| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 14th to 21st January 2015. | | style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 14th to 21st January 2015. | ||
|} | |} | ||
− | * | + | * The high load on the LHCb SRMs reported last week continued into this reporting period with intermittent SAM test failures. The problem has been mitigated: The particular LHCb workflow that loaded the SRMs heavily has eased and a third system has been added into the LHCb SRM alias. |
− | + | * Electrical circuit testing in the machine room has continued into this week. Some further problems have been encountered and we have tripped off some (a few tens of) worker nodes. However, no critical services have been affected. | |
− | * Electrical circuit testing | + | |
<!-- ***********End Review of Issues during last week*********** -----> | <!-- ***********End Review of Issues during last week*********** -----> | ||
<!-- *********************************************************** -----> | <!-- *********************************************************** -----> | ||
Line 22: | Line 21: | ||
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Resolved Disk Server Issues | | style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Resolved Disk Server Issues | ||
|} | |} | ||
− | * | + | * None |
<!-- ***********End Resolved Disk Server Issues*********** -----> | <!-- ***********End Resolved Disk Server Issues*********** -----> | ||
<!-- ***************************************************** -----> | <!-- ***************************************************** -----> | ||
Line 34: | Line 33: | ||
|} | |} | ||
* We are running with a single router connecting the Tier1 network to the site network, rather than a resilient pair. | * We are running with a single router connecting the Tier1 network to the site network, rather than a resilient pair. | ||
− | |||
<!-- ***********End Current operational status and issues*********** -----> | <!-- ***********End Current operational status and issues*********** -----> | ||
<!-- *************************************************************** -----> | <!-- *************************************************************** -----> | ||
Line 56: | Line 54: | ||
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made this last week. | | style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made this last week. | ||
|} | |} | ||
− | * | + | * The bulk of the safety checking of the electrical power circuits in the machine room has been completed. The whole task will finish tomorrow, Thursday 22nd January. |
+ | * The problem with xroot access to the Castor GEN instance was fixed during the afternoon of Wednesday 14th Jan. (This problem did not affect ALICE). | ||
+ | * A third SRM system was added to the LHCb alias (sm-lhcb.gridpp.rl.ac.uk) on Thursday 15th Jan. | ||
+ | * The Castor Nameserver headnodes were updated to SL6 on Monday 19th Jan. This operation was transparent to Castor users. | ||
+ | * The migration of all data off T10000A & B media is almost complete. | ||
<!-- *************End Notable Changes made this last week************** -----> | <!-- *************End Notable Changes made this last week************** -----> | ||
<!-- ****************************************************************** -----> | <!-- ****************************************************************** -----> | ||
Line 98: | Line 100: | ||
|} | |} | ||
<!-- ******* still to be formally scheduled and/or announced ******* -----> | <!-- ******* still to be formally scheduled and/or announced ******* -----> | ||
− | * Investigate problems on the primary Tier1 router. | + | * Investigate problems on the primary Tier1 router. We plan to run the primary (failing) router for a few hours tomorrow (Thursday 22nd Jan) in order to trap the problem. If there is a failure it will take a few minutes for a manual switch back to the secondary to be effected. |
+ | * The circuit testing of the remaining (i.e. non-UPS) circuits in the machine room in ongoing and will be completed tomorrow (Thursday 22nd Jan). | ||
+ | * A patch to FTS3 (to version 3.2.31) will be rolled out in the next days. | ||
+ | * OS updates on disk servers (expected in week 26-30 Jan). | ||
+ | * Move of connection for CERN Backup link. | ||
'''Listing by category:''' | '''Listing by category:''' | ||
* Databases: | * Databases: | ||
+ | ** Application of Oracle PSU patches to database systems. | ||
** A new database (Oracle RAC) has been set-up to host the Atlas 3D database. This is updated from CERN via Oracle GoldenGate. This system is yet to be brought into use. (Currently Atlas 3D/Frontier still uses the OGMA datase system, although this was also changed to update from CERN using Oracle Golden Gate.) | ** A new database (Oracle RAC) has been set-up to host the Atlas 3D database. This is updated from CERN via Oracle GoldenGate. This system is yet to be brought into use. (Currently Atlas 3D/Frontier still uses the OGMA datase system, although this was also changed to update from CERN using Oracle Golden Gate.) | ||
** Switch LFC/3D to new Database Infrastructure. | ** Switch LFC/3D to new Database Infrastructure. | ||
** Update to Oracle 11.2.0.4 | ** Update to Oracle 11.2.0.4 | ||
* Castor: | * Castor: | ||
− | |||
** Update SRMs to new version (includes updating to SL6). | ** Update SRMs to new version (includes updating to SL6). | ||
** Fix discrepancies were found in some of the Castor database tables and columns. (The issue has no operational impact.) | ** Fix discrepancies were found in some of the Castor database tables and columns. (The issue has no operational impact.) | ||
Line 115: | Line 121: | ||
** Enable the RIP protocol for updating routing tables on the Tier1 routers. (Install patch to Router software). | ** Enable the RIP protocol for updating routing tables on the Tier1 routers. (Install patch to Router software). | ||
* Fabric | * Fabric | ||
− | ** Migration of data to new T10KD tapes. (Migration of CMS from 'B' to 'D' tapes finished; migration of GEN from 'A' to 'D' | + | ** Migration of data to new T10KD tapes. (Migration of CMS from 'B' to 'D' tapes finished; migration of GEN from 'A' to 'D' almost complete.) |
** Firmware updates on remaining EMC disk arrays (Castor, FTS/LFC) | ** Firmware updates on remaining EMC disk arrays (Castor, FTS/LFC) | ||
− | |||
<!-- ***************End Advanced warning for other interventions*************** -----> | <!-- ***************End Advanced warning for other interventions*************** -----> | ||
<!-- ************************************************************************** -----> | <!-- ************************************************************************** -----> | ||
Line 182: | Line 187: | ||
| In Progress | | In Progress | ||
| 2015-01-12 | | 2015-01-12 | ||
− | | 2015-01- | + | | 2015-01-15 |
| Atlas | | Atlas | ||
| large transfer errors from RAL-LCG2 to BNL-OSG2 | | large transfer errors from RAL-LCG2 to BNL-OSG2 | ||
|- | |- | ||
| 110605 | | 110605 | ||
− | | | + | | Yellow |
| Less Urgent | | Less Urgent | ||
| In Progress | | In Progress | ||
| 2014-12-08 | | 2014-12-08 | ||
− | | 2015-01- | + | | 2015-01-20 |
| ops | | ops | ||
| [Rod Dashboard] Issues detected at RAL-LCG2 (srm-cms-disk.gridpp.rl.ac.uk) | | [Rod Dashboard] Issues detected at RAL-LCG2 (srm-cms-disk.gridpp.rl.ac.uk) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 109712 | | 109712 | ||
Line 218: | Line 214: | ||
| On hold | | On hold | ||
| 2014-11-03 | | 2014-11-03 | ||
− | | | + | | 2015-01-20 |
| SNO+ | | SNO+ | ||
| gfal-copy failing for files at RAL | | gfal-copy failing for files at RAL | ||
Line 227: | Line 223: | ||
| In Progress | | In Progress | ||
| 2014-10-01 | | 2014-10-01 | ||
− | | 2015-01- | + | | 2015-01-19 |
| CMS | | CMS | ||
| AAA access test failing at T1_UK_RAL | | AAA access test failing at T1_UK_RAL | ||
Line 236: | Line 232: | ||
| On Hold | | On Hold | ||
| 2014-08-27 | | 2014-08-27 | ||
− | | | + | | 2015-01-20 |
| Atlas | | Atlas | ||
| BDII vs SRM inconsistent storage capacity numbers | | BDII vs SRM inconsistent storage capacity numbers |
Latest revision as of 17:14, 21 January 2015
RAL Tier1 Operations Report for 21st January 2015
Review of Issues during the week 14th to 21st January 2015. |
- The high load on the LHCb SRMs reported last week continued into this reporting period with intermittent SAM test failures. The problem has been mitigated: The particular LHCb workflow that loaded the SRMs heavily has eased and a third system has been added into the LHCb SRM alias.
- Electrical circuit testing in the machine room has continued into this week. Some further problems have been encountered and we have tripped off some (a few tens of) worker nodes. However, no critical services have been affected.
Resolved Disk Server Issues |
- None
Current operational status and issues |
- We are running with a single router connecting the Tier1 network to the site network, rather than a resilient pair.
Ongoing Disk Server Issues |
- None
Notable Changes made this last week. |
- The bulk of the safety checking of the electrical power circuits in the machine room has been completed. The whole task will finish tomorrow, Thursday 22nd January.
- The problem with xroot access to the Castor GEN instance was fixed during the afternoon of Wednesday 14th Jan. (This problem did not affect ALICE).
- A third SRM system was added to the LHCb alias (sm-lhcb.gridpp.rl.ac.uk) on Thursday 15th Jan.
- The Castor Nameserver headnodes were updated to SL6 on Monday 19th Jan. This operation was transparent to Castor users.
- The migration of all data off T10000A & B media is almost complete.
Declared in the GOC DB |
Service | Scheduled? | Outage/At Risk | Start | End | Duration | Reason |
---|---|---|---|---|---|---|
Whole site | SCHEDULED | WARNING | 20/01/2015 08:30 | 22/01/2015 18:00 | 2 days, 9 hours and 30 minutes | Warning during safety checks on power circuits in machine room. Testing carried out during working hours on each day. |
Advanced warning for other interventions |
The following items are being discussed and are still to be formally scheduled and announced. |
- Investigate problems on the primary Tier1 router. We plan to run the primary (failing) router for a few hours tomorrow (Thursday 22nd Jan) in order to trap the problem. If there is a failure it will take a few minutes for a manual switch back to the secondary to be effected.
- The circuit testing of the remaining (i.e. non-UPS) circuits in the machine room in ongoing and will be completed tomorrow (Thursday 22nd Jan).
- A patch to FTS3 (to version 3.2.31) will be rolled out in the next days.
- OS updates on disk servers (expected in week 26-30 Jan).
- Move of connection for CERN Backup link.
Listing by category:
- Databases:
- Application of Oracle PSU patches to database systems.
- A new database (Oracle RAC) has been set-up to host the Atlas 3D database. This is updated from CERN via Oracle GoldenGate. This system is yet to be brought into use. (Currently Atlas 3D/Frontier still uses the OGMA datase system, although this was also changed to update from CERN using Oracle Golden Gate.)
- Switch LFC/3D to new Database Infrastructure.
- Update to Oracle 11.2.0.4
- Castor:
- Update SRMs to new version (includes updating to SL6).
- Fix discrepancies were found in some of the Castor database tables and columns. (The issue has no operational impact.)
- Update Castor to 2.1-14-latest, this depends on SL6 being deployed.
- Networking:
- Resolve problems with primary Tier1 Router
- Move switches connecting the 2011 disk servers batches onto the Tier1 mesh network.
- Make routing changes to allow the removal of the UKLight Router.
- Enable the RIP protocol for updating routing tables on the Tier1 routers. (Install patch to Router software).
- Fabric
- Migration of data to new T10KD tapes. (Migration of CMS from 'B' to 'D' tapes finished; migration of GEN from 'A' to 'D' almost complete.)
- Firmware updates on remaining EMC disk arrays (Castor, FTS/LFC)
Entries in GOC DB starting between the 14th and 21st January 2015. |
Service | Scheduled? | Outage/At Risk | Start | End | Duration | Reason |
---|---|---|---|---|---|---|
Whole site | SCHEDULED | WARNING | 20/01/2015 08:30 | 22/01/2015 18:00 | 2 days, 9 hours and 30 minutes | Warning during safety checks on power circuits in machine room. Testing carried out during working hours on each day. |
All Castor (all SRM endpoints) | SCHEDULED | WARNING | 19/01/2015 09:15 | 19/01/2015 16:00 | 6 hours and 45 minutes | Warning during OS upgrade (SL6) on Castor Nameservers. |
Whole site | SCHEDULED | WARNING | 13/01/2015 18:30 | 15/01/2015 18:00 | 1 day, 23 hours and 30 minutes | Warning during safety checks on power circuits in machine room. Testing carried out during working hours on each day. |
Open GGUS Tickets (Snapshot during morning of meeting) |
GGUS ID | Level | Urgency | State | Creation | Last Update | VO | Subject |
---|---|---|---|---|---|---|---|
111120 | Green | Less Urgent | In Progress | 2015-01-12 | 2015-01-15 | Atlas | large transfer errors from RAL-LCG2 to BNL-OSG2 |
110605 | Yellow | Less Urgent | In Progress | 2014-12-08 | 2015-01-20 | ops | [Rod Dashboard] Issues detected at RAL-LCG2 (srm-cms-disk.gridpp.rl.ac.uk) |
109712 | Red | Urgent | In Progress | 2014-10-29 | 2015-01-09 | CMS | Glexec exited with status 203; ... |
109694 | Red | Urgent | On hold | 2014-11-03 | 2015-01-20 | SNO+ | gfal-copy failing for files at RAL |
108944 | Red | Urgent | In Progress | 2014-10-01 | 2015-01-19 | CMS | AAA access test failing at T1_UK_RAL |
107935 | Red | Less Urgent | On Hold | 2014-08-27 | 2015-01-20 | Atlas | BDII vs SRM inconsistent storage capacity numbers |
Availability Report |
Key: Atlas HC = Atlas HammerCloud (Queue ANALY_RAL_SL6, Template 508); CMS HC = CMS HammerCloud
Day | OPS | Alice | Atlas | CMS | LHCb | Atlas HC | CMS HC | Comment |
---|---|---|---|---|---|---|---|---|
14/01/15 | 100 | 100 | 100 | 100 | 55.6 | 100 | 100 | Load (stripping campaign) affecting LHCb SRMs. User timeouts on tests. |
15/01/15 | 100 | 100 | 100 | 100 | 97.3 | 100 | 78 | Load. Single SRM test failure ([SRM_FILE_BUSY]). |
16/01/15 | 100 | 100 | 100 | 100 | 90.0 | 90 | 100 | Config problem as additional SRM set-up. |
17/01/15 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | |
18/01/15 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | |
19/01/15 | 100 | 100 | 100 | 100 | 100 | 100 | 99 | |
20/01/15 | 100 | 100 | 100 | 100 | 100 | 100 | 100 |