Difference between revisions of "RAL Tier1 weekly operations castor 03/08/2018"
(Created page with "== Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not ...") |
|||
Line 31: | Line 31: | ||
== Operation problems == | == Operation problems == | ||
− | * | + | * gdss772 went out prod |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
== Operation news == | == Operation news == | ||
− | * | + | * CIP is *actually* decommissioned |
+ | |||
+ | * Draining of 2014 ds from cmsDisk and atlasStripInput is in progress | ||
== Plans for next few weeks == | == Plans for next few weeks == | ||
* Push gsi authentication for xrootd in production | * Push gsi authentication for xrootd in production | ||
+ | |||
+ | * Decommission gdss747 | ||
== Long-term projects == | == Long-term projects == | ||
Line 50: | Line 50: | ||
Things need doing: log rotation, preparation in aquilon for new instance,... | Things need doing: log rotation, preparation in aquilon for new instance,... | ||
− | |||
− | |||
== Actions == | == Actions == | ||
Line 63: | Line 61: | ||
== Staffing == | == Staffing == | ||
− | + | GP on call |
Latest revision as of 09:51, 3 August 2018
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. SL5 elimination from CIP and tape verification server 2. CASTOR stress test improvement 3. Generic CASTOR headnode setup 4. Aquilonised headnodes
5. Special topics
6. Actions
7. Review Fabric tasks
1. Link
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
* gdss772 went out prod
Operation news
* CIP is *actually* decommissioned
* Draining of 2014 ds from cmsDisk and atlasStripInput is in progress
Plans for next few weeks
* Push gsi authentication for xrootd in production
* Decommission gdss747
Long-term projects
Oracle installation on Eris complete
Things need doing: log rotation, preparation in aquilon for new instance,...
Actions
JK to investigate why ralreplicas fails and submit a "bug" report
RA/BD: Run GFAL unit tests against CASTOR. Get them here: https://gitlab.cern.ch/dmc/gfal2/tree/develop/test/
GP/RA to write a Nagios test to check for large number of requests on the NewRequests DB table that remain for a long time - the check will run every xxx min (to be aggreed with Production) and issue an alarm if the number exceeds 1,000 for an extended period of time (15 min)
Staffing
GP on call