Operations Report 09/05/2011
From GridPP Wiki
Contents
Summary of Previous Week
- CASTOR: Fixed splitting Services
- CASTOR: Tested quarterly patches (+ CERN recommended) on Pre-Prod
- CASTOR: Installing new RAC in ATLAS building for Data Guard testing
- CASTOR: Adjusting alerts from Grid Control for blocking session problems
- CASTOR: Applied quarterly patches to Neptune production RAC
- CASTOR: Installed schemas for the Name Server reports
- 3D: Tested patches
- FTS/LFC: Tested patches
Operational Issues and Incidents
- Uranus (DLF server) down (intermittent SCSI errors)
Plans for Week(s) Ahead
- CASTOR: Install Oracle on new hardware in ATLAS (once switched is replaced)
- CASTOR: GEN SRM Upgrade (Tuesday)
- 3D: Patching
- LFC/FTS:Patching
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|---|---|---|---|
3D Patching | 10/05/11 at 09:00am | 10/05/11 at 11:00am | ATLAS and LHCb | At Risk |
LFC/FTS patching | 12:00pm | 02:00pm | All | At Risk |
Development Priorities
- Test and migrate to new HW
Requirements and Blocking Issues
- Waiting for hardware for Tier1 Data Guard testing
OnCall
- Carmine
Absences
- Rich - Wednesday/Thursday
- Keir - Thursday