RAL T1 weekly ops Fabric 20110919
From GridPP Wiki
Contents
Developments
- All:
- Tim:
- James A:
- Cheney
- upgrading acsls and solaris
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Decommissioning old disk servers/batch systems. (Viglen 2006 started)
- Phone conversation with Dave Power of Viglen about SMART errors on Viglen 2009 disk servers.
- one-test (chris's machine) not accessible. Intervene with Philip Kershaw.
- Ticket created for change control of Viglen 2007 AMD firmware update.
- gdss296 re-created raid array. Started initializing all drives.
- Arranged collection with DHL and SGI.
- gdss487 took out of production to see replacement drive.
- Martin:
- Ian:
Operational Issues and Incidents
Index | Description | Start | End | Severity | Affected VO(s) |
---|
Summary of plans for week ahead
Scheduled and Cancelled Down Times
Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB
Component | Description | Start | End | Affected VO(s) | Type |
---|
Development priorities
- All
- Tim:
- Cheney
- James A:
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Hardware failure review and metrics continue.
- Continuous decommissioning old disk servers/batch systems.(R 27)(Viglen 2006 decommission started)
- Continue Labelling racks and systems in UPS and HPD room.
- Martin:
- Ian:
Absences