This page is for monitoring the progress of new(ish) GridPP [[Virtual Organisation|VOs]]. | This page is for monitoring the progress of new(ish) GridPP [[Virtual Organisation|VOs]]. | ||
− | * PoC - Point of | + | * PoC - Point of Contac |
==All new VOs== | ==All new VOs== |
Revision as of 10:54, 24 May 2016
This page is for monitoring the progress of new(ish) GridPP VOs.
- PoC - Point of Contac
Contents
All new VOs
These tasks will need to be completed for all
Action ID | Action description | Owner | Target date | Status | Date closed | Notes |
---|---|---|---|---|---|---|
VOI-GEN-001 | Deploy test software to RVO CernVM-FS repositories. | Duncan, Daniela, Gareth, Alessandra, Ewan | 2015-05-26 | Open | N/A | New users in the Regional VOs will need to run test jobs using software in the RVO CernVM-FS repositories. This test software will need to be uploaded by the RVO admins. Instructions for doing this can be found here. Tested for vo.londongrid.ac.uk (--Daniela) |
VOI-GEN-002 | Write up the VO registration procedure | Tom | 2015-05-31 | In progress | N/A | Guide started here - comments and feedback appreciated. |
DEAP3600
PoC: Jeremy Coles (JC)
- Update requested February 2016.
- No response as of 21st March 2016
- 24th May: Awaiting main local user at RHUL to begin activities.
vo.DiRAC.ac.uk
PoC: Jens Jensen, Brian Davies
- 03/05/16: Durham have now moved 940TB in 6 months. Expect ~2.5PB in total from Durham.
Action ID | Action description | Owner | Target date | Status | Date closed | Notes |
---|---|---|---|---|---|---|
VOI-DIRAC-001 | Set up VO in GridPP | JJ | 2015-04-30 | Closed | ||
VOI-DIRAC-002 | Register DiRAC with EGI | JJ | 2015-05-31 | Closed | [1] | |
VOI-DIRAC-003 | Write up DiRAC site setup document | LH | 2015-08-31 | Closed | Version 1.3 circulated to DIRAC-USERS | |
VOI-DIRAC-004 | Re-evaluate data packaging method | JJ | 2015-11-30 | Closed | 2016-01-31 | Lydia re-engineered the packaging, focusing on tar, after extensive testing with GridPP |
VOI-DIRAC-005 | Restart transfers with new method (VOI-DIRAC-004) | LH | 2015-12-10 | Closed | 2016-01-31 | Successful large data transfer over new year 2016, http://gridpp-storage.blogspot.co.uk/2016/01/update-on-vodiracacuk-data-mopvement.html slight error in script (leading to some failures) being updated |
VOI-DIRAC-006 | Get Leicester ready for transfer | JJ | 2015-11-30 | In Progress | Currently (March '16) debugging script | |
VOI-DIRAC-007 | Request or requirement for ACL between sites. | BD | 2015-11-30 | In Progress | Awaiting to here if it is a request or a requirement to keep data access separate between DIRAC sites. If needed new voms roles and castor setup may need to be enabled.
03/05/16 update: VO does indeed need separation. requires voms-proxy usage on transfers and groups to be enacted in voms/. Also needs setting namespace configuratiuon to separate different users. 23/05/16 Now plan ( if acceptable to VO) to explicitly amend gridmapfile to assign specific DNs associated with each site to their own uid within castor. | |
VOI-DIRAC-008 | Identify next (third) DiRAC site | LH | 2016-03-22 | Open |
|
EUCLID
PoC: Andrew Lahiff (AL)
Action ID | Action description | Owner | Target date | Status | Date closed | Notes |
---|---|---|---|---|---|---|
VOI-EUC-001 | Enable /cvmfs/euclid.in2p3.fr on RAL worker nodes | AL | 2016-02-24 | Open | [2016-04-01] Now works on a test worker node. Unable to deploy changes to all worker nodes due to an issue with Aquilon. [2016-04-13] No longer have access to Edinburgh stratum 1. [2016-05-24] No change, but seems to be not needed yet. | |
VOI-EUC-002 | Setup /cvmfs/euclid-uk.egi.eu repository | CC | 2016-02-26 | Open | [2016-05-25] Not needed yet. | |
VOI-EUC-003 | Setup accounts on RAL UIs | AL | 2016-02-26 | Closed | 2016-05-05 | All users who requested accounts have access to our UIs. |
VOI-EUC-004 | Run jobs at RAL | AL | 2016-02-26 | Closed | 2016-05-10 | Tom Kitching has successfully run jobs.
|
GalDyn
- PoC: Tom Whyntie (TW)
- UCLan: Adam Clarke (AC)
Action ID | Action description | Owner | Target date | Status | Date closed | Notes |
---|---|---|---|---|---|---|
VOI-GAL-001 | Assist GalDyn users with CernVM creation and testing. | TW | 2015-02-18 | Closed | 2015-02-18 | GalDyn users have successfully instantiated CernVMs for accessing the grid. |
VOI-GAL-002 | Assist GalDyn users with running test jobs on the Imperial DIRAC instance. | TW | 2015-02-23 | Closed | 2015-02-23 | GalDyn users have successfully run test jobs on the Imperial DIRAC instance via a GridPP CernVM. |
VOI-GAL-003 | Assist GalDyn users with compiling user software on the CernVM. | TW | 2015-03-08 | Closed | 1016-02-15 | The code compiles and runs, but needs to be put in a grid/CernVM-FS-friendly format. |
VOI-GAL-004 | Create the GalDyn CernVM-FS repository | TW, CC | 2015-05-05 | Closed | 2015-05-05 | New CernVM-FS repository galdyn.egi.eu has been created on the RAL Stratum-1 for the GalDyn VO. |
VOI-GAL-005 | (Re)new grid certificate for AC | AC | 2015-02-22 | Closed | 2015-03-15 | UK CA managed to renew the old certificate. Work on hold - user preparing for PhD viva! |
LIGO
PoC: Catalin Condurache (CC)
LIGO: Paul Hopkins (PH)
Other people: Andrew Lahiff (AL)
Action ID | Action description | Owner | Target date | Status | Date closed | Notes |
---|---|---|---|---|---|---|
VOI-LIGO-001 | Create the LIGO CernVM-FS repository | CC | 2014-12-01 | Closed | 2015-02-15 | New CernVM-FS repository ligo.egi.eu has been created on the RAL Stratum-1 for the LIGO VO. |
VOI-LIGO-002 | Assist LIGO users with using Condor + nordugrid to access ARC-CE@RAL. | AL, CC | 2015-12 | Closed | 2016-02-12 | Test jobs submitted from LIGO Condor instance to ARC-CE service at RAL were successful. |
VOI-LIGO-003 | Plan to run proper analyses jobs using scientists involvement | PH, CC | 2016-02-12 | Open | [2016-05-24]Still chasing scientists to run analyses jobs. Some promises. | |
VOI-LIGO-004 | Get file storage working via the GridPP CernVM. | PH, CC | 2016-02-24 | Closed | 2016-03-08 | PH managed to get file transfers working with the GridPP CernVM using bridged networking and getting the VM registered on the university network. |
LOFAR
PoC: George Ryall (GR), from April 2016 - Alex Dibbo (AD)
21/03/16: LOFAR should be in a posetion to perform an analysis run on a limited number of VMs with real data in the next few weeks. (GR)
LSST
PoC: Alessandra Forti (AF)
Other people: Joe Zuntz (JZ), Andy Washbrook (AW), Ewan McMahon (EM), Steve Jones (SJ), Catalin Condurache (CC), Daniela Bauer (DB), Marcus Ebert (ME), Kashif Mohammad (KM), Dan Traynor (DT), Andrew Lahiff (AL), Gareth Roy (GR)
Action ID | Action description | Owner | Target date | Status | Last update | Notes |
---|---|---|---|---|---|---|
VOI-LSST-001 | Ganga direct job submission using Northgrid | AF, JZ | 2015-01-31 | Closed | 2015-12-11 | Do direct job submission testing using northgrid infrastructure and ganga |
VOI-LSST-002 | Get European users on the LSST VOMS server at FNAL | AF, JZ | 2015-02-28 | Closed | 2015-12-11 | |
VOI-LSST-003 | Enable LSST at sites | AF, AW, EM, SJ | 2015-06-30 | Closed | 2015-12-11 | Get the correct configuration. Sites get the info from Operations portal which has some obsolete information about VOMS. We should ask to fix it. |
VOI-LSST-004 | Find which LSST CVMFS stratum0 is usable by us | AF | 2015-08-10 | Closed | 2015-12-11 | 3 instances, in France, OSG and FNAL. Chosen FNAL |
VOI-LSST-005 | Get the repository at FNAL and replicated at RAL | AF, CC | 2015-08-25 | Closed | 2015-12-11 | Repository automatically mounted at EGI sites as part of OSG EGI agreement, but was not replicated on any EGI stratum1. https://ggus.eu/index.php?mode=ticket_info&ticket_id=115335
|
VOI-LSST-006 | Run jobs using LSST CVMFS using direct job submission and ganga | JZ | 2015-09-30 | Closed | 2015-12-11 | Joe uploaded the software and used it to run jobs with direct job submission using lsst VO |
VOI-LSST-007 | Enable LSST on Dirac | AF, DB, AW, EM, SJ | 2015-09-30 | Closed | 2015-12-11 | Got the Dirac pilot DN assigned to the pilot role on VOMS, enabled the VO on Dirac, enabled pilot at sites, tested submission and fixed misconfigured sites. JIRA 1) https://its.cern.ch/jira/browse/GRIDPP-22 2) https://ggus.eu/index.php?mode=ticket_info&ticket_id=117585 3) https://ggus.eu/index.php?mode=ticket_info&ticket_id=117586 |
VOI-LSST-008 | Test Ganga Dirac setup | AF | Closed | 2015-12-11 | 1) https://its.cern.ch/jira/browse/GRIDPP-22 2) https://github.com/ganga-devs/ganga/issues/45 3) https://its.cern.ch/jira/browse/GRIDPP-29 since gfal_util doesn't work instead of debugging it I've started to look into the dirac file catalogue clients, which have better compatiblity chances on top of having the file catalogue. See VO-LSST-014 | |
VOI-LSST-009 | voms-proxy-init EMI-3 not working | AF, DB | Closed | 2015-04-05 | FNAL upgraded the VOMS to a EMI-3 clients compatible version. Ticket https://ggus.eu/index.php?mode=ticket_info&ticket_id=117587 closed. Ticket for VOMS developers: https://ggus.eu/index.php?mode=ticket_info&ticket_id=114044 closed. | |
VOI-LSST-010 | Update the Operations portal with correct VOMS info | AF | Closed | 2015-01-05 | LSST US managers added voms1 and voms2 to the ops portal. http://operations-portal.egi.eu/vo/view/voname/lsst | |
VOI-LSST-011 | Long lived proxies | AF | Closed | 2016-04-05 | Ticket with FNAL RITM0302478 was closed after we moved to dirac and we could run jobs longer than 24h with the renwal mechanism. | |
VOI-LSST-012 | Check with NERSC how to use gridftp, authentication and authorisation mechanisms | JZ, ME, AF | Closed | 2015-01-11 | NERSC account required to do the transfers. Marcus has now an account. | |
VOI-LSST-013 | Test gridtp transfers with NERSC | JZ, ME | Closed | 2015-01-25 | Data copied from NERSC with globus-url-copy | |
VOI-LSST-014 | Investigate Dirac file catalogue usage | AF, JZ | Closed | 2016-02-22 | https://its.cern.ch/jira/browse/GRIDPP-30 More info in https://groups.google.com/forum/#!topic/diracgrid-forum/sclcLrQBPFY. Files transferred to Manchester with correct directory naming scheme is working. See VOI-LSST-015. | |
VOI-LSST-015 | Spread the LSST data on different sites | AF | In progress | 2016-02-09 | https://its.cern.ch/jira/browse/GRIDPP-31 All data on a test SE instance for 20,000 foreseen jobs. Currently only 3 SEs (Ed, Man, Liv) enabled and mostly on older hardware. Replication will also allow to solve the registration problem by copying to a subdirectory <storage_path>/lsst/lsst. First leg of the distribution done. All files copied to Manchester. | |
VOI-LSST-016 | Move to use gridpp VO because GridPP management requested to run an analysis with any "means possible" | AF, JZ, RF, DB, KM | Closed | 2016-04-05 | We went back to LSST and dirac | |
VOI-LSST-17 | Edinburgh LSST data access | ME | Closed | 2016-02-08 | The local time out problem with the data access was solved and data is available now for jobs and transfers without timing out | |
VOI-LSST-18 | Adapt Joe's ganga and bash scripts to submit to dirac and use the dirac file catalog clients instead of gfal_utils. | AF | Closed | 2016-04-05 | AF adapted Joe's scripts and have been running most of the first part of data. The new data will be processed with a completely revised ganga script after the involvement of ganga developers. | |
VOI-LSST-19 | Run a larger sample of jobs (effectively 2500) | AF, JZ | In progress | 2016-05-24 | https://its.cern.ch/jira/browse/GRIDPP-33 run another batch of 5000 jobs but mostly had a timeout problem when downloading the input. It is not clear if the problem is from the DFC or the storages. We hope the new ganga client can get better error codes and solve this more easily. Ticket for this https://github.com/ganga-devs/ganga/issues/343. | |
VOI-LSST-20 | Implement JZ workflow in plain dirac cli | ME | In Progress | 2016-03-01 | dirac cli is implemented in scripts and usable for job submission and getting OutputSandbox using a given input file list, a test running over 1000 input files was successful, needs to be tested for overall analysis usage by JZ | |
VOI-LSST-21 | Copy new data from NERSC to one of the storage elements and register them in the DFC | JZ, AF | Closed | 2016-04-30 | Data have been copied to Liverpoool and registered. | |
VOI-LSST-22 | Test gfal and dirac utils on NERSC | ME, JZ | Closed | 2016-04-29 | Dirac UI can be installed in the user's $HOME on the data transfer machines at NERSC (RH6 OS installed) and then directly be used to transfer the data and register the files in the catalogue in a single step. | |
VOI-LSST-23 | Enable LSST at RAL, QMUL, Glasgow | AF, DT, AL, GR | In progress | 2016-04-05 | Tickets opened for sites: https://ggus.eu/?mode=ticket_info&ticket_id=120352 https://ggus.eu/?mode=ticket_info&ticket_id=120351 https://ggus.eu/?mode=ticket_info&ticket_id=120350 |
LZ
PoC: David Colling (DC)
All Monte Carlo for the TDR was generated using Dirac and shell scripts. Only a few extra TDR jobs being run to fix holes. After TDR next step is to have full gaudi simulations.
LZ has been successfully running large scale simulations at Imperial.
Currently the following CEs are enabled for LZ, but anything apart from Imperial needs testing (and Sheffield needs pilot roles):
Imperial:
ceprod05.grid.hep.ph.ic.ac.uk:8443/cream-sge-grid.q,
ceprod06.grid.hep.ph.ic.ac.uk:8443/cream-sge-grid.q,
ceprod07.grid.hep.ph.ic.ac.uk:8443/cream-sge-grid.q,
ceprod08.grid.hep.ph.ic.ac.uk:8443/cream-sge-grid.q
Brunel: dc2-grid-21.brunel.ac.uk:2811/nordugrid-Condor-default
RALPPD: heplnv146.pp.rl.ac.uk:2811/nordugrid-Condor-grid,
heplnv147.pp.rl.ac.uk:2811/nordugrid-Condor-grid
Sheffield: lcgce1.shef.ac.uk:8443/cream-pbs-lz
PRaVDA
- PoC: Mark Slater/Matt Williams (MS/MW)
- End User: Tony Price (TP)
- Update requested 3rd Feb., 19th Feb. 2016 by TW. TP replied 2016-03-21 - they have been busy building the actual device!
- TP in the process of changing roles. Need to finalise the new end user.
Action ID | Action description | Owner | Target date | Status | Date closed | Notes |
---|---|---|---|---|---|---|
VOI-PRA-001 | Get PRaVDA up and running with DIRAC and Ganga. | MS/MW | 2015-10-01 | Closed | 2016-03-21 | TP has successfully got simulations running using DIRAC and Ganga. |
VOI-PRA-002 | Issues with DIRAC, Ganga and LFN names when copying data back. | MS/MW | 2015-03-21 | In progress | MS/MW assisting on the Ganga side. | |
VOI-PRA-003 | TP changing roles. Need to make contact with new end user. | MS | 2016-05-23 | In progress |
SNO+
- PoC: Pete Gronbech (PG)
- SNO+: Matthew Mottram (MM)
Action ID | Action description | Owner | Target date | Status | Last update | Notes |
---|---|---|---|---|---|---|
VOI-SNO+-001 | Check on progress via GridPP-Support list. | PG | 2016-02-17 | Closed | 2016-03-10 | See VOI-SNO+-003 - success, closing this for now. |
VOI-SNO+-002 | MM to join GridPP Storage meeting | PG | 2016-02-24 | Closed | 2016-02-24 | MM joined the meeting to discuss requirements and various options. See minutes. |
VOI-SNO+-003 | MM to transfer files out of the SNO+ cavern via an FTP server. | PG | 2016-02-17 | Closed | 2016-03-10 | Success after fantastic support/discussion on the GRIDPP-SUPPORT mailing list. |
VOI-SNO+-004 | Check on progress via GridPP-Support list (16thMay). | PG | 2016-05-31 | On-going | 2016-05-23 | Help requested for setting up Condor submission tools. Dialogue started on the mailing list. |
SuperNEMO
- PoC: Pete Gronbech (PG)
- SuperNEMO: Ben Morgan (BM)
Action ID | Action description | Owner | Target date | Status | Last update | Notes |
---|---|---|---|---|---|---|
VOI-SuperNEMO-001 | Check on progress via GridPP-Support list | PG | 2016-02-17 | On going | 2016-02-17 | |
VOI-SuperNEMO-002 | Resurrect the SuperNEMO VO. | PG | 2016-02-17 | Open | 2016-03-22 | |
VOI-SuperNEMO-003 | Establish the feasibility of using the Ganga interface to the Atlas Metadata Interface (AMI) | PG, MS | 2016-02-24 | On going | 2016-03-22 | |
VOI-SuperNEMO-004 | PG asked if more help required (10th April) | PG | 2016-05-31 | On going | 2016-05-23 | UK SuperNEMO are having a meeting in May so will get back with an update then. |
UKQCD
PoC: Jeremy Coles (JC)
- Update requested February 2016.
- Update 21st March: "Hoping to do more with the gridpp resources".
- Preliminary result in conference proceedings - "Investigating Some Technical Improvements to Glueball Calculations" e-Print: arXiv:1511.09303.
- 24th May: Will try and leverage some of the international lattice data grid stuff. Nothing immediate planned.