RAL Tier1 Production Team Report for 9th August 2010.
AoD This Week
Mon: Tiju Tues: James T. Wed: Gareth Thu & Fri: John
Last week
- Gareth: AoD (2 days), updated Post Mortem script, looked at EMCvUPS options, my metrics, e-Science Services Co-ordination review of JiscMail.
- John: A/L (3 days)
- Tiju: AoD (3 days), Modem script,understanding iSCSI
Changes to Operating procedures
- Revised Post Mortem Template.
Declared Outages in GOC DB
None.
Advanced Warning
- Day not specified: Test of seal under 1st floor kitchen.
- Next week - WMS03 update.
Other Changes
- Fabric:
- Double the network link to the tape robot stack (stack 12), postponed from the last TS. (Requires Castor stop).
- Swap out the older of the pair of SAN switches in the Tier1 Oracle databases for its new replacement. (Requires FTS, LFC, 3D stop).
- New kernels and glibc updates on non-castor Oracle RAC nodes. (Done for LUGH).
- Updates to amanda backup - unblocking possible other updates.
- Database:
- Re-visit non-Castor database mulitpathing
- Grid Services:
- Worker node update (to latest glite version).
- Castor:
- Possible SRM update
- Networks:
- Commissioning OPN link