Difference between revisions of "Tier1 Operations Report 2015-07-08"
From GridPP Wiki
(→) |
(→) |
||
(2 intermediate revisions by one user not shown) | |||
Line 9: | Line 9: | ||
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 1st to 8th July 2015. | | style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 1st to 8th July 2015. | ||
|} | |} | ||
− | * | + | * A couple of issues that have emerged as part of the testing of the new worker node configuration have been identified and solved. One of these was seen by LHCb (and reported last week), the other was seen by Atlas. |
− | + | * A problem transferring some files from FNAL to RAL (reported last week) has been resolved by FNAL. | |
− | * A problem transferring some files from FNAL to | + | * The 'OPS' SUM test has been failing at RAL, as for many other sites, owing to a problem with the test itself. |
− | * | + | |
<!-- ***********End Review of Issues during last week*********** -----> | <!-- ***********End Review of Issues during last week*********** -----> | ||
<!-- *********************************************************** -----> | <!-- *********************************************************** -----> | ||
Line 58: | Line 57: | ||
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made since the last meeting. | | style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made since the last meeting. | ||
|} | |} | ||
− | * A UPS/ | + | * A UPS/Generator load test was made successfully last Wednesday (1st July). |
− | * | + | * A test of using the Castor re-balancer more aggressively was made. However, these showed some internal operational problems and it has been tuned back down again. |
− | The change | + | * The change a database procedure to speeds up file open times within Castor was made to the GEN instance on Wednesday afternoon (1st July). This change has now been rolled out to all Castor instances. |
− | + | ||
<!-- *************End Notable Changes made this last week************** -----> | <!-- *************End Notable Changes made this last week************** -----> | ||
<!-- ****************************************************************** -----> | <!-- ****************************************************************** -----> |
Latest revision as of 09:31, 8 July 2015
RAL Tier1 Operations Report for 8th July 2015
Review of Issues during the week 1st to 8th July 2015. |
- A couple of issues that have emerged as part of the testing of the new worker node configuration have been identified and solved. One of these was seen by LHCb (and reported last week), the other was seen by Atlas.
- A problem transferring some files from FNAL to RAL (reported last week) has been resolved by FNAL.
- The 'OPS' SUM test has been failing at RAL, as for many other sites, owing to a problem with the test itself.
Resolved Disk Server Issues |
- None
Current operational status and issues |
- We are running with a single router connecting the Tier1 network to the site network, rather than a resilient pair.
- The post mortem review of the network incident on the 8th April is being finalised.
- The intermittent, low-level, load-related packet loss over the OPN to CERN is still being tracked.
Ongoing Disk Server Issues |
- None
Notable Changes made since the last meeting. |
- A UPS/Generator load test was made successfully last Wednesday (1st July).
- A test of using the Castor re-balancer more aggressively was made. However, these showed some internal operational problems and it has been tuned back down again.
- The change a database procedure to speeds up file open times within Castor was made to the GEN instance on Wednesday afternoon (1st July). This change has now been rolled out to all Castor instances.
Declared in the GOC DB |
Service | Scheduled? | Outage/At Risk | Start | End | Duration | Reason |
---|---|---|---|---|---|---|
arc-ce05.gridpp.rl.ac.uk | SCHEDULED | OUTAGE | 10/06/2015 12:00 | 08/07/2015 12:00 | 28 days, | This particular ARC CE will be decommisioned. (Four other ARC CEs remain in production). |
Advanced warning for other interventions |
The following items are being discussed and are still to be formally scheduled and announced. |
- Vendor intervention on Tier1 Router provisionally scheduled for Tuesday 4th August.
Listing by category:
- Databases:
- Switch LFC/3D to new Database Infrastructure.
- Update to Oracle 11.2.0.4. This will affect all services that use Oracle databases: Castor, Atlas Frontier (LFC done)
- Castor:
- Update SRMs to new version (includes updating to SL6).
- Update the Oracle databses behind Castor to version 11.2.0.4. Will require some downtimes (See above)
- Update disk servers to SL6.
- Update to Castor version 2.1.15.
- Networking:
- Resolve problems with primary Tier1 Router. Need to schedule a roughly half-day outage for the vendor to carry out investigations.
- Enable the RIP protocol for updating routing tables on the Tier1 routers. (Install patch to Router software).
- Increase bandwidth of the link from the Tier1 into the RAL internal site network to 40Gbit.
- Make routing changes to allow the removal of the UKLight Router.
- Cabling/switch changes to the network in the UPS room to improve resilience.
- Fabric
- Firmware updates on remaining EMC disk arrays (Castor, FTS/LFC)
Entries in GOC DB starting since the last report. |
Service | Scheduled? | Outage/At Risk | Start | End | Duration | Reason |
---|---|---|---|---|---|---|
Whole site | SCHEDULED | WARNING | 01/07/2015 10:00 | 01/07/2015 11:30 | 1 hour and 30 minutes | Warning on site during quarterly UPS/Generator load test. |
arc-ce05.gridpp.rl.ac.uk | SCHEDULED | OUTAGE | 10/06/2015 12:00 | 08/07/2015 12:00 | 28 days, | This particular ARC CE will be decommisioned. (Four other ARC CEs remain in production). |
Open GGUS Tickets (Snapshot during morning of meeting) |
GGUS ID | Level | Urgency | State | Creation | Last Update | VO | Subject |
---|---|---|---|---|---|---|---|
114786 | Green | Less Urgent | On Hold | 2015-07-02 | 2015-07-07 | OPS | [Rod Dashboard] Issue detected : egi.eu.lowAvailability-/RAL-LCG2@RAL-LCG2_Availability |
113910 | Green | Less Urgent | Waiting Reply | 2015-05-26 | 2015-06-23 | SNO+ | RAL data staging |
113836 | Yellow | Less Urgent | In Progress | 2015-05-20 | 2015-06-24 | GLUE 1 vs GLUE 2 mismatch in published queues | |
108944 | Red | Less Urgent | In Progress | 2014-10-01 | 2015-06-16 | CMS | AAA access test failing at T1_UK_RAL |
Availability Report |
Key: Atlas HC = Atlas HammerCloud (Queue ANALY_RAL_SL6, Template 508); CMS HC = CMS HammerCloud
Day | OPS | Alice | Atlas | CMS | LHCb | Atlas HC | CMS HC | Comment |
---|---|---|---|---|---|---|---|---|
01/07/15 | 0 | 100 | 100 | 100 | 100 | 100 | 100 | Problem with SAM monitoring of ARC-CEs. |
02/07/15 | 0 | 100 | 100 | 100 | 100 | 100 | 100 | Problem with SAM monitoring of ARC-CEs. |
03/07/15 | 0 | 100 | 100 | 100 | 100 | 90 | 100 | Problem with SAM monitoring of ARC-CEs. |
04/07/15 | 0 | 100 | 100 | 100 | 100 | 80 | 73 | Problem with SAM monitoring of ARC-CEs. |
05/07/15 | 0 | 100 | 100 | 100 | 100 | 87 | n/a | Problem with SAM monitoring of ARC-CEs. |
06/07/15 | 0 | 100 | 100 | 100 | 100 | 98 | 100 | Problem with SAM monitoring of ARC-CEs. |
07/07/15 | 57.9 | 100 | 100 | 96 | 100 | 100 | 100 | CMS:Single SRM Get test failure; OPS: Problem with SAM monitoring of ARC-CEs. |