Difference between revisions of "Staged rollout emi3"
(→Staged Rollout EMI3:) |
(→Notes:) |
||
(2 intermediate revisions by one user not shown) | |||
Line 95: | Line 95: | ||
|- | |- | ||
! MyProxy | ! MyProxy | ||
− | | [http://www.eu-emi.eu/releases/emi-3-montebianco/products/-/asset_publisher/5dKm/content/glite-proxyrenewal-2 Proxy] || | + | | [http://www.eu-emi.eu/releases/emi-3-montebianco/products/-/asset_publisher/5dKm/content/glite-proxyrenewal-2 Proxy] || Can't find report. Probably filed under something else. || RAL-LCG2, UKI-LT2-IC-HEP || RAL-LCG2 |
|} | |} | ||
Line 119: | Line 119: | ||
'''UKI-SCOTGRID-ECDF''': Middleware Testing WG for DPM and ATLAS. Future unclear with Wahid leaving. | '''UKI-SCOTGRID-ECDF''': Middleware Testing WG for DPM and ATLAS. Future unclear with Wahid leaving. | ||
+ | |||
+ | '''UKI-SCOTGRID-GLASGOW''': For DPM, Sam is trying out new versions of DPM but that’s working with the product team so I’m not sure if that counts as Staged Rollout as it’s the step before that. | ||
'''UKI-SOUTHGRID-OX-HEP''': We are not involved in Staged Rollout process as such but we do test stuff from time to time. I recently tested pre-release version of SAM-Nagios (SR report [https://documents.egi.eu/public/ShowDocument?docid=2355 here]) and Ewan is involved in dpm testing. <br> | '''UKI-SOUTHGRID-OX-HEP''': We are not involved in Staged Rollout process as such but we do test stuff from time to time. I recently tested pre-release version of SAM-Nagios (SR report [https://documents.egi.eu/public/ShowDocument?docid=2355 here]) and Ewan is involved in dpm testing. <br> | ||
Line 128: | Line 130: | ||
UKI-NORTHGRID-SHEF-HEP <br> | UKI-NORTHGRID-SHEF-HEP <br> | ||
UKI-NORTHGRID-LIV-HEP <br> | UKI-NORTHGRID-LIV-HEP <br> | ||
+ | UKI-NORTHGRID-LANCS-HEP <br> | ||
UKI-SOUTHGRID-CAM-HEP <br> | UKI-SOUTHGRID-CAM-HEP <br> | ||
UKI-SOUTHGRID-OX-HEP <br> | UKI-SOUTHGRID-OX-HEP <br> |
Latest revision as of 11:09, 13 March 2015
Staged Rollout EMI3:
Note that all components are released for SL5 and SL6, though most sites will probably migrate to SL6 within the lifetime of EMI3.
The latest SR reports can be found here. Only released Staged Rollout reports are included in the table below.
An overview of the versions currently deployed in the UK can be found here.
WLCG Baseline Versions.
Please add any details from your site/tests as you see fit.
Component | Documentation | Latest SR report | Installed at | Sites involved in SR (March 2015) |
---|---|---|---|---|
Cream with Torque | CREAM, Torque | CREAM Jan 2015March 2014 (also for generic cream) | UKI-SOUTHGRID-OX-HEP | UKI-LT2-Brunel (Torque and CREAM) |
Cream with SGE | CREAM, SGE | Feb 2015 | UKI-LT2-IC-HEP, UKI-LT2-QMUL | UKI-LT2-IC-HEP (SGE and CREAM) |
ARC-CE | ARC CE | Oct 14 | UKI-LT2-IC-HEP, Bristol, RAL x2, Oxford | (most sites install from the nordugrid repos, rather than EMI), RAL-LCG2 |
Storm | Storm SE | July 2014 | UKI-LT2-QMUL, Bristol, Sussex | UKI-LT2-QMUL |
dCache | dCache | July 2014 | UKI-LT2-IC-HEP, UKI-SOUTHGRID-RALPP | taken directly from dCache.org |
DPM | DPM | Jan 2015, DPM DSI, DPM-Argus | Brunel, Glasgow | Glasgow for DPM-Argus |
WN | EMI-WN | Oct 2014 | (almost) everywhere | |
WN (tarball) | Official link , repo (emisoft repo seems to be out of date) | Lancaster, Imperial | ||
gLexec (no tarball) | gLexec | April 2014 | (almost) everywhere | |
bdii (site) | site bdii | Oct 14 (bdii core) | everywhere | |
bdii (top) | top bdii | Jan 14 (bdii core), Oct 13 (bdii top) | UKI-LT2-IC-HEP, RAL-LCG2, Manchester | |
Argus | argus | July 2013 (SL6) | (almost) everywhere | RAL-LCG2 |
WMS | WMS | Feb 2015 | UKI-LT2-IC-HEP, UKI-SCOTGRID-GLASGOW, RAL-LCG2 | UKI-LT2-IC-HEP
|
LB | LB | July 2014 | UKI-LT2-IC-HEP, UKI-SCOTGRID-GLASGOW | UKI-LT2-IC-HEP |
APEL | parsers, publisher | Feb 2015 | everywhere | |
LFC | LFC | May 2014 | UKI-LT2-IC-HEP | (legacy service, no testing in the UK) |
UI | EMI-UI | May 2014 | RAL-LCG2 | RAL-LCG2 |
UI (tarball) | repo | (no formal testing?) | UKI-LT2-IC-HEP |
|
Squid | no link available | Jan 2015 | UKI-LT2-Brunel | Glasgow, Brunel
|
FTS3 | FTS3 | Jan 2015 | RAL-LCG2, UKI-LT2-IC-HEP | RAL-LCG2 |
MyProxy | Proxy | Can't find report. Probably filed under something else. | RAL-LCG2, UKI-LT2-IC-HEP | RAL-LCG2 |
Notes:
Current/future work towards WLCG/Experiment testing:
RAL-LCG2: We've occasionally done UI, MyProxy, ARC CE, Argus, and FTS3 (formal) staged-rollout over the past few years. FTS3 being the most recent one in January this year. I'll think we'll continue to try to do this.
For ARC CE I also do informal testing of release candidates, mainly to double-check patches I've submitted or requested relating to the condor backend scripts.
UKI-LT2-IC-HEP: FTS 3 server for ipv6 testing.
UKI-LT2-Brunel: ARC Testbed for CMS. (ARC taken from Nordugrid)
WLCG Middleware readiness: Involved in Packetmanager and Machine/job features, but projects didn't seem to go anywhere.
UKI-NORTHGRID-LANCS-HEP: Responsible for building the WN/UI tarballs
UKI-NORTHGRID-MAN-HEP: Multicore and passing parameters to the batch system testing requested by the experiments through the WLCG Task Force Alessandra chairs. On GridPP Level: VAC and Dirac testing.
UKI-SCOTGRID-ECDF: Middleware Testing WG for DPM and ATLAS. Future unclear with Wahid leaving.
UKI-SCOTGRID-GLASGOW: For DPM, Sam is trying out new versions of DPM but that’s working with the product team so I’m not sure if that counts as Staged Rollout as it’s the step before that.
UKI-SOUTHGRID-OX-HEP: We are not involved in Staged Rollout process as such but we do test stuff from time to time. I recently tested pre-release version of SAM-Nagios (SR report here) and Ewan is involved in dpm testing.
Not/No longer involved in Staged Rollout:
UKI-NORTHGRID-MAN-HEP
UKI-NORTHGRID-SHEF-HEP
UKI-NORTHGRID-LIV-HEP
UKI-NORTHGRID-LANCS-HEP
UKI-SOUTHGRID-CAM-HEP
UKI-SOUTHGRID-OX-HEP
UKI-SCOTGRID-ECDF
Return to Staged Rollout page.