Difference between revisions of "RAL Tier1 weekly operations castor 06/10/2017"
(Created page with "== Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not ...") |
|||
Line 1: | Line 1: | ||
+ | Parent article: https://www.gridpp.ac.uk/wiki/RAL_Tier1_weekly_operations_castor | ||
+ | |||
== Draft agenda == | == Draft agenda == | ||
Latest revision as of 09:28, 13 October 2017
Parent article: https://www.gridpp.ac.uk/wiki/RAL_Tier1_weekly_operations_castor
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. SL7 upgrade on tape servers 2. SL5 elimination from CASTOR functional test boxes and tape verification server 3. CASTOR stress test improvement 4. Generic CASTOR headnode setup
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
gdss772 went out production
fdsdss36 went out production
cmsDisk is full
Operation news
Plans for next week
Long-term projects
Tape-server migration to aquilon and SL7 upgrade: successfull functional testing has ben done on prerprod
CASTOR stress test improvement
Configure multiple instances of a CASTOR generic headnode
Drain and decomission/recomission the 12 generation disk servers
Actions
RA to check if the disk server setting, changed to bring disk servers back more quickly after a CASTOR shutdown, is still in place
Ensure that Fabric is on track with the deployment of the new DB hardware
RA to ensure that proper Nagios checks are in place for the xroot manager boxes
RA and JK to do the the new service checklist for the new functional test box (castor-functional-test1)
GP to talk to AL about service ownership/handover of the xroot manager boxes
Staffing
CP out on Mon
RA out on A/L
GP on call