Operations Report 07/03/2011

From GridPP Wiki
Revision as of 13:36, 7 March 2011 by Richard sinclair (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Summary of Previous Week

  • CASTOR: Nameserver upgrade testing
  • CASTOR: Upgraded pre-prod schemas to 2.1.10
  • LFC: Testing ATLAS disk pool merging

Operational Issues and Incidents

  • None

Plans for Week(s) Ahead

  • LFC: ATLAS Disk Pool Merging
  • CASTOR: Nameserver upgrade

Downtimes and At Risk

Description Start End Affected VO(s) Type
CASTOR NS Upgrade 08:00 16:00 All Upgrade (Planned)

Development Priorities

  • Test and migrate to new HW

Requirements and Blocking Issues

  • Waiting for hardware for Tier1 Data Guard testing


OnCall

  • Rich

Absences

  • Keir - All Week
  • Eter - Tuesday - Friday