https://www.gridpp.ac.uk/w/api.php?action=feedcontributions&user=Gordon+Stewart+d88945c56d&feedformat=atom
GridPP Wiki - User contributions [en]
2024-03-29T06:49:09Z
User contributions
MediaWiki 1.22.0
https://www.gridpp.ac.uk/wiki/Perfsonar_Cert_Status
Perfsonar Cert Status
2021-09-14T14:31:02Z
<p>Gordon Stewart d88945c56d: </p>
<hr />
<div>Table to track status of Perfsonar Certificates.<br />
<br />
Referencing the sites from the mesh: https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config<br />
<br />
<br />
{| class="wikitable"<br />
! Site<br />
! Current Cert<br />
! Planned Cert<br />
! Anticipated timeframe<br />
! Date of last update<br />
|-<br />
| Jisc-Slough<br />
| Jisc<br />
|<br />
|<br />
|<br />
|-<br />
| RAL-LCG2<br />
|eScience / self signed<br />
|<br />
|June/July<br />
|01/06/2021<br />
|-<br />
| IMPERIAL<br />
|<br />
| <br />
|<br />
|<br />
|-<br />
| RHUL<br />
| GEANT OV RSA CA 4<br />
| GEANT OV RSA CA 4<br />
| renew annually in June<br />
| 15/06/21<br />
|-<br />
| LANCS<br />
| letsencrypt<br />
| <strike>JISC</strike> eScience after discussion<br />
| <strike>May June</strike> July<br />
| 29/6/21<br />
|-<br />
| LIVERPOOL<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| SHEFFIELD<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| DURHAM<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| ECDF<br />
|GEANT OV RSA CA 4<br />
|GEANT OV RSA CA 4<br />
|renew each year<br />
|290421<br />
|-<br />
| GLASGOW<br />
|Let's Encrypt<br />
|<br />
|<br />
|07/09/2021<br />
|-<br />
| BIRMINGHAM<br />
|eScience<br />
|<br />
|<br />
|21/05/2021<br />
|-<br />
| BRISTOL<br />
|self-signed<br />
|<br />
|<br />
|07/10/2020<br />
|-<br />
| OXFORD<br />
|Entrust<br />
|<br />
|<br />
|29/04/21<br />
|-<br />
| RALPP<br />
| eScience<br />
| GEANT OV RSA CA 4<br />
| Soon<br />
| 29/06/2021<br />
|-<br />
| SUSSEX<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
|}</div>
Gordon Stewart d88945c56d
https://www.gridpp.ac.uk/wiki/Tier2_NFL2021
Tier2 NFL2021
2021-05-18T13:51:08Z
<p>Gordon Stewart d88945c56d: /* UKI-SCOTGRID-GLASGOW */</p>
<hr />
<div>Please fill this in as best as you can for your site. The previous table from 2017 is on page 8 here:<br />
https://www.gridpp.ac.uk/wp-content/uploads/2017/10/179_20171004_NetworkForwardLook.pdf <br />
<br />
==UKI-LT2-BRUNEL==<br />
Institution Janet Connection: 8 x 10G<br />
<br />
Tier 2 Connection:4 x 10G<br />
<br />
Forward Look: Covid delayed network upgrade finally started (May/2021). All internal network moving to 100G<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-LT2-IC-HEP==<br />
Institution Janet Connection: 100Gb/s<br />
<br />
Tier 2 Connection: 100Gb/s shared<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc): LHCONE routing enabled<br />
<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-LT2-QMUL==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-LT2-RHUL==<br />
Institution Janet Connection: <br />
1x10 Gb/s plus second 10 Gb/s backup link<br />
<br />
Tier 2 Connection:<br />
1x10 Gb/s plus second 10 Gb/s backup link, dedicated and separate to the institute connection above<br />
<br />
<br />
Forward Look:<br />
Network manager is in discussions at an early stage with JISC to get a 100 Gb/s link, but this may be shared with other users on campus. <br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
Tier2 has dedicated Janet links which bypass the campus firewall. <br />
College occasionally expresses concern about cost implications of our (future) network requirements.<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-NORTHGRID-LANCS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
Site outside the University firewall.<br />
<br />
IPv6 Enabled?: Yes<br />
<br />
IPv6 Comments: Enabled for at least the last 4 years.<br />
<br />
<br />
<br />
==UKI-NORTHGRID-LIV-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-NORTHGRID-MAN-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-NORTHRGRID-SHEF-HEP==<br />
Institution Janet Connection: None shared 1 x 10Gbps link for LHC / Grid / HPC <br />
<br />
Tier 2 Connection: 1 x 10Gbps uplink.<br />
<br />
Forward Look: No bandwidth upgrade is planned for LHC / Grid / HPC<br />
activities.<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc): All routes through Institution firewall.<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
<br />
==UKI-SCOTGRID-DURHAM==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-SCOTGRID-ECDF==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-SCOTGRID-GLASGOW==<br />
Institution Janet Connection: 2 × 10 Gb/s<br />
<br />
Tier 2 Connection: 40 Gb/s<br />
<br />
Forward Look: Preliminary discussions (requirements gathering) underway between campus IT Services and Janet.<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc): Current traffic bypasses firewalls with a minimal set of ACLs to restrict certain protocols.<br />
<br />
IPv6 Enabled?: Site has IPv6 allocation<br />
<br />
IPv6 Comments: IPv6 routed to production cluster for perfSONAR. Networking at campus level is currently under review pending future refresh. IPv6 is currently not routed in hardware, so should be avoided for performance-critical operations (e.g. storage access).<br />
<br />
==UKI-SOUTHGRID-BHAM-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-SOUTHGRID-BRIS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-SOUTHGRID-OX-HEP==<br />
Institution Janet Connection: 4 x 10 Gb/s<br />
<br />
Tier 2 Connection: 1 x 10Gb/s dedicated<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
University has 20Gb/s (Actually 2*10) with 20Gb/s failover. Grid site has to share the normal routing so in effect is sharing a 10Gb/s link for any single transfer<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-SOUTHGRID-RALPP==<br />
===Institution Janet Connection:===<br />
<br />
2x100Gb/s Active + 2x100Gb/s Passive Connections<br />
<br />
===Tier 2 Connection:===<br />
2x40Gb/s from T2 router to the Border routers but 2x10Gb/s bottleneck to the T2 Router<br />
<br />
===Forward Look:===<br />
Hardware procured at the end of last FY to upgrade the T2 router to 2x100Gb/s to the Boarder Routers and 2x100Gb downlink.<br />
Discussing connections to the Tier 1 as their network design finalises<br />
<br />
===Comments (including any routing and firewall bypass arrangements, DTZ etc):===<br />
Tier 2 Network is a DTZ and is connected to LHCONE<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:<br />
<br />
<br />
==UKI-SOUTHGRID-SUSSEX==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
IPv6 Enabled?:<br />
<br />
IPv6 Comments:</div>
Gordon Stewart d88945c56d
https://www.gridpp.ac.uk/wiki/Perfsonar_Cert_Status
Perfsonar Cert Status
2021-05-18T11:06:39Z
<p>Gordon Stewart d88945c56d: </p>
<hr />
<div>Table to track status of Perfsonar Certificates.<br />
<br />
Referencing the sites from the mesh: https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config<br />
<br />
<br />
{| class="wikitable"<br />
! Site<br />
! Current Cert<br />
! Planned Cert<br />
! Anticipated timeframe<br />
! Date of last update<br />
|-<br />
| Jisc-Slough<br />
| Jisc<br />
|<br />
|<br />
|<br />
|-<br />
| RAL-LCG2<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| IMPERIAL<br />
|<br />
| <br />
|<br />
|<br />
|-<br />
| RHUL<br />
| self-signed<br />
| GEANT OV RSA CA 4<br />
| May/June<br />
| 11/05/21<br />
|-<br />
| LANCS<br />
| letsencrypt<br />
| <strike>JISC</strike> eScience after discussion<br />
| <strike>May</strike> June<br />
| 17/5/21<br />
|-<br />
| LIVERPOOL<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| SHEFFIELD<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| DURHAM<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| ECDF<br />
|GEANT OV RSA CA 4<br />
|GEANT OV RSA CA 4<br />
|renew each year<br />
|290421<br />
|-<br />
| GLASGOW<br />
|self-signed<br />
|<br />
|<br />
|18/05/2021<br />
|-<br />
| BIRMINGHAM<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| BRISTOL<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| OXFORD<br />
|Entrust<br />
|<br />
|<br />
|29/04/21<br />
|-<br />
| RALPP<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
| SUSSEX<br />
|<br />
|<br />
|<br />
|<br />
|-<br />
|}</div>
Gordon Stewart d88945c56d
https://www.gridpp.ac.uk/wiki/Tier2_NFL2021
Tier2 NFL2021
2021-05-17T14:50:06Z
<p>Gordon Stewart d88945c56d: /* UKI-SCOTGRID-GLASGOW */</p>
<hr />
<div>Please fill this in as best as you can for your site. The previous table from 2017 is on page 8 here:<br />
https://www.gridpp.ac.uk/wp-content/uploads/2017/10/179_20171004_NetworkForwardLook.pdf <br />
<br />
==UKI-LT2-BRUNEL==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-LT2-IC-HEP==<br />
Institution Janet Connection: 100Gb/s<br />
<br />
Tier 2 Connection: 100Gb/s shared<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc): LHCONE routing enabled<br />
<br />
==UKI-LT2-QMUL==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-LT2-RHUL==<br />
Institution Janet Connection: <br />
1x10 Gb/s plus second 10 Gb/s backup link<br />
<br />
Tier 2 Connection:<br />
1x10 Gb/s plus second 10 Gb/s backup link, dedicated and separate to the institute connection above<br />
<br />
<br />
Forward Look:<br />
Network manager is in discussions at an early stage with JISC to get a 100 Gb/s link, but this may be shared with other users on campus. <br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
Tier2 has dedicated Janet links which bypass the campus firewall. <br />
College occasionally expresses concern about cost implications of our (future) network requirements.<br />
<br />
==UKI-NORTHGRID-LANCS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHGRID-LANCS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHGRID-LIV-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHGRID-MAN-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHRGRID-SHEF-HEP==<br />
Institution Janet Connection: None shared 1 x 10Gbps link for LHC / Grid / HPC <br />
<br />
Tier 2 Connection: 1 x 10Gbps uplink.<br />
<br />
Forward Look: No bandwidth upgrade is planned for LHC / Grid / HPC<br />
activities.<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc): All routes through Institution firewall.<br />
<br />
==UKI-SCOTGRID-DURHAM==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SCOTGRID-ECDF==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SCOTGRID-GLASGOW==<br />
Institution Janet Connection: 2 × 10 Gb/s<br />
<br />
Tier 2 Connection: 40 Gb/s<br />
<br />
Forward Look: Preliminary discussions (requirements gathering) underway between campus IT Services and Janet.<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc): Current traffic bypasses firewalls with a minimal set of ACLs to restrict certain protocols.<br />
<br />
==UKI-SOUTHGRID-BHAM-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SOUTHGRID-BRIS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SOUTHGRID-OX-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SOUTHGRID-RALPP==<br />
===Institution Janet Connection:===<br />
<br />
2x100Gb/s Active + 2x100Gb/s Passive Connections<br />
<br />
===Tier 2 Connection:===<br />
2x40Gb/s from T2 router to the Border routers but 2x10Gb/s bottleneck to the T2 Router<br />
<br />
===Forward Look:===<br />
Hardware procured at the end of last FY to upgrade the T2 router to 2x100Gb/s to the Boarder Routers and 2x100Gb downlink.<br />
Discussing connections to the Tier 1 as their network design finalises<br />
<br />
===Comments (including any routing and firewall bypass arrangements, DTZ etc):===<br />
Tier 2 Network is a DTZ and is connected to LHCONE<br />
<br />
==UKI-SOUTHGRID-SUSSEX==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):</div>
Gordon Stewart d88945c56d
https://www.gridpp.ac.uk/wiki/Tier2_NFL2021
Tier2 NFL2021
2021-05-17T09:40:21Z
<p>Gordon Stewart d88945c56d: /* UKI-SCOTGRID-GLASGOW */</p>
<hr />
<div>Please fill this in as best as you can for your site. The previous table from 2017 is on page 8 here:<br />
https://www.gridpp.ac.uk/wp-content/uploads/2017/10/179_20171004_NetworkForwardLook.pdf <br />
<br />
==UKI-LT2-BRUNEL==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-LT2-IC-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-LT2-QMUL==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-LT2-RHUL==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHGRID-LANCS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHGRID-LANCS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHGRID-LIV-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHGRID-MAN-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-NORTHRGRID-SHEF-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SCOTGRID-DURHAM==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SCOTGRID-ECDF==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SCOTGRID-GLASGOW==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection: 40 Gb/s<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc): Current traffic bypasses firewalls with a minimal set of ACLs to restrict certain protocols.<br />
<br />
==UKI-SOUTHGRID-BHAM-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SOUTHGRID-BRIS-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SOUTHGRID-OX-HEP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SOUTHGRID-RALPP==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):<br />
<br />
==UKI-SOUTHGRID-SUSSEX==<br />
Institution Janet Connection: <br />
<br />
Tier 2 Connection:<br />
<br />
Forward Look:<br />
<br />
Comments (including any routing and firewall bypass arrangements, DTZ etc):</div>
Gordon Stewart d88945c56d
https://www.gridpp.ac.uk/wiki/Operations_Team_Action_items
Operations Team Action items
2018-06-12T11:06:54Z
<p>Gordon Stewart d88945c56d: </p>
<hr />
<div>=== Count list for minute taking === <br />
<br />
Works top -> bottom. Vidyo meeting = 1: F2F meeting = 5 (count - last time minutes taken in brackets)<br />
<br />
Minutes can be found at: [http://indico.cern.ch/category/4592/ Operations]<br />
<br />
Alessandra Forti (17 - 11.05.18)<br />
<br />
Andy Washbrook (1 - 29.11.16)<br />
<br />
Andrew McNab (16 - 23.01.18)<br />
<br />
Chris Brew (2 - 5.12.17)<br />
<br />
Daniela Bauer (17 - 06.03.2018)<br />
<br />
Dan Traynor (16 - 30.01.18)<br />
<br />
David Crooks (16 - 26.06.17)<br />
<br />
Duncan Rand (17 - 03.10.2017)<br />
<br />
Elena Korolkova ( - 14.11.2017)<br />
<br />
Gareth Roy (16 - 26.9.17)<br />
<br />
Gordon Stewart (3 - 12.06.2018)<br />
<br />
Govind Songara (2 - 10.10.17)<br />
<br />
Ian Loader (1 - 9.5.17)<br />
<br />
Ian Neilson (1 - 24.1.17)<br />
<br />
Jeremy Coles (16 - 19.12.17)<br />
<br />
John Bland (1 - 31.1.17)<br />
<br />
John Hill (2 - 31.10.17)<br />
<br />
Kashif Mohammad (18 - 20.03.18)<br />
<br />
Matt Doidge (19 - 25.07.17)<br />
<br />
Oliver Smith (1 - 14.02.17)<br />
<br />
Winnie Lacesso<br />
<br />
Pete Gronbech (17 - 27.03.18)<br />
<br />
Raul Lopes (17- 24.04.2018)<br />
<br />
Raja Nandakumar (1 - 5 Sept 2017)<br />
<br />
Robert Currie (2 - 01.5.18)<br />
<br />
Robert Frank (1 - 02.05.17)<br />
<br />
Steve Jones (19 - 21.02.18)<br />
<br />
Sam Skipsey (16 - 18.07.17)<br />
<br />
Terry Froy<br />
<br />
Vip Davda (2 - 12.12.17)<br />
<br />
Brian Davies (16 - 16.05.17)<br />
<br />
Left:<br />
Andrew Lahiff (1 - 6.12.16)<br />
<br />
=== Action list ===<br />
<br />
Please put the new issues at the top. <br />
<br />
{|border="1" cellpadding="1"<br />
|+<br />
<br />
|-style="background:#7C8AAF;color:white"<br />
!Action ID<br />
!Action description<br />
!Owner<br />
!Target date<br />
!Status<br />
!Date closed<br />
!Notes<br />
<br />
<br />
|-<br />
|O-171031-01<br />
|Update IPv6 table on Wiki<br />
|All sites<br />
|<br />
|Open<br />
|<br />
|Table is at https://www.gridpp.ac.uk/wiki/IPv6_site_status RAL and Durham to check their entries are upto date and change the updated date<br />
<br />
<br />
|-<br />
|O-171031-03<br />
| Organise core ops meeting<br />
|Jeremy Coles<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
<br />
<br />
<br />
<br />
|-<br />
|O-170711-04<br />
|Check if gridpp support list membership is good enough so clients get responses.<br />
|Jeremy Coles<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
<br />
<br />
<br />
<br />
|-<br />
|O-170711-07<br />
|Help JM (Sussex) with updating PerfSonar to C7 with data transfer procedure (and perhaps give Iperf3 box that he can play with. )<br />
|Duncan Rand<br />
|<br />
|Open<br />
|<br />
|Sussex hope to re-image with CentOS7 soon.<br />
<br />
|-<br />
|O-170131-01<br />
|Enquire if Docker is run in privileged mode at IISAS-GPUCloud.<br />
|Jeremy Coles<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
<br />
<br />
|-<br />
|O-160524-02<br />
|Look at the storage page on the GridPP wiki to see if it is up to date<br />
|Sam<br />
|2016-06-30<br />
|Open<br />
|(not high priority)<br />
|<br />
<br />
<br />
<br />
<br />
<br />
|-<br />
|O-161108-00<br />
|Review VOs in Incubator page, in an attempt to make the process less sisyphean.<br />
|Many<br />
|31-01-17<br />
|Open<br />
|<br />
| https://www.gridpp.ac.uk/wiki/GridPP_VO_Incubator - Could we archive the completed items on this page ? Not sure they are useful, except for writing the odd bit of funding please. T2K should be added back to this list, Sno+ contact details should be changed to David Auty, SKA to be added to the list. All VOs should be double checked, contacts re-poked if necessary and possibly the status as a Incubator VO re-evaluated. The exceptions seems to be LZ - who are doing well.<br />
<br />
|}<br />
<br />
* From 24th January:<br />
* ACTION: set up table for storage to track recommendations.<br />
* ACTION: Request for sites to publish storage accounting.<br />
* ACTION: JC to contact fusion VO admins and confirm.<br />
<br />
See also: [[Operations Team Completed Actions]] and [[Operations Issues ]]. (The Operations Issues page has never been used. Can be abandoned ?)<br />
<br />
See also the archived: [[Deployment Team Completed Actions]] and [[Deployment Issues ]].<br />
<br />
[[Category:GridPP Operations]]</div>
Gordon Stewart d88945c56d
https://www.gridpp.ac.uk/wiki/Operations_Team_Action_items
Operations Team Action items
2017-08-08T11:03:41Z
<p>Gordon Stewart d88945c56d: </p>
<hr />
<div>=== Count list for minute taking === <br />
<br />
Works top -> bottom. Vidyo meeting = 1: F2F meeting = 5 (count - last time minutes taken in brackets)<br />
<br />
Minutes can be found at: [http://indico.cern.ch/category/4592/ Operations]<br />
<br />
Alessandra Forti (15 - 25.10.16)<br />
<br />
Andy Washbrook (1 - 29.11.16)<br />
<br />
Andrew McNab (15 - 27.09.16)<br />
<br />
Andrew Lahiff (1 - 6.12.16)<br />
<br />
Chris Brew (1 - 7.2.17)<br />
<br />
Daniela Bauer (16 - 06.06.2017)<br />
<br />
Dan Traynor (15 - 20.12.16)<br />
<br />
David Crooks (16 - 26.06.17)<br />
<br />
Duncan Rand (16 - 15.11.2016)<br />
<br />
Elena Korolkova<br />
<br />
Gareth Roy (15 - 4.10.16)<br />
<br />
Gordon Stewart (2 - 08.08.2017)<br />
<br />
Govind Songara (1 - 17.1.17)<br />
<br />
Ian Loader (1 - 9.5.17)<br />
<br />
Ian Neilson (1 - 24.1.17)<br />
<br />
Jeremy Coles (15 - 12.01.16)<br />
<br />
John Bland (1 - 31.1.17)<br />
<br />
John Hill (1 - 07.03.17)<br />
<br />
Kashif Mohammad (16 - 25.04.17)<br />
<br />
Matt Doidge (19 - 25.07.17)<br />
<br />
Oliver Smith (1 - 14.02.17)<br />
<br />
Winnie Lacesso<br />
<br />
Pete Gronbech (16 - 21.02.17)<br />
<br />
Raul Lopes (14- 05.07.2016)<br />
<br />
Raja Nandakumar<br />
<br />
Robert Currie (1 - 10.1.17)<br />
<br />
Robert Frank (1 - 02.05.17)<br />
<br />
Steve Jones (18 - 11.07.17)<br />
<br />
Sam Skipsey (16 - 18.07.17)<br />
<br />
Terry Froy<br />
<br />
Vip Davda (1 - 21.03.17)<br />
<br />
Brian Davies (16 - 16.05.17)<br />
<br />
=== Action list ===<br />
<br />
Please put the new issues at the top. <br />
<br />
{|border="1" cellpadding="1"<br />
|+<br />
<br />
|-style="background:#7C8AAF;color:white"<br />
!Action ID<br />
!Action description<br />
!Owner<br />
!Target date<br />
!Status<br />
!Date closed<br />
!Notes<br />
<br />
<br />
<br />
|-<br />
|O-170711-01<br />
|May take over as GalDyn contact.<br />
|Robin Long (Lancs)<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
|-<br />
|O-170711-02<br />
|Look into why scheduling at Sussex does not allow GridPP Dirac since 12th June at Sussex<br />
|Jeremy Maris<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
|-<br />
|O-170711-03<br />
|look at help for CERNAtSchool to run GPU jobs.<br />
|Dan Traynor, QMUL<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
|-<br />
|O-170711-04<br />
|Check if gridpp support list membership is good enough so clients get responses.<br />
|Jeremy Coles<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
|-<br />
|O-170711-05<br />
|RAL should review accounting, problems at every step. Multiple queues not accounting well. GGUS ticket to come.<br />
|Andrew Lahiff<br />
|<br />
|Open<br />
|<br />
|The problem is well understood - jobs running at RAL which use Echo are considered by ATLAS to be a separate Tier-3 site, and not part of RAL-LCG2. RAL APEL accounting of course includes both Echo and CASTOR jobs.<br />
<br />
|-<br />
|O-170711-06<br />
|To find explanation of network monitoring problems, esp. why no data after Liverpool Perfsonar re-installed. <br />
|Duncan Rand<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
|-<br />
|O-170711-07<br />
|Help JM (Sussex) with updating PerfSonar to C7 with data transfer procedure (and perhaps give Iperf3 box that he can play with. )<br />
|Duncan Rand<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
|-<br />
|O-170131-01<br />
|Enquire if Docker is run in privileged mode at IISAS-GPUCloud.<br />
|Jeremy Coles<br />
|<br />
|Open<br />
|<br />
|<br />
<br />
|-<br />
|O-170124-01<br />
|Create wiki table tracking recommendations for sites from Jan-17 ATLAS jamboree (https://indico.cern.ch/event/607462/contributions/2448017/attachments/1400779/2137726/JamboreeJan2017.pdf)<br />
|Sam for storage, Alessandra<br />
|<br />
|Open<br />
|<br />
|Page created, there are several things accumulating about storage needs discussion.<br />
<br />
<br />
|-<br />
|O-160524-02<br />
|Look at the storage page on the GridPP wiki to see if it is up to date<br />
|Sam<br />
|2016-06-30<br />
|Open<br />
|(not high priority)<br />
|<br />
<br />
<br />
<br />
|-<br />
|O-160920-01<br />
|Sites to review adding modeal VO.<br />
|All sites.<br />
|04-10-16<br />
|Open<br />
| <br />
|Sites are asked to consider supporting moedal VO at Tom's request. Good opportunity to look at supporting cernatschool (or other VOs) too. https://operations-portal.egi.eu/vo/view/voname/vo.moedal.org<br />
<br />
<br />
|-<br />
|O-161108-00<br />
|Review VOs in Incubator page, in an attempt to make the process less sisyphean.<br />
|Many<br />
|31-01-17<br />
|Open<br />
|<br />
| https://www.gridpp.ac.uk/wiki/GridPP_VO_Incubator - Could we archive the completed items on this page ? Not sure they are useful, except for writing the odd bit of funding please. T2K should be added back to this list, Sno+ contact details should be changed to David Auty, SKA to be added to the list. All VOs should be double checked, contacts re-poked if necessary and possibly the status as a Incubator VO re-evaluated. The exceptions seems to be LZ - who are doing well.<br />
<br />
|}<br />
<br />
* From 24th January:<br />
* ACTION: set up table for storage to track recommendations.<br />
* ACTION: Request for sites to publish storage accounting.<br />
* ACTION: JC to contact fusion VO admins and confirm.<br />
<br />
See also: [[Operations Team Completed Actions]] and [[Operations Issues ]]. (The Operations Issues page has never been used. Can be abandoned ?)<br />
<br />
See also the archived: [[Deployment Team Completed Actions]] and [[Deployment Issues ]].<br />
<br />
[[Category:GridPP Operations]]</div>
Gordon Stewart d88945c56d
https://www.gridpp.ac.uk/wiki/Operations_Team_Action_items
Operations Team Action items
2016-12-13T12:35:05Z
<p>Gordon Stewart d88945c56d: </p>
<hr />
<div>=== Count list for minute taking === <br />
<br />
Works top -> bottom. Vidyo meeting = 1: F2F meeting = 5 (count - last time minutes taken in brackets)<br />
<br />
Minutes can be found at: [http://indico.cern.ch/category/4592/ Operations]<br />
<br />
Alessandra Forti (15 - 25.10.16)<br />
<br />
'''Andy Washbrook'''<br />
<br />
Andrew McNab (15 - 27.09.16)<br />
<br />
Andrew Lahiff<br />
<br />
Brian Davies (15 - 09.08.16)<br />
<br />
Daniela Bauer (15 - 23.08.16)<br />
<br />
Dan Traynor (14 - 28.6.16)<br />
<br />
David Crooks (15 - 14.06.16)<br />
<br />
Duncan Rand (16 - 15.11.2016)<br />
<br />
Elena Korolkova<br />
<br />
Gareth Roy (15 - 4.10.16)<br />
<br />
Gordon Stewart (1 - 13.12.2016)<br />
<br />
Govind Songara<br />
<br />
Ian Loader<br />
<br />
Jeremy Coles (15 - 12.01.16)<br />
<br />
John Bland<br />
<br />
John Hill<br />
<br />
Kashif Mohammad (15 - 19.07.16)<br />
<br />
Marcus Ebert<br />
<br />
Matt Doidge (17 - 08.11.16)<br />
<br />
Oliver Smith<br />
<br />
Winnie Lacesso<br />
<br />
Pete Gronbech (15 - 13.09.16)<br />
<br />
Raul Lopes (14- 05.07.2016)<br />
<br />
Raja Nandakumar<br />
<br />
Robert Currie<br />
<br />
Robert Frank<br />
<br />
Steve Jones (17 - 18.10.16)<br />
<br />
Sam Skipsey (15 - 31.05.16)<br />
<br />
Terry Froy<br />
<br />
Tom Whyntie<br />
<br />
[About to be archived!<br />
<br />
IN: Daniela=15 (23.08.16), Dan=14(28.6.16), Raul=14 (05.07.2016), Jeremy=15 (12.01.16), Sam=15 (31.05.16), David=15 (14.06.16), Duncan=16 (15.11.2016), Kashif=15 (19.07.16), Brian=15 (09.08.16), Pete=15 (13.09.16), AndrewM=15 (27.09.16), Stephen=17 (18.10.16),Gareth=15 (4.10.16), Alessandra=15 (25.10.16), MattD =17 (08.11.16)<br />
<br />
<br />
OUT: Mark=6 Chris=9 Wahid=11 Ewan=13 ]<br />
<br />
=== Action list ===<br />
<br />
Please put the new issues at the top. <br />
<br />
{|border="1" cellpadding="1"<br />
|+<br />
<br />
|-style="background:#7C8AAF;color:white"<br />
!Action ID<br />
!Action description<br />
!Owner<br />
!Target date<br />
!Status<br />
!Date closed<br />
!Notes<br />
<br />
<br />
|-<br />
|O-160524-02<br />
|Look at the storage page on the GridPP wiki to see if it is up to date<br />
|Sam<br />
|2016-06-30<br />
|Open<br />
|(not high priority)<br />
|<br />
<br />
|-<br />
|O-150327-02<br />
|Put Northgrid VO and other regionals in VO Nagios project<br />
|Kashif, Alessandra<br />
|27-06-2015<br />
|on going (Kashif will try and ask (23/08/2016)<br />
| <br />
| <s>Discuss whether all the regional VOs should be in this project.</s> All four regional VOs should be supported in VO Nagios in principle, but implementation is not urgent. There is now less emphasis on the regional VOs and it is technically difficult to add them due to the lack of current support of the SAM nagios project and the wish to not beak the existing setup. On hold as of 19/1/2016. Action moved to ARGO https://ggus.eu/?mode=ticket_info&ticket_id=123604 <br />
<br />
|-<br />
|O-160712-01<br />
|Jeremy to investigate Indico options for uploading minutes.<br />
|Jeremy<br />
|<br />
|Closed<br />
| <br />
|Minutes can be pasted into the header or uploaded with CERN linked accounts. For those without any CERN link the minutes will (as before) need to be emailed to Jeremy<br />
<br />
|-<br />
|O-160920-01<br />
|Sites to review adding modeal VO.<br />
|All sites.<br />
|04-10-16<br />
|Open<br />
| <br />
|Sites are asked to consider supporting moedal VO at Tom's request. Good opportunity to look at supporting cernatschool (or other VOs) too. https://operations-portal.egi.eu/vo/view/voname/vo.moedal.org<br />
<br />
<br />
|-<br />
|O-160920-02<br />
|Sam to liase with Kashif/Alastair regarding Oxford atlas "diskless site" testing.<br />
|Sam <br />
|04-10-16<br />
|Open<br />
|<br />
|Self explanatory action!<br />
<br />
|-<br />
|O-161108-00<br />
|Review VOs in Incubator page, in an attempt to make the process less sisyphean.<br />
|Many<br />
|31-01-17<br />
|Open<br />
|<br />
| https://www.gridpp.ac.uk/wiki/GridPP_VO_Incubator - T2K should be added back to this list, Sno+ contact details should be changed to David Auty, SKA to be added to the list. All VOs should be double checked, contacts re-poked if necessary and possibly the status as a Incubator VO re-evaluated. The exceptions seems to be LZ - who are doing well.<br />
<br />
|}<br />
<br />
See also: [[Operations Team Completed Actions]] and [[Operations Issues ]]. (The Operations Issues page has never been used. Can be abandoned ?)<br />
<br />
See also the archived: [[Deployment Team Completed Actions]] and [[Deployment Issues ]].<br />
<br />
[[Category:GridPP Operations]]</div>
Gordon Stewart d88945c56d