Line 28: | Line 28: | ||
|UKI-LT2-IC-HEP | |UKI-LT2-IC-HEP | ||
|<span style="color:green">Done</span> | |<span style="color:green">Done</span> | ||
− | | | + | | Server racked in the machine room. |
− | |2020- | + | |2020-05-29 |
Line 35: | Line 35: | ||
|UKI-LT2-QMUL | |UKI-LT2-QMUL | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
− | | | + | |New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’. |
− | |2020- | + | |
+ | As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us. | ||
+ | |2020-05-29 | ||
|- | |- | ||
|UKI-LT2-RHUL | |UKI-LT2-RHUL | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
− | | | + | |New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon) |
− | |2020- | + | |2020-05-29 |
|- | |- | ||
Line 101: | Line 103: | ||
|UKI-SOUTHGRID-BRIS | |UKI-SOUTHGRID-BRIS | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
− | | | + | |Building still closed, new Perfsonar hardware still with delivery/vendor |
− | |2020- | + | |2020-05-29 |
|- | |- |
Revision as of 12:32, 30 September 2020
Site | Status | Notes | Date last reviewed or updated
|
RAL Tier-1 | In progress | Hardware has been delivered. Still in boxes as it is not a clear . Realistic time frame of October for deployment. | 2020-05-29
|
UKI-LT2-Brunel | In progress | Server in rack | 2020-09-30
|
UKI-LT2-IC-HEP | Done | Server racked in the machine room. | 2020-05-29
|
UKI-LT2-QMUL | In progress | New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.
As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us. |
2020-05-29 |
UKI-LT2-RHUL | In progress | New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon) | 2020-05-29 |
UKI-LT2-UCL-HEP | In progress | 2020-09-30 | |
UKI-NORTHGRID-LANCS-HEP | In progress | 2020-09-30 | |
UKI-NORTHGRID-LIV-HEP | In progress | 2020-09-30 | |
UKI-NORTHGRID-MAN-HEP | In progress | 2020-09-30
| |
UKI-NORTHGRID-SHEF-HEP | In progress | 2020-09-30 | |
UKI-SCOTGRID-DURHAM | In progress | 2020-09-30 | |
UKI-SCOTGRID-ECDF | In progress | 2020-09-30 | |
UKI-SCOTGRID-GLASGOW | In progress | 2020-09-30 | |
UKI-SOUTHGRID-BHAM-HEP | In progress | 2020-09-30 | |
UKI-SOUTHGRID-BRIS | In progress | Building still closed, new Perfsonar hardware still with delivery/vendor | 2020-05-29 |
UKI-SOUTHGRID-CAM-HEP | In progress | 2020-09-30 | |
UKI-SOUTHGRID-OX-HEP | In progress | 2020-09-30 | |
UKI-SOUTHGRID-RALPP | In progress | 2020-09-30 | |
UKI-SOUTHGRID-SUSX | In progress | 2020-09-30 |