RAL Tier1 weekly operations castor 30/09/2016
From GridPP Wiki
Revision as of 10:31, 30 September 2016 by George Patargias c592d6dd61 (Talk | contribs)
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Castor 2.1.15 2. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
gdss677 (cmsTape) and gdss739 (lhcbDst) failed and went out of prod
puppetdev failed
A number of facilities tape drives were down
Operation news
The firmware was upgraded on gdss662 (atlasTape) and gdss655, gdss656, gdss657 and gdss673 (lhcbRawDst) RT175801