Difference between revisions of "RAL Tier1 weekly operations castor 19/08/2016"
(6 intermediate revisions by one user not shown) | |||
Line 2: | Line 2: | ||
1. Problems encountered this week | 1. Problems encountered this week | ||
+ | |||
2. Upgrades/improvements made this week | 2. Upgrades/improvements made this week | ||
+ | 3. What are we planning to do next week? | ||
+ | |||
+ | 4. Long-term project updates (if not already covered) | ||
+ | |||
+ | 1. Facilities drive reallocation | ||
+ | 2. 2.1.15 | ||
+ | 3. SL7 upgrade on tape servers | ||
+ | |||
+ | 5. Special topics | ||
+ | |||
+ | 6. Actions | ||
+ | |||
+ | 7. Anything for CASTOR-Fabric? | ||
+ | |||
+ | 8. AoTechnicalB | ||
+ | |||
+ | 9. Availability for next week | ||
+ | |||
+ | 10. On-Call | ||
+ | |||
+ | 11. AoOtherB | ||
== Operation problems == | == Operation problems == | ||
+ | Data packet loss observed in the internal network | ||
== Operation news == | == Operation news == | ||
− | |||
== Long-term projects == | == Long-term projects == | ||
Line 16: | Line 38: | ||
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR scheduled | SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR scheduled | ||
− | |||
== Actions == | == Actions == | ||
Line 25: | Line 46: | ||
RA to update the doc for xroot certificates | RA to update the doc for xroot certificates | ||
− | |||
== Completed actions == | == Completed actions == | ||
GP to present the stress test results of gdss596 configured with the WAN tuning parameters | GP to present the stress test results of gdss596 configured with the WAN tuning parameters | ||
− | |||
== Staffing == | == Staffing == | ||
Line 36: | Line 55: | ||
RA on call | RA on call | ||
− | CP,AS away | + | CP, AS away |
Latest revision as of 09:00, 26 August 2016
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Facilities drive reallocation 2. 2.1.15 3. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
Data packet loss observed in the internal network
Operation news
Long-term projects
Work on Castor 2.1.15 draining continues
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR scheduled
Actions
RA disks servers requiring RAID update - locate servers and plan for update with fabric
RA decide what to do with persistent data (for daily test) is still on GenScratch
RA to update the doc for xroot certificates
Completed actions
GP to present the stress test results of gdss596 configured with the WAN tuning parameters
Staffing
RA on call
CP, AS away