# Problems encountered this week | # Problems encountered this week | ||
Line 13: | Line 13: | ||
# Availability for next week | # Availability for next week | ||
# On-Call | # On-Call | ||
− | + | # AoOtherB | |
− | + | ||
== Minutes from the previous meeting == | == Minutes from the previous meeting == | ||
Line 67: | Line 66: | ||
George will liaise with Bruno so that he can understand better the technical requirements of the SL7 upgrade on the tape servers | George will liaise with Bruno so that he can understand better the technical requirements of the SL7 upgrade on the tape servers | ||
− | == | + | == Staffing == |
RA on call | RA on call |
Latest revision as of 10:17, 12 August 2016
Contents
Draft Agenda
- Problems encountered this week
- Upgrades/improvements made this week
- What are we planning to do next week?
- Long-term project updates (if not already covered)
- Facilities drive reallocation
- 2.1.15
- Special topics
- Actions
- Anything for CASTOR-Fabric?
- AoTechnicalB
- Availability for next week
- On-Call
- AoOtherB
Minutes from the previous meeting
Operation problems
gdss650 (LHCB d1t0) gdss634 (atlasTape) went out of production due to hard drive and RAID card problems respectively
Operation news
Three Dell 2015 disk servers were deployed into atlasTape. Six more are under deployment into cmsTape and lhcbRawRdst
Long-term projects
xroot tests for the 2.1.5 upgrade are in progress. A phone meeting will be arranged with Giussepe next week
Migration to aquilon and SL7 upgrade. GP has created a VM on the cloud and will start adding tape server features on aquilon
Staffing
CP on call next week
Actions
RA disks servers requiring RAID update - locate servers and plan for update with fabric
RA decide what to do with persistent data (for daily test) is still on GenScratch
RA to update the doc for xroot certificates
GP to present the stress test results of gdss596 configured with the WAN tuning parameters
Completed actions
CASTOR TEAM Durham / Leicester Dirac data - need to create separate tape pools / uid / gid
GP to review with RA the mailing lists he is on
Operation problems
gdss678 failed went out production
Operation news
All 9 new Dell tape-backed disk servers have been deployed into CASTOR
Long-term projects
Good progress has been made with the CASTOR 2.1.15 upgrade. The gridFTP transfer problem was fixed and a configuration check bug was isolated. Stress, functional, xroot tests will be scheduled
George will liaise with Bruno so that he can understand better the technical requirements of the SL7 upgrade on the tape servers
Staffing
RA on call
Alison away
Actions
RA disks servers requiring RAID update - locate servers and plan for update with fabric
RA decide what to do with persistent data (for daily test) is still on GenScratch
RA to update the doc for xroot certificates
GP to present the stress test results of gdss596 configured with the WAN tuning parameters