RAL T1 weekly ops Fabric 20111031

From GridPP Wiki
Revision as of 18:24, 31 October 2011 by Kashif hafeez (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Developments

  • All:
  • Tim:
  • James A:
  • Cheney
    • meeting with mark van de sanden
    • fix oracle backups
    • edit out unused partition from oracle backups
    • fix ctsd12
    • fix castor201
    • amanda rollout
    • edit firewall rules
    • upgrade acsss to 8.0.2
    • fix zora firewall rule problem
    • remove conflicting amanda package
    • fix xen backup
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Decommissioning old disk servers/batch systems. (Viglen 2006 started)
    • gdss296 failed acceptance test.
    • Updating wiki page about how to report fault to Vendors.
    • gdss540 reporting abnormal battery temperature after firmware update.
    • gdss456 started 7 days acceptance testing.
    • lcgcts13 updated firmware and re-install. (fixed) moved back into rack.
    • gdss538 given back to Castor team for preprod.
    • gdss396 failed acceptance test.
    • gdss295 failed acceptance test.
    • Change control for updating firmware on Adaptec controllers on Viglen 2009 disk servers accepted.
    • Updated firmware on d0t1 disk servers in Viglen 2009 generation.


  • Martin:
  • Ian:


Operational Issues and Incidents

Index Description Start End Severity Affected VO(s)

Summary of plans for week ahead

Scheduled and Cancelled Down Times

Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB

Component Description Start End Affected VO(s) Type

Development priorities

  • All
  • Tim:
  • Cheney
    • Continue amanda rollout for ads shutdown
    • confer with db group on iptables rules
  • James A:
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Hardware failure review and metrics continue.
    • Continuous decommissioning old disk servers/batch systems.(R 27)
    • Continue Labelling racks and systems in UPS and HPD room.


  • Martin:
  • Ian:

Absences


Fabric On-Call

  • Kashif (Monday to Sunday)

Advanced Warning of Requirements and Blocking issues

Services Issues


RAL Tier1 weekly operations fabric

Category:RAL_Tier1