RAL Tier1 weekly operations Grid 20110214
From GridPP Wiki
Revision as of 13:45, 15 February 2011 by Richard hellier (Talk | contribs)
Contents
Operational Issues
Description | Start | End | Affected VO(s) | Severity | Status |
---|---|---|---|---|---|
Downtimes
Description | Hosts | Type | Start | End | Affected VO(s) |
---|
Blocking Issues
Description | Requested Date | Required By Date | Priority | Status |
---|---|---|---|---|
Developments/Plans
Highlights for Tier-1 Ops Meeting
Highlights for Tier-1 VO Liaison Meeting
Detailed Individual Reports
Alastair
- Working on ATLAS permission change. [On hold]
- Setting up xrootd for ATLAS at RAL.
- Disk pool merging and DB change.
- Preparing for Beauty 2011 conference.
- File consistency checking.
Andrew
- CMS condor training 14-15 Feb
- Capacity planning system [Ongoing]
- Wrote PhEDEx installation documentation [Done]
- Migration testing with default policies
- Plan changing CMS squid names [To do]
- CMS data ops
- Data skims at KIT
- MC rereco, MC rereco preproduction at IN2P3, FNAL
Catalin
- involved with CREAM CEs installation and configuration [ongoing]
- update Grid Services documentation (WMS, Frontier) [done]
- work on 'pheno' issues with WMS job submission [done]
Derek
- Investigating whole node jobs effect on scheduler [done]
- Reviewing CE documentation [done]
- Tidying up/Finishing off in preparation for 2 weeks A/L [done]
Matt
- Update CRL checks Nagios plugin. [New]
- Look at Derek's CA patch for Quattor. [New]
- First phase of migration of FTS agents to Quattorised h/w. [New]
- Test new implementation plan for FTS Group config. [Done]
- Prepare FTS hardware for Agent Quattorisation. [Done]
- Review VOBOX/CE incident. [Ongoing]
Richard
- Added new glite updates 21 and 22 into Quattor. Currently building a test top BDII to check the updates. [Ongoing]
- Moving 1 site and 1 top BDII into UPS room for increased resilience. [Ongoing]
- Trying out new hypervisor (hv-10) to see how much performance has improved (have moved an existing VM across to the new h/v) [Ongoing].
- Building an ARGUS server using the new QWG templates [Ongoing]
- Working on the "team status page" being developed as an action from team awayday [Ongoing]
- Reviewing G/S process documentation [Ongoing]
- CASTOR items:
- Working with SDW to import latest CASTOR quattor structure into the "cert-in-a-box" cluster. [Ongoing]
VO Reports
ALICE
ATLAS
CMS
LHCb
OnCall/AoD Cover
- Primary OnCall: Catalin
- Grid OnCall:
- AoD: