RAL Tier1 weekly Operations Grid 20130225
From GridPP Wiki
Contents
Operational Issues
Description | Start | End | Affected VO(s) | Severity | Status |
---|---|---|---|---|---|
Downtimes
Description | Hosts | Type | Start | End | Affected VO(s) |
---|---|---|---|---|---|
Blocking Issues
Description | Requested Date | Required By Date | Priority | Status |
---|
Developments/Plans
Highlights for Tier-1 Ops Meeting
Highlights for Tier-1 VO Liaison Meeting
Detailed Individual Reports
Andrew
- Last week:
- FTS2.2.9 verfication/staged-rollout [ongoing]
- Preparations for capacity signoff meeting [ongoing]
- Batch system testing [ongoing]
- GridPP Cloud cms testing
- CMS reprocessing
- Coming week:
- Preparations for capacity signoff meeting
- FTS2.2.9 verfication/staged-rollout
- Batch system testing
- CMS reprocessing
Catalin
- Last week
- cvmfs stratum-0 fine tuning
- work on various GGUS tickets
- This week
- update job plans
- look into EMI-2 SL6 migration for siteBDII, L&B, LFC
Ian
- Last week:
- Ceph S3 Storage
- Cloud discussions
- Grappling with travel bookings
- Coming week:
- Aquilon-Icinga workshop (at RAL)
- Organise kick off for Public Engagement Committee
- Ceph S3 testing
- Set up[ accounts for Wahid
James
- Last Week
- This Week
Orlin
- Last Week
- Move the gridWN and gridTest queues to EMI2/SL6 CREAMCE lcgce07 [done]
- Install & Test EMI2/SL6 WNs on the gridSL6 queue [testing ongoing]
- Clean up & optimize quattor configuration for EMI2/SL6 WNs [done]
- Install & Modify some EMI2/SL6 Worker Nodes in a TEST cluster [done]
- Bring the Testbed back in order, check the list of services [ongoing]
- Install & Test Latest EMI2 update for SL5 production WNs [testing ongoing]
- Learn more about Cloud computing - Open Nebula; EC2; OpenStack & do some tests [ongoing]
- Prepare & Install Open Nebula on a physical host suitable for virtualization [ongoing]
- This Week
- Upgrade and Test the latest CREAMCE update [to do]
- Bring the Testbed back in order, check the list of services [ongoing]
- Install & Test Latest EMI2 update for SL5 production WNs [testing ongoing]
- Learn more about Cloud computing - Open Nebula; EC2; OpenStack & do some tests [ongoing]
- Prepare & Install Open Nebula on a physical host suitable for virtualization [ongoing]
- 27 Feb - 10 March A/L
VO Reports
ALICE
ATLAS
CMS
LHCb
OnCall/AoD Cover
- Grid OnCall: Catalin (Mon- Sun)
- Primary OnCall Ian (Mon-Sun)
Absences
Andrew - Tues A/L
Orlin - Wed - Fri A/L
James - Fri A/L
Ian - Thurs PM A?L