Operations Report 16/01/2012
From GridPP Wiki
Contents
Summary of Previous Week
- 3D: Testing 11g Upgrade
- CASTOR: Preparing upgraded SRM schemas
Operational Issues and Incidents
- N/A
Plans for Week(s) Ahead
- 3D: 11g Upgrade
- CASTOR: Testing 2.1.11 upgrade on production snapshots
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|---|---|---|---|
3D 11g Upgrade | 18/01/2011 09:00 | 18/01/2011 16:00 | ATLAS | Downtime |
Development Priorities
- Test and migrate to new HW
- Migrate to 11G
- GC resilience
Requirements and Blocking Issues
- None
OnCall
- Carmine
Absences
- N/A