Difference between revisions of "RAL Tier1 weekly operations castor 03/11/2017"
(Created page with "Parent article: https://www.gridpp.ac.uk/wiki/RAL_Tier1_weekly_operations_castor == Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this wee...") |
|||
Line 8: | Line 8: | ||
3. What are we planning to do next week? | 3. What are we planning to do next week? | ||
− | + | 1. Facilities Headnode Replacement | |
4. Long-term project updates (if not already covered) | 4. Long-term project updates (if not already covered) | ||
Line 32: | Line 32: | ||
== Operation problems == | == Operation problems == | ||
− | |||
− | |||
− | |||
− | |||
== Operation news == | == Operation news == | ||
− | |||
− | |||
− | |||
== Plans for next week == | == Plans for next week == | ||
− | |||
− | |||
− | |||
− | |||
== Long-term projects == | == Long-term projects == | ||
Line 67: | Line 56: | ||
Ensure that Fabric is on track with the deployment of the new DB hardware | Ensure that Fabric is on track with the deployment of the new DB hardware | ||
− | |||
− | |||
GP to talk to AL about service ownership/handover of the xroot manager boxes | GP to talk to AL about service ownership/handover of the xroot manager boxes | ||
== Staffing == | == Staffing == | ||
− | |||
− | |||
− | |||
− |
Revision as of 17:44, 2 November 2017
Parent article: https://www.gridpp.ac.uk/wiki/RAL_Tier1_weekly_operations_castor
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
1. Facilities Headnode Replacement
4. Long-term project updates (if not already covered)
1. SL7 upgrade on tape servers 2. SL5 elimination from CASTOR functional test boxes and tape verification server 3. CASTOR stress test improvement 4. Generic CASTOR headnode setup
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
Operation news
Plans for next week
Long-term projects
Tape-server migration to aquilon and SL7 upgrade: initial
CASTOR stress test improvement
Configure multiple instances of a CASTOR generic headnode
Drain and decommission/recommission the 12 generation disk servers
Actions
RA to check if the disk server setting, changed to bring disk servers back more quickly after a CASTOR shutdown, is still in place
Ensure that Fabric is on track with the deployment of the new DB hardware
GP to talk to AL about service ownership/handover of the xroot manager boxes