| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 21st February 2018 to 28th February 2018 | | style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 21st February 2018 to 28th February 2018 | ||
|} | |} | ||
− | |||
* There is an outage on Castor announced for Thursday (1st March) while the database systems have Oracle patches applied. | * There is an outage on Castor announced for Thursday (1st March) while the database systems have Oracle patches applied. | ||
− | * The IPv6 connections, both to the RAL Core network and the 'bypass' route were moved to share the IPv4 connections | + | * The IPv6 connections, both to the RAL Core network and the 'bypass' route were successfully moved to share the IPv4 connections.This was done ahead of a change to enable IPv6 (dual stack) on the Echo Gateways which was enabled yesterday (27th). |
+ | * AliceDisk is getting very full. Alice have been in informed and we continue to monitor. | ||
<!-- ***********End Review of Issues during last week*********** -----> | <!-- ***********End Review of Issues during last week*********** -----> | ||
<!-- *********************************************************** -----> | <!-- *********************************************************** -----> | ||
Line 69: | Line 69: | ||
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made since the last meeting. | | style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made since the last meeting. | ||
|} | |} | ||
− | |||
<!-- *************End Notable Changes made this last week************** -----> | <!-- *************End Notable Changes made this last week************** -----> | ||
<!-- ****************************************************************** -----> | <!-- ****************************************************************** -----> | ||
Line 122: | Line 121: | ||
'''Listing by category:''' | '''Listing by category:''' | ||
* Echo | * Echo | ||
− | ** | + | ** Applying minor CEPH update to fix the "backfill" bug. Increase number of placement groups and add more capacity. |
* Castor: | * Castor: | ||
** Update systems to use SL7 and configured by Quattor/Aquilon. (Tape servers done) | ** Update systems to use SL7 and configured by Quattor/Aquilon. (Tape servers done) | ||
Line 131: | Line 130: | ||
* Internal | * Internal | ||
** DNS servers will be rolled out within the Tier1 network. | ** DNS servers will be rolled out within the Tier1 network. | ||
− | + | * Infrastructure | |
− | * Testing of power distribution boards in the R89 machine room is being scheduled for some time late July / Early August. The effect of this on our services is being discussed. | + | ** Testing of power distribution boards in the R89 machine room is being scheduled for some time late July / Early August. The effect of this on our services is being discussed. |
<!-- ***************End Advanced warning for other interventions*************** -----> | <!-- ***************End Advanced warning for other interventions*************** -----> | ||
<!-- ************************************************************************** -----> | <!-- ************************************************************************** -----> | ||
Line 347: | Line 346: | ||
| 2018/02/25 || style="background-color: yellow;" | 96 || style="background-color: yellow;" | 99|| | | 2018/02/25 || style="background-color: yellow;" | 96 || style="background-color: yellow;" | 99|| | ||
|- | |- | ||
− | | 2018/02/26 || 100 | | + | | 2018/02/26 || 100 || 100 || |
|- | |- | ||
| 2018/02/27 || style="background-color: yellow;" | 95 || 100 || | | 2018/02/27 || style="background-color: yellow;" | 95 || 100 || | ||
Line 359: | Line 358: | ||
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;" | {| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;" | ||
− | |||
|- | |- | ||
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notes from Meeting. | | style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notes from Meeting. | ||
|} | |} |
Latest revision as of 11:43, 28 February 2018
RAL Tier1 Operations Report for 28th February 2018
Review of Issues during the week 21st February 2018 to 28th February 2018 |
- There is an outage on Castor announced for Thursday (1st March) while the database systems have Oracle patches applied.
- The IPv6 connections, both to the RAL Core network and the 'bypass' route were successfully moved to share the IPv4 connections.This was done ahead of a change to enable IPv6 (dual stack) on the Echo Gateways which was enabled yesterday (27th).
- AliceDisk is getting very full. Alice have been in informed and we continue to monitor.
Current operational status and issues |
- The problems with data flows through the site firewall being restricted is still present. New firewall kit has be purchased and delivered, awaiting deployment.
- Echo Gateway Dual Stack upgrade was implemented but appears to have broken RAL FTS. Currently CERN FTS is being used as a stop-gap solution. This issues is on-going at time of writing.
Resolved Castor Disk Server Issues |
- gdss776 (d1t0) - Back in production (RO)
- gdss762 (d1t0) - Back in production (RO)
Ongoing Castor Disk Server Issues |
- None
Limits on concurrent batch system jobs. |
- CMS Multicore 550
Notable Changes made since the last meeting. |
Entries in GOC DB starting since the last report. |
- None
Declared in the GOC DB |
Downtime ID | Hosts | Start time | End time | Severity | Description |
---|---|---|---|---|---|
24947 | srm-biomed.gridpp.rl.ac.uk (SRM),srm-dteam.gridpp.rl.ac.uk (SRM), srm-cms.gridpp.rl.ac.uk (SRM),srm-atlas.gridpp.rl.ac.uk (SRM),srm-lhcb.gridpp.rl.ac.uk (SRM), srm-minos.gridpp.rl.ac.uk (SRM), srm-alice.gridpp.rl.ac.uk (SRM), srm-ilc.gridpp.rl.ac.uk (SRM), srm-mice.gridpp.rl.ac.uk (SRM), srm-t2k.gridpp.rl.ac.uk (SRM),srm-preprod.gridpp.rl.ac.uk (SRM), srm-cert.gridpp.rl.ac.uk (SRM), srm-na62.gridpp.rl.ac.uk (SRM), srm-snoplus.gridpp.rl.ac.uk (SRM), srm-lhcb.gridpp.rl.ac.uk (SRM.nearline), srm-cms-disk.gridpp.rl.ac.uk (SRM), srm-pheno.gridpp.rl.ac.uk (SRM), srm-solid.gridpp.rl.ac.uk (SRM) | 01/03/2018 11:00 | 01/03/2018 17:00 | SCHEDULED OUTAGE | Patching Castor Neptune and Pluto Primary Environments (GI+DB PSU + OJVM PSU OCT 2017) |
Advanced warning for other interventions |
The following items are being discussed and are still to be formally scheduled and announced. |
Listing by category:
- Echo
- Applying minor CEPH update to fix the "backfill" bug. Increase number of placement groups and add more capacity.
- Castor:
- Update systems to use SL7 and configured by Quattor/Aquilon. (Tape servers done)
- Move to generic Castor headnodes.
- Networking
- Extend the number of services on the production network with IPv6 dual stack. (Done for Perfsonar, FTS3, all squids and the CVMFS Stratum-1 servers).
- Replacement (upgrade) of RAL firewall.
- Internal
- DNS servers will be rolled out within the Tier1 network.
- Infrastructure
- Testing of power distribution boards in the R89 machine room is being scheduled for some time late July / Early August. The effect of this on our services is being discussed.
Open GGUS Tickets (Snapshot during morning of meeting) |
Request id | Affected vo | Status | Priority | Date of creation | Last update | Type of problem | Subject | Scope |
---|---|---|---|---|---|---|---|---|
117683 | none | on hold | less urgent | 18/11/2015 | 03/01/2018 | Information System | CASTOR at RAL not publishing GLUE 2 | EGI |
124876 | ops | on hold | less urgent | 07/11/2016 | 13/11/2017 | Operations | [Rod Dashboard] Issue detected : hr.srce.GridFTP-Transfer-ops@gridftp.echo.stfc.ac.uk | EGI |
127597 | cms | on hold | urgent | 07/04/2017 | 29/01/2018 | File Transfer | Check networking and xrootd RAL-CERN performance | EGI |
132589 | lhcb | in progress | very urgent | 21/12/2017 | 23/02/2018 | Local Batch System | Killed pilots at RAL | WLCG |
133619 | cms | in progress | top priority | 21/02/2018 | 27/02/2018 | CMS_Central Workflows | T1_UK_RAL Unmerged files missing | WLCG |
133717 | cms | in progress | very urgent | 27/02/2018 | 27/02/2018 | CMS_Data Transfers | RAL FTS3 Service: Significant Drop in Transfer Efficiency | WLCG |
133719 | atlas | in progress | urgent | 27/02/2018 | 27/02/2018 | File Transfer | Transfers to RAL-LCG2-ECHO failing | WLCG |
GGUS Tickets Closed Last week |
- None
Availability Report |
Day | ALICE | ATLAS | ATLAS-ECHO | CMS | LHCb | OPS | Comment |
---|---|---|---|---|---|---|---|
2018-02-22 | 100 | 100 | 100 | 100 | 100 | 100 | |
2018-02-23 | 100 | 100 | 100 | 100 | 100 | 100 | |
2018-02-24 | 100 | 100 | 100 | 100 | 100 | 100 | |
2018-02-25 | 100 | 100 | 100 | 100 | 100 | 100 | |
2018-02-26 | 100 | 100 | 100 | 100 | 100 | 100 | |
2018-02-27 | 100 | 100 | 100 | 100 | 100 | 100 | |
2018-02-28 | 100 | 100 | 100 | 100 | 100 | 100 |
Hammercloud Test Report |
Key: Atlas HC = Atlas HammerCloud (Queue RAL-LCG2_UCORE, Template 841); CMS HC = CMS HammerCloud
Day | Atlas HC | CMS HC | Comment |
---|---|---|---|
2018/02/21 | 95 | 99 | |
2018/02/22 | 98 | 99 | |
2018/02/23 | 97 | 99 | |
2018/02/24 | 100 | 99 | |
2018/02/25 | 96 | 99 | |
2018/02/26 | 100 | 100 | |
2018/02/27 | 95 | 100 |