RAL Tier1 weekly Operations Grid 20130225

From GridPP Wiki
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Andrew

  • Last week:
    • FTS2.2.9 verfication/staged-rollout [ongoing]
    • Preparations for capacity signoff meeting [ongoing]
    • Batch system testing [ongoing]
    • GridPP Cloud cms testing
    • CMS reprocessing
  • Coming week:
    • Preparations for capacity signoff meeting
    • FTS2.2.9 verfication/staged-rollout
    • Batch system testing
    • CMS reprocessing

Catalin

  • Last week
    • cvmfs stratum-0 fine tuning
    • work on various GGUS tickets
  • This week
    • update job plans
    • look into EMI-2 SL6 migration for siteBDII, L&B, LFC

Ian

  • Last week:
    • Ceph S3 Storage
    • Cloud discussions
    • Grappling with travel bookings
  • Coming week:
    • Aquilon-Icinga workshop (at RAL)
    • Organise kick off for Public Engagement Committee
    • Ceph S3 testing
    • Set up[ accounts for Wahid

James

  • Last Week
  • This Week

Orlin

  • Last Week
    • Move the gridWN and gridTest queues to EMI2/SL6 CREAMCE lcgce07 [done]
    • Install & Test EMI2/SL6 WNs on the gridSL6 queue [testing ongoing]
    • Clean up & optimize quattor configuration for EMI2/SL6 WNs [done]
    • Install & Modify some EMI2/SL6 Worker Nodes in a TEST cluster [done]
    • Bring the Testbed back in order, check the list of services [ongoing]
    • Install & Test Latest EMI2 update for SL5 production WNs [testing ongoing]
    • Learn more about Cloud computing - Open Nebula; EC2; OpenStack & do some tests [ongoing]
    • Prepare & Install Open Nebula on a physical host suitable for virtualization [ongoing]
  • This Week
    • Upgrade and Test the latest CREAMCE update [to do]
    • Bring the Testbed back in order, check the list of services [ongoing]
    • Install & Test Latest EMI2 update for SL5 production WNs [testing ongoing]
    • Learn more about Cloud computing - Open Nebula; EC2; OpenStack & do some tests [ongoing]
    • Prepare & Install Open Nebula on a physical host suitable for virtualization [ongoing]
    • 27 Feb - 10 March A/L

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Grid OnCall: Catalin (Mon- Sun)
  • Primary OnCall Ian (Mon-Sun)

Absences

Andrew - Tues A/L

Orlin - Wed - Fri A/L

James - Fri A/L

Ian - Thurs PM A?L