Operations Report 14/03/2011
From GridPP Wiki
Contents
Summary of Previous Week
- CASTOR: Nameserver (production) Upgraded to 2.1.10
- CASTOR: Repack (production) Upgraded to 2.1.9-6
- CASTOR: Pool merge is done
Operational Issues and Incidents
- None
Plans for Week(s) Ahead
- CASTOR,3D,LFC,FTS: Switch to UPS Power
- CASTOR: Test Data Guard (dependent on hardware from Fabric)
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|---|---|---|---|
UPS Power Switchover | 08:00 | 13:00 | All | Upgrade (Planned) |
Development Priorities
- Test and migrate to new HW
Requirements and Blocking Issues
- Waiting for hardware for Tier1 Data Guard testing
OnCall
- Keir
Absences
- All: Friday (Group away day - available via email or mobiles)