preprod headnodes and tests run cleanly
Kernel patch applied on gdss618(V11) and gdss674(CV11) and tests run cleanly
Kernel patch applied on gdss893(Dell2015) and tests run cleanly
Will do the same for the other ds generations (V12, V13, CV14)
Long-term projects
Progress on how to combine disk pools on CASTOR 2.1.15
CASTOR 2.1.14 passed all tests on preprod; further testing cannot take place because of the security patching
Test merging of disk pools on vcert
vcert should stay on CASTOR 2.1.14 for the time being
Actions
GP to present the WAN tuning effect on transfer rates
Test DB upgrade to CASTOR 2.1.15 at the end of next week
Get dedlines from Fabric team for OCF/CV14 hand over to CASTOR
Talk to RH about repartioning od of OCF14/CV14 servers
RA/GP to deploy the former Ceph OCF14 servers into aliceDisk (see RAL disk server deployment plan by Alastair)
Talk to AL about the issue with unrouted files to tape in CMS
Check if there is a nagios test that checks for facilities tape drives being down
Staffing
RA on call next week
AS on course