Operations Report 20/09/2010

From GridPP Wiki
Revision as of 08:38, 20 September 2010 by Eter pani (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Summary of Previous Week

  • CASTOR: Started to look at Chris stress testing script
  • 3D: Helping SARA to synchronize their DB
  • MySQL: prepared server LCGSQL-s3-12
  • Installing RAL TAGs system

Operational Issues and Incidents

Plans for Week(s) Ahead

  • CASTOR: Work on Chris script
  • DB services: install RAL TAGs
  • LFC/FTS: Update the ACL on Somnus
  • MySQL: testing help desk with server LCGSQL-s3-12
  • Installing RAL TAGs system

Downtimes and At Risk

Description Start End Affected VO(s) Type

Development Priorities

  • Install ATLAS TAGs to 64bit systems

Requirements and Blocking Issues

  • Waiting for new hardware for CASTOR databases


OnCall

  • Eter

Absences

  • Rich: the whole week
  • Eter: the whole week except Friday