Difference between revisions of "RAL Tier1 weekly operations castor 24/08/2018"
(→Operation problems) |
(→Operation problems) |
||
(3 intermediate revisions by one user not shown) | |||
Line 37: | Line 37: | ||
* gdss747 is irretrievably lost - work in progress to clean up stager db | * gdss747 is irretrievably lost - work in progress to clean up stager db | ||
− | * Unusual high failure rate in LHCb transfers from RAL WN to CASTOR ggus ticket | + | * Unusual high failure rate in LHCb transfers from RAL WN to CASTOR [https://ggus.eu/index.php?mode=ticket_info&ticket_id=136701 GGUS ticket] |
== Operation news == | == Operation news == | ||
− | * | + | * The endpoint for the new CASTOR instance is published on GOCDB as monitored |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
== Plans for next few weeks == | == Plans for next few weeks == | ||
− | |||
− | |||
* Push gsi authentication for xrootd in production | * Push gsi authentication for xrootd in production | ||
Line 60: | Line 54: | ||
3) Perform a stress test | 3) Perform a stress test | ||
− | Things need doing: log rotation, | + | Things need doing: log rotation, xrootd for ALICE |
== Actions == | == Actions == |
Latest revision as of 09:51, 24 August 2018
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. SL5 elimination from CIP and tape verification server 2. CASTOR stress test improvement 3. Generic CASTOR headnode setup 4. Aquilonised headnodes
5. Special topics
6. Actions
7. Review Fabric tasks
1. Link
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
* gdss771 (lhcbDst) failed and were removed from prod
* gdss757 (cmsDisk) was removed from prod as a precaution
* gdss747 is irretrievably lost - work in progress to clean up stager db
* Unusual high failure rate in LHCb transfers from RAL WN to CASTOR GGUS ticket
Operation news
* The endpoint for the new CASTOR instance is published on GOCDB as monitored
Plans for next few weeks
* Push gsi authentication for xrootd in production
* Decommission gdss747
Long-term projects
gsi authentication for xrootd: 1) Return preprod to a working state 2) Ask Raja and Tim to test the gsi config on preprod 3) Perform a stress test
Things need doing: log rotation, xrootd for ALICE
Actions
JK to investigate why ralreplicas fails and submit a "bug" report
RA/BD: Run GFAL unit tests against CASTOR. Get them here: https://gitlab.cern.ch/dmc/gfal2/tree/develop/test/
GP/RA to write a Nagios test to check for large number of requests on the NewRequests DB table that remain for a long time - the check will run every xxx min (to be aggreed with Production) and issue an alarm if the number exceeds 1,000 for an extended period of time (15 min)
Staffing
GP on call