Difference between revisions of "RAL Tier1 weekly operations castor 31/03/2014"
From GridPP Wiki
(→Advanced Planning) |
(→Advanced Planning) |
||
Line 18: | Line 18: | ||
== Advanced Planning == | == Advanced Planning == | ||
'''Tasks''' | '''Tasks''' | ||
− | REVIEW THIS | + | <<<<< REVIEW THIS >>>>> |
* CASTOR 2.1.14 + SL5/6 testing. The change control has gone through today with few problems. | * CASTOR 2.1.14 + SL5/6 testing. The change control has gone through today with few problems. | ||
* iptables to be installed on lcgcviewer01 to harden the logging system against the injection of junk data by security scans. | * iptables to be installed on lcgcviewer01 to harden the logging system against the injection of junk data by security scans. |
Revision as of 16:16, 28 March 2014
Contents
Operations News
- Disk deployments: 1 CV’13 in lhcbDst / 10 CV ’13 in lhcbNonProd waiting for blessing / 3 CV’13 on way to cmsNonProd
- Disk Draining: 2 atlas servers drained and 1 in progress. 3 CMS servers drained and 1 in progress
Operations Problems
- CMS load continues to cause problems, we had to restart transfer/diskmanagers to get things working again (Monday 10:45 and Tuesday 17:30)
- transfermanagerd restarted on fdscdlf02 Thursday
- vcert srm and name server not accessible due to issues with hypervisor after rack move, possibly some config required to bring it back. Dimitrios is looking into this
- We had a node crash on Neptune causing brief issues with Atlas srm, known issue has already been logged with Oracle
Blocking Issues
- none
Planned, Scheduled and Cancelled Interventions
Entries in/planned to go to GOCDB
Advanced Planning
Tasks <<<<< REVIEW THIS >>>>>
- CASTOR 2.1.14 + SL5/6 testing. The change control has gone through today with few problems.
- iptables to be installed on lcgcviewer01 to harden the logging system against the injection of junk data by security scans.
- Quattor cleanup process is ongoing.
- Installation of new Preprod headnodes
Interventions
- (Tue 1 Apr) Facilities CASTOR Upgrade. Downtime between 0900-1600
Staffing
- Castor on Call person
- Matthew
- Staff absence/out of the office:
- (Mon-Fri) Rob A/L
- (Friday) Bruno poss A/L