Operations Report 19/12/2011
From GridPP Wiki
Revision as of 14:19, 19 December 2011 by Richard sinclair (Talk | contribs)
Contents
Summary of Previous Week
- 3D: Plan to upgrade to 11g (23rd to 26th January 12)
- CASTOR: ATLAS SRM now running on new production hardware
- CASTOR: DLF partitioning now fixed
Operational Issues and Incidents
- CASTOR: Neptune3 instance suffered extremely high load (decision take to migrate ATLAS SRM)
- CASTOR: Pluto database hang while trying to recompile invalid object
Plans for Week(s) Ahead
- CASTOR: Testing production schema dumps with 2.1.11 upgrade scripts
- 3D: Testing 11g upgrade
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|
Development Priorities
- Test and migrate to new HW
- Migrate to 11G
- GC resilience
Requirements and Blocking Issues
- None
OnCall
- Rich until the 28th Dec
- Carmine: 29Dec-08Jan
Absences
Keir: whole week Carmine: Wed-Fri Eddy: Thu All: back on the 3rd Jan