Operations Report 12/07/2010
From GridPP Wiki
Revision as of 12:31, 12 July 2010 by Carmine cioffi (Talk | contribs)
Contents
Summary of Previous Week
- CASTOR: Reinstalled DLF on PreProd
- CASTOR: Reboots of nodes to fix read only file systems
- CASTOR: Work on going for the schema cleanup plan
- LFC/FTS: The test to check the ACL list of nodes that can connect to the database(Somnus) is done
- DB Services: RMAN test recovery script to automatically check database backup is done (version v1.0)
Operational Issues and Incidents
None
Plans for Week(s) Ahead
- CASTOR: Plan Schema Clean Ups (to be carried out before 2.1.9 upgrade)
- DB Services: Install the new Grid Control
- DB Services: Modify the RMAN test recovery script to work with database backup files on tape
- FTS/LFC: Plan to migrate to a single disk array
- 3D (Ogma): Roll out multipath configuration
Downtimes and At Risk
None
Development Priorities
- Install ATLAS TAGs to 64bit systems
- Investigate hardware architecture, backup and recovery strategy, resilience and validation of restored backup.
- Automate restoration of database backup files from tape
Requirements and Blocking Issues
- Waiting for new hardware for CASTOR databases
- Waiting for test environment to test new multipath configuration
OnCall
- Rich
Absences
- Eter: Tuesday